Abdulmoeen A. Al-Yousif
Dammam, Saudi Arabia,
Mobile:+966*********
Home:+966*********
ac0ebb@r.postjobfree.com
Personal information
Objective
Nationality : Saudi
Date of Birth: 2-14-1988
Status : Married
Seeking a challenging position to acquire high degree of technical
knowledge and skills in Business Development Manager jobs.
Experience
2016-Now
Business Development Manager
INTERNATIONAL COMPETITOR
TRADING & CONSTRUCTION & PETROLEUM
Responsible For Generating Revenue And Looking For New Opportunities For Growth In The Industry Through Meeting With Clients. In Addition Make Sure That Business meets both sides.
Responsible For Introducing And Presenting New Technologies in The Market.
Work on Tenders and Tenders Submission And Follow Up on The Results.
Works on TTR's And Pre-qualification Documents.
Marketing The New Technologies in The Market.
Follow up with All Client Departments To Get The Required Qualifications.
Negotiates Pricing, Products Delivery And Service Delivery With Client.
Responsible For Presenting And Introducing Six Different Companies Under International Competitor.
Field Supervisor General
2014-2016,BAKER HUGHES Company,Saudi Arabia Bahrain.
Wellbore Intervention.
Wellbore cleanup,Whipstocks,Fishing,Milling,cement retainer, Retrieving tools,
Compression set service packers full bore tubing tester,Remediation
and stimulation.
Completion systems.
Lower completion,Liner and wellbore isolation systems,Screen systems, External Casing Packers.
Field Supervisor
2012-2014 Schlumberger Company, Al-Khobar.
Fully assemble clean out job 9 5/8’’, 7’’ and 4 1/2’’ with Chemical.
Stimulation jobs
WELL COMMISSIONER Liner-Top Test Tools
HEAVY DUTY RAZOR BACK CCT
BRISTLE BACK.
RAZOR BACK CCT with INTEGRAL TOP DRESS MILL,
MULTIBACK Casing Cleaning Tool,
RAZOR BACK
RIDGE BACK BURR MILL,
SWITCHBACK SCRAPER,
CLUTCH-TYPE, HEAVY-DUTY MFCT,
DUAL-ACTION BYPASS SUB
PORTED BYPASS SUB
WELL COMMANDER Circulating Tool
WELL ISOLATION TOOL
Wellhead Cleaning Tools
WELL COMMANDER,PBL SUB
Cementing.Supervisor III
2009- to 2012 BAKER HUGHES Company, Al-Khobar
Pumping cement for Saudi Aramco rigs in different area
Field Engineer
2008-2009 Well Flow Company, Al-Khobar
Fully assemble clean out job 9 5/8’’, 7’’ and 4 1/2’’ with Chemical
Stimulation jobs
HDC XREAM, HDC MARK II, FERROUT, KOPLUS LO, Tar Clean, Cut Clean, Power Wash and WPI-1002 to be effective at dissolving and dispersing tubing dope.
Sr. Operator, logging and Perforating Dep.
2007-2008 Schlumberger, Al-Khobar
Operator, Elec / Mech Tech L&P Assoc, Open Hole logging Dep.
2005-2007 Halliburton, Al-Khobar
Education
Cambridge collage, Canada
2003-2005
Diploma
Courses
AFT training includes (Cement advanced, advanced Eng., service tools advanced, advanced equipment pumps and cement)
Remedial Systems By Baker Hughes Training.
Basic of Mechanic (Prince Mohammed Bin Fahad for qualifying)
Fire Fighting.
H2S, First Aid and CPR from SRS training services
Defensive Driving.
English Courses (Canada).
Ms Office.
Safe forklift operation and maintenance training
HUET including EBS
Web Based Training
Anti-Bribery Compliance including the FCPA:Understanding the Law.
Baker Hughes Liner Systems .
BHI New Hire Orientation .
Commitment to Upstream Process Safety.
Continually Learn and Improve.
Dropped Objects.
Electrical Safety Fundamentals.
Equipment and Hand Tools Safety.
Hazard Identification.
Hydraulic Set Liner Hanger / Liner Packer System - Non-Cemented.
Incident Reporting.
Information Security and Data Protection Essentials.
International Workplace Harassment - Employee Version.
Introduction to Achieve.
LHA - BHI Liner Products.
LHA - Product Line Awareness - What are the customers needs.
Managing Risks.
Our Business Code of Conduct.
Overview of the Baker Hughes Competence Management Program (CMP).
Overview of the BHI HSE&S Management System – MS.
Overview of Wellbore Construction.
Personal Protective Equipment .
Safe Manual Handling - Non-Office.
STOP Work .
Understanding Hazards and Risks.
Upstream Process Safety.
Cement Mixing and Pumping.
Truck Treating.
Acido.
Cement Batch Mixer.
Cement bulk Truck.
Pumps.
Las Aux Cemet Equipment.
Truck Treating.
BHI Qualification Workplace Assessment
1.Mechanical Set Casing Exits.
2.Conventional Fishing Specialty Reversing Tool.
3.Liner Hanger /Packer System Set With Hydraulic Setting Tool for Top Set Packer Non Cemented .
4.Workover Systems-Mechanical Set.
5.Welbore Isolation-Uniform Flow with Mpas.
6.Ream In Liner Hanger System-Non-Cemented.
7.Wellbore Isolation-Plug Back Operations-ECP with
P And A Kit.
8.Float In Liner Hanger System-Non Cemented.
9.Cemented Process For Liner Hanger Packer System.
10.Mechanical Set Liner Hanger –Liner Packer System-Non-Cemented.
11.Liner Hanger Tieback Installation.
12.Hydraulic Set Liner Hanger-Liner Packer System-Non cementd.
13.Wellbore Isolation Stage Cementing ECP with PAC Valve.
References are available on request.