Experience:-
1.Company :- Sant Tukaram Sahakari Sakhar Karkhana Ltd. Kasarsi, Pune.
Period :- From March 1999 to Feb 2004
Post :- Assistant Boiler attendant ( Baggas Fired Boiler)
Working Pressure – 32 kg/cm 32TPH.
Duties Performed :-
1.Firing the boiler and maintaining the pressure as per Requirement.
2.Maintaince of Boiler, internal and external cleaning,taking hydraulic testing and complete assembly for boiler imspector from time to time so as to give trouble free service to reduce loss of production.
3.Take boiler for shut down to clean furnace, damper setting,watetr level maintain for need water, D.M. plant regeneration.
4.Arranging to man power and handle to them, watch over baggas and maintain stock as per requirement.
COMPLETED 2 nd CLASS BOILER ATTENDEND IN FEB 2003.
2.Company :- Briocia Pharma India Ltd. Jejuri, Pune
Period :- From Feb 2004 to Oct 2004
Post :- Boiler operator ( Oil Fired Boiler )
Working Pressure – 10 kg/cm 3TPH,2TPH
Duties Performed
1.Maintaining pressure, cleaning diffuser plat, electrodes Nozzles etc.
Periodically.
2.Softener regeneration maintaining level of F O in day as well as storage tank and giving blow down checking PH and Hardness etc.
3.Monthly cleaning of Boiler, like internal and external cleaning, gauge cleaning and complete assembly.
3.Company : Transparnt Energy Sysreams Pvt. Ltd.
Period :- From Oct. 2004 to March 2005
Post : - Boiler Operator ( Coal Fired Boiler )
Working Pressure – 21 kg/cm 5TPH.
Duties Performed :-
1. Firing the boiler and maintaining the pressure as per Requirement.
2. Maintaince of Boiler, internal and external cleaning,taking hydraulic testing and complete assembly for boiler imspector from time to time so as to give trouble free service to reduce loss of production.
3. Take boiler for shut down to clean furnace, damper setting,watetr level maintain for need water, D.M. plant regeneration.
4. Arranging to man power and handle to them, watch over coal and maintain stock as per requirement.
4 Company : Total Finelf India Ltd. Mahpe, navi Mumbai
Period :- From April 2005 to Des. 2005
Post :- Boiler Operator ( L.D.O. Fired boiler )
Working Pressure – 10 kg/cm 1.5TPH.
Duties Performed -
1.Maintaining pressure, cleaning diffuser plat, electrodes Nozzles etc.
Periodically.
2.Softener regeneration maintaining level of L.D.O. in day as well as storage tank and giving blow down checking PH and Hardness etc.
3.Monthly cleaning of Boiler, like internal and external cleaning, gauge cleaning and complete assembly.
5. Company :- Gennova Bio-Pharma Ceutieal Ltd. Hinjawadi, Pune.
Period : Jan 2006 to oct 2007
Post :- Boiler operator ( Oil Fired Boiler )
Working Pressure – 10 kg/cm 3TPH,2.5TPH
Duties Performed :-
Total operating and Maintainance of Boiler:
1.M.I.D.C. Inter water treatment by chlorination, Multigrade filter, above carbon filter.
2.Boiler feed water treatment by softner and regeneration.
3.Handling of DM plant, regeneration of cation and Anion bed.
4.Handling of reverse Osmosis system and ultra filtration system.
5.Sanitization of total water system.
6. Company :- Sant Tukaram Sahakari Sakhar Karkhana Ltd. Kasarsi, Pune.
Period :- From oct 2007 to jully 2008
Post :- second class Boiler attendant ( Baggas Fired Boiler)
Working Pressure – 32 kg/cm 32TPH.
Duties Performed :-
1. Firing the boiler and maintaining the pressure as per Requirement.
2. Maintaince of Boiler, internal and external cleaning,taking hydraulic testing and complete assembly for boiler imspector from time to time so as to give trouble free service to reduce loss of production.
3. Take boiler for shut down to clean furnace, damper setting,watetr level maintain for need water, D.M. plant regeneration
4. Arranging to man power and handle to them, watch over baggas and maintain stock as per requirement.
COMPLETED FIRST CLASS BOILER ATTENDEND IN JULLY 2008
7. Company :- Sant Tukaram Sahakari Sakhar Karkhana Ltd. Kasarsi, Pune.
Period :- From Jully 2008 to Nov 2008
Post :- First class Boiler attendant ( Baggas Fired Boiler)
Working Pressure – 32 kg/cm 32TPH.
Duties Performed :-
1.Firing the boiler and maintaining the pressure as per Requirement.
2. Maintaince of Boiler, internal and external cleaning,taking hydraulic testing and complete assembly for boiler imspector from time to time so as to give trouble free service to reduce loss of production.
3.Take boiler for shut down to clean furnace, damper setting,watetr level maintain for need water, D.M. plant regeneration.
4.Arranging to man power and handle to them, watch over baggas and maintain stock as per requirement.
8.Company :- Dyaneshawar Sahakari Sakhar Karkhana Ltd. Dnyaneshwarnagar, Bhende Bk
Period :- From March Nov. 2008 to April 2012
Post :- First class Boiler attendant ( Baggas Fired Boiler)
Working Pressure – 67 kg/cm 80TPH.
Duties Performed :-
1.Firing the boiler and maintaining the pressure as per Requirement.
2.Maintaince of Boiler, internal and external cleaning,taking hydraulic testing and complete assembly for boiler imspector from time to time so as to give trouble free service to reduce loss of production.
3.Take boiler for shut down to clean furnace, damper setting,watetr level maintain for need water, D.M. plant regeneration.
4.Arranging to man power and handle to them, watch over baggas and maintain stock as per requirement.
9.Company :- Shri Vighnahar Sahakari Sakhar Karkhana Ltd. Nivruttinagar( Junnar. Pune)
Period :- From April. 2012 to till date
Post :- First class Boiler attendant/D.C.S.Opreator ( Baggas Fired Boiler)
Working Pressure – 87 kg/cm 80TPH.
Duties Performed :-
1.Firing the boiler and maintaining the pressure as per Requirement.
2.Maintaince of Boiler, internal and external cleaning,taking hydraulic testing and complete assembly for boiler imspector from time to time so as to give trouble free service to reduce loss of production.
3.Take boiler for shut down to clean furnace, damper setting,watetr level maintain for need water, D.M. plant regeneration.
4.Arranging to man power and handle to them, watch over baggas and maintain stock as per requirement.
Education Background :-
Passed S.S.C. from Ambavane in march 2002.
Passed second class Boiler attendant from Mumbai in Feb 2003
Passed first class Boiler attendant from Mumbai in Feb 2008