Tanmay Desai
ac0g4t@r.postjobfree.com +1-607-***-**** www.linkedin.com/in/tdesai1
EDUCATION
Binghamton University Binghamton, NY Completed: May 2017
Master of Science, System Science and Industrial Engineering
Revenant courses: Supply Chain Management, Quality Assurance, Applied Multivariate, Advanced topics in Integrated Manufacturing, Probability and Statistics, Modelling and Simulation
L.J Institute of Engineering and Technology (GTU) Ahmedabad, India Completed: May 2015
Bachelor of Engineering, Mechanical Engineering
Revenant courses: Manufacturing Processes, Machine Design, Machine Design and Industrial Drafting, Engineering Drawing, Kinematic of Machines, Dynamitic of Machine, Operations Research.
SKILLS
Process Improvement: Lean Six Sigma – Green Belt Certified, DMAIC, KAIZEN, JIT, TPS, 5s
Simulation and Data Analysis: Minitab, MATLAB, SAP, SAS, MS Excel, SIMIO, ARENA
Designing Packages: AutoCAD – Autodesk Certified, SolidWorks
EXPERIENCE
Student Manager and Representative Sodexo – Binghamton, NY January 2016-May 2017
Supervised and direct 57 student employees to run aa on campus dining hall.
Provide suggestions to increase efficiency and productivity by implementing 5s techniques.
Schedule shifts and assign responsibilities to student workers and train them for different operations.
Enhance student employee working environment by recommending new strategies and ideas as active team member of Student Employee Advisory Team (S.E.A.T) serving as link to community liaison to settle employee grievances.
Production Plant Intern Erhardt+Leimer – Bhadaj, India August 2014–May 2015
Studied the workflow of web guiding system production from manufacturing to assembly.
Completed and maintained accurate and organized records, documents and reports.
Did two projects as below with production manager.
Improving Machine Utilization of Plant August 2014
Improved machine utilization of production plant at erhardt+leimer by redesigning a Jig/fixture in AutoCAD® which can hold more work piece at time than before.
As result after implementing this fixture the machine can produce 3 times the product than before.
Productivity Improvement by redesigning Assembly Workstation February 2015
Used principles of ergonomics and redesigned the assembly workstation.
Were able to decrease the assembling time and increase the productivity at Erhardt+Leimer.
Updated department work instruction and reports on regular basis.
ACADAMIC PROJECTS
Optimization of Bank Note Supply Chain of Central Bank August 2016
Developed a simulation model in SIMIO to simulate bank note supply chain and compared different scenarios and came up with the inventory system with which central bank could fulfill maximum number of banknote orders from the banks with minimum transportation cost of replenishments.
Decision Support System September 2016
Applied Microsoft Excel and Visual Basic to design a support system that acts as a virtual soccer selection management team that will select the best soccer team of 11 out of pool of 1000 players per the different situations.
Patient Flow in Emergency Department of Hospital May 2016
Developed a simulation model of an emergency department using SIMIO. Tested scenarios and their impact on patient throughput and waiting time by performing different replications.