Post Job Free

Resume

Sign in

material specialist

Location:
San Jose, CA
Salary:
$18.00 hr
Posted:
May 28, 2017

Contact this candidate

Resume:

NESE M CHUNG

San Jose, CA ***** Cell: 408-***-**** Email: ac0iyb@r.postjobfree.com

OBJECTIVE: To secure a Sr. Production Control Materials Specialist position with growth and advancement opportunities.

EXPERIENCE: All Quality And Services, Inc. 12/2016 to 4/2017

Shipping Clerk

Performs data entry and use of MRP and shipping software.

Prepares and packs product for shipping to customers.

Cut packing slip, generates shipping labels.

Packs and ships Finished Goods (FGI).

Using UPS, FedEx, Bills of lading for shipping.

Mega Force 10/2015 to 9/2016

Stockroom Clerk

Maintain receiving inventory/non-inventory materials, MRB and Supplier transactions using PC/MRP.

Count & verify parts/put parts in bin. Make labels for inventory components.

Release and receiving manufacturing work orders in PC/MRP.

Update bill materials at Excel files for shortage report.

E Systems Technology 7/2013 to 10/2015

Sr. Production Control Materials Specialist

Maintain receiving inventory/non-inventory materials, MRB and Supplier transactions using PC/MRP.

Maintain production control by kitting, receiving manufacturing work orders in PC/MRP.

Solving work order problems, daily shortage report.

Organized several inventory locations.

Performing daily updates and problem solving as assigned.

Topcon Medical (formerly OptiMedica) 4/2006 to 7/2013

Medical Device Manufacture to ISO 13485 & ISO 9001, Inventory/Stock Rooms Auditing By FDA,FDB, ISO 13485, TUV, ETL.

Sr. Production Control Materials Specialist

Maintain receiving inventory/ non-inventory materials, and RTV transactions using Microsoft Dynamics Great Plains (GP).

Maintain production control by opening, kitting, receiving manufacturing orders in GP. Manufacturing work order variances were reviewed and works in process problems were resolved.

Analyzed GP transactions problems for works in process and

Inventory items, notifying management of potential shortages. Analyzed ‘can build’ scenarios for future production and inventory planning

Keep the stockrooms setup for existing and new products. Move items to obsolete and slow-moving locations. Reorganized several inventory locations and a remote warehouse. This optimized storage space and improved the organization, making kitting easier.

Performed cycle/stock counts daily, improving inventory accuracy from 90% to 99.9% accuracy.

Ran various GP ‘clean-up’ utilities to keep system running at the highest level.

Assisted Director in man GP coding updates and other problem solving as assigned.

Lumenis (formerly Coherent Medical Group) 5/1991 to 4/2006

ECO Drafter/Engineering Department Assistant

Acted as the liaison for the R&D Component Engineering process, including the input and editing of data into the current MRP System (MFG Pro).

Responsible for incorporation of redline changes for Engineering Change Orders via use of Canvas to create engineering drawings.

Detailed use of ASK Manman MRP system for updating of component changes as well as creating and posting PDFs of component changes on the server for global use.

Used FileMaker/Pro to input calibration data on approximately 1500 pieces of equipment used throughout manufacturing; updated Calibration Certifications.

Assisted during FDA/BSI Audits in finding Certs and Calibration data.

Used Excel to update methods (work instructions with pictures)

Used Microsoft Word for tabulated specification drawings.

EDUCATION: Copper Connection, Inc., Santa Clara, CA

Professional PCB Design (Certificate)

California Drafting Academy, San Jose, CA

Courses: Electro-mechanical Drafting (Certificate)

REFERENCES: Available upon request.



Contact this candidate