DETAILED RESUME
ABDUL HAFIZ ABDUL LATHIEF
PERSONAL DETAILS
POSITION : CONSTRUCTION E&I ENGINEER /QS ENGINEER E&I /ASSISTANT QC E&I
ENGINEER
ADDRESS : HAFIZ MAHAL, NEAR MUHIYIDEEN MOSQUE, KAYAMKULAM, KERALA
690502, INDIA
CONTACT DETAILS : INDIA MOB (919*********),(917*********)
INDIA LANDLINE (0091-479-***-****)
DATE OF BIRTH : 20 NOVEMBER 1983
PLACE OF BIRTH : KAYAMKULAM, KERALA, INDIA
CIVIL STATUS : MARRIED
DEPENDENTS : 3
CITIZENSHIP : INDIAN
PASSPORT NUMBER : G8890131
EMAIL ID : ac0dut@r.postjobfree.com
ARAMCO ID : 8906964
KJO ID : 049-0068
SAUDI IQAMA ID : 226-***-****
SKYPE ID : hafizmahal
EDUCATIONAL BACKGROUND
BACHELOR OF ELECTRONCS AND INSTRUMENTATION ENGINEERING,ANNA UNIVERSITY PASSED IN NOV 2006
DIPLOMA COURSE IN OIL INSTRUMENTATION PASSED IN FEB 2007
DIPLOMA IN PLC PROGRAMMING FROM GLOBAL AUTOMATION TRIVANDRUM BASED FIRM
CAREER OBJECTIVE
A skilled and experience construction engineer with expertise in competitive technical assessments and team management in depth experience of regulatory, compliance quality engineering looking for a challenging position to utilize my strength and ability in the instrumentation field
CARRER PROFILE
I had 9 years of active and progressive experience in the field of Electrical and Instrumentation construction projects mainly aramco based, maaden based projects with different phase of electrical engineering from electrical to instrumentation practices. Involved in the preparation of bid proposal, estimating and project executions. Design review E/I drawings for construction. Prepare project work schedule in preparation of project execution. Prepare installation and project commissioning procedures of E & I equipments.
PERFORMED AREAS
Worked with various multidiscipline engineers for mechanical completion and close out activities of oil, gas, water, flow line and trunk line projects.
Supervision of offshore hook up of various electrical and instrumentation package devices.
Participated in Method statement preparation, material take off and construction network planning.
Verifications and Inspection of Explosion proof (EEx) Electrical and Instrumentation Equipments.
Quality Control and implementation. Review, correct as required multi discipline ITPS, Procedures, Drawings & Vendor Data sheets, Material Specifications.
Quantity surveying with a solid background on re-measurements, pricing, tender and various identification of electrical and instrumentation works.
I.WORK EXPERIENCES
POSITION : INSTRUMENTATION AND CONTROL ENGINEER
COMPANY : ALROBAYA HOLDING COMPANY
PROJECT : KHAFJI –TANAJIB SOUR GAS PIPELINE PROJECT 104 KM FLOW LINE
(Valued @ 230 million SAR)
DURATION : DECEMBER 2016- PRESENT
DUTIES AND RESPONSIBILITIES
Understand the Project Standards and ensure the design meet the requirements.
Executing quality assurance of technical content in electrical and instrumentation works. Over sight of various phases of project including organization, scheduling and submittal reviews, development and implementation of work plans.
Witnessed Preparations Verification testing activities, reviews Functional Description/Method of statements for every testing works and ensure the related safety aspects are in place.
In-charge of quality inspection for the process and final completion procedure conforming per approved project specification and standard prior to final acceptance and hand over to the client.
Expedited the procurement phase of the project.
LIST OF INSTRUMENTS HANDLED DURING THIS PROJECT
oMotor Operated Valve Actuator LEEDEN MAKE
oGas Over Oil Operated Valve CAMERON MAKE
oPressure Transmitter ABB MAKE
oTemperature Transmitter WIKA MAKE
oScrapper Passage Instruments CIRCOR ENGINEERING
oPressure Gauge BAUDEN MAKE
oGas Detection Systems DETCON AND EATON MAKE
LIST OF INSTRUMENT RELATED PACKAGES HANDLED DURING THIS PROJECT
oRemote Terminal Unit EMERSON MAKE
oCorrosion Inhibitor SKID AES MAKE
oCorrosion Monitoring System COSASCO EQUIVALENT MAKE
oGas Metering Skid KHRONE MAKE
oBattery Charger ARABIAN ELECTRIC MAKE
DESCRIPTION OF ACTIVITIES
Installation of corrosion monitoring probes flush type coupon at scraper launcher and receiver station not limited to installation of field junction boxes, serial to Ethernet converter junction box, server and workstation.
Installation of sectionalizing valve and emergency isolation valves at 5 valve stations and its conduiting and termination activities.
Installation of scrapper passage indicator switch at 5 valve station, and manual scrapper passage indicator in scrapper launcher and receiver station package.
Installation of seven remote terminal unit to interface through scada platform
Installation of pressure transmitters at 5 valve station including lateral line of launcher and receiver stations.
Installation of temperature transmitters at 5 valve station including lateral line of launcher and receiver stations.
Installation of gas detection instruments at scrapper launcher and scrapper receiver area
Installation of gas metering skid package, analyzer shelter package, flow computer, workstation in scrapper launcher area.
2 WORK EXPERIENCES
POSITION : ENGINEERING SUPPORT
COMPANY : ALROBAYA HOLDING COMPANY
PROJECT : INSTALLATION OF DATA ACQUISTION SYSTEM FOR SAOO WATER
INJECTION WELLS PROJECT
DURATION : 0.6 years
DESCRIPTION OF ACTIVITIES
Installation of one RTU Shelter.
Installation of instrumentation stands with preinstalled analog junction box.
Installation of one RMU mounting support.
Installation of 2 solar panels with loose combiner junction box for installation on rtu shelter.
Installation of one battery box.
Installation of 19 batteries with internal electrical connector.
Installation of 2 system power cables for connection of solar panels and battery box to rtu.
Installation of RTU cabinet on RTU Shelter.
Installation of 3 pressure transmitter with mounting bracket and manifold
Installation of 1 dp pressure transmitter with mounting bracket and manifold.
Installation of temperature element (RTD) with temperature transmitter.
Installation of 1 RMU unit including antenna.
Installation of 1 communication monopole.
Installation of 1 Lightning arrestor system for monopole.
Installation of 1 Yagi antenna (335-375 MHz) for monopole.
Installation of RF installation material
Installation of Surge protector for monopole feeder cable.
3. WORK EXPERIENCES
POSITION : ENGINEERING SUPPORT FOR ELECTRICAL& INSTRUMENTATION,
QUANTITY SURVEYING
COMPANY : ALROBAYA HOLDING COMPANY
PROJECT : ELECTRICAL AND INSTRUMENTATION HOOKUP OF 14
OFFSHORE PLATFORMS AND ONE INTERMEDIATE INJECTION
PLATFORM (VALUED AT 40 MILLION SAR)
DURATION : 1.3 YEAR
DUTIES AND RESPONSIBILITIES
Generate the progress report activity on daily basis.
Provide the engineering support for both electrical and instrumentation discipline to achieve the project with minimum errors.
Prepare the material request package to procure all the facilated items to be installed in the platforms.
Prepare the bill of materials.
DESCRIPTION OF ACTIVITIES
Electrical Scope
Installation Of Switch Rack, Transformer,Splice Box, Both LV And HV Electrical Distribution Board, Installation Of Lighting System For The Whole Deck, Grounding Distribution For Whole Deck, Installation Of Primary And Secondary Cable Tray Routing For The Entire Deck, Installation Of Battery Charger And Stationary Batteries,Cable Pulling Including Primary And SECONDARY subsystem for the entire deck. Termination and glanding for all the cables.
INSTRUMENTSCOPE:
Installation of Marshalling Cabinet, Field Junction Boxes and Field Instruments for Measuring Flow, Level Pressure and Temperature. Impulse Tubing For Pressure, Flow and Hydraulic Valves. Installation of both Primary and Secondary Cable Tray System for Entire Instrumentation System. Cable Pulling Including Both Primary And Secondary Subsystem For The Entire Deck. Termination Glanding for All the Cables
LIST OF INSTRUMENTS HANDLED DURING THIS PROJECT
oMotor Operated Valve Actuator ROTORK MAKE
oPressure Transmitter YOKHOGAWA,SIEMENS MAKE
oTemperature Transmitter YOKHOGAWA MAKE
oScrapper Passage Instruments CIRCOR ENGINEERING
oPressure Gauge WIKA MAKE
oFlame Open Detector DETCON MAKE
oH2S AND LEL DETECTOR GENERAL MONITORS MAKE
LIST OF INSTRUMENT RELATED PACKAGES HANDLED DURING THIS PROJECT
oRemote Terminal Unit & Marshalling Unit
oHIPPS PACKAGE
oBATTERYCHARGER
4. WORK EXPERIENCES
POSITION : ELECTRICAL AND INSTRUMENTATION FIELD ENGINEER
COMPANY : ALROBAYA HOLDING COMPANY
PROJECT : ELECTRICAL AND INSTRUMENTATION PHASE OF MAADEN ALUMINIUM
ROLLING MILL PROJECT (VALUED AT 20 MILLION SAR)
DURATION : 1.5 YEAR
DESCRIPTION OF ACTIVITIES
Installation of the Embedded Conduit in the HRM Area, HCM Area, TCM Area.
Installation of electrical and instrumentation cable tray in substation building area.
Installation of remote terminal units in control room.
Installation of field junction boxes.
Installation of cable tray supports inside the trench.
Installation of motor control centre in Process /Control buildings.
Supervision Of More Than 200 Thousand Meters Of The Instrument Cable Pulling From Each Designated Electrical Switch Room In The HRM Area, HCM Area, TCM Area
5. WORK EXPERIENCES
POSITION : ELECTRICAL AND INSTRUMENTATION FIELD ENGINEER/ASSISTANT QC
ENGINEER
COMPANY : ALROBAYA HOLDING COMPANY
PROJECT : CONSTRUCTION OF 3 OIL WELL HEAD FLOWLINES TIE INTO 16.0,8.0”
TRUNKLINE (VALUED AT 8 MILLION SAR)
DURATION : 1.3 YEAR
DUTIES AND RESPONSIBILITIES
Seconded to oversee the activities and ensure that all the instrumentation construction and testing works adhere to aramco plant quality and standards.
Follow up Field Quality Control plan, witness and hold as determined by ARAMCO SATIPS.
Responsible for documentation for Quality Control.
oField Quality Control Plan
oQC Records
Issue internal NCR.
Witnessed calibration of all the instruments and signed their individual calibration certificates. Generated Punch list for every system.
Monitor and witness loop checking activities of the miscellaneous instruments.
DESCRIPTION OF ACTIVITIES
Installation of permanent down hole monitoring system.
Installation of motor operated valves in Production Header and Test Line Header.
Installation of choke valve in flow line valve.
Installation of temperature transmitter.
Installation of Upstream and Downstream pressure transmitter.
Installation of Analogue Junction Boxes.
Installation of Disconnect Switch in tie in area and in flow line.
LIST OF INSTRUMENTS HANDLED DURING THIS PROJECT
oMotor Operated Valve Actuator ROTORK MAKE
oPressure Transmitter FOXBORO MAKE
oTemperature Transmitter FOXBORO MAKE
oCHOKE VALVE EIM
6. WORK EXPERIENCES
POSITION : ELECTRICAL AND INSTRUMENTATION FIELD ENGINEER/PRELIMINARY QC
INSPECTOR
COMPANY : ALROBAYA HOLDING COMPANY
PROJECT : CONSTRUCTION OF GAS WELL 1001 TIE TO REMOTE HEADERIN HAWIYAH
AND GAS WELL 714 IN SHEDGUM TIE TO WELL 444-F/L VALUED @ 7 MILLION
SAR
DURATION : 0.9 YEARS
DESCRIPTION OF ACTIVITIES
Field supervision of construction activities which includes cable trench Excavation, duct bank activities.
Field supervision of analog and digital junction box support frames.
Cabling from Analog and Digital Junction Box to Siemens Fail Safe Based R.T.U.
Installation of Active Cooled Shelter.
Installation of Corrosion Inhibitor Skid Package.
Installation of Hydraulic Operated Well Shut down Panel.
Installation of Battery Bank and Battery Charger Systems.
Installation of Distribution Panel Board serving 480 v Loads& power panel serving 208/120v loads.
Installation of pressure monitoring instruments on downstream and upstream of choke valve.
Installation of cp test station & cp bonding station.
Installation of venture flowmeter and flow metering system.
Provide lighting system near well head cellar area.
LIST OF INSTRUMENTS HANDLED DURING THIS PROJECT
oMotor Operated Valve Actuator ROTORK MAKE
oPressure Transmitter SIEMENS MAKE
oTemperature Transmitter SMAR TT 300 MAKE
oH2S AND LEL SENSOR GENERAL MONITOR MAKE
oFLAME DETECTOR DETECON MAKE
oFLOW METER YOKHOGHAWA MAKE
7. WORK EXPERIENCES
POSITION : ELECTRICAL AND INSTRUMENTATION FIELD ENGINEER
COMPANY : ALROBAYA HOLDING COMPANY
PROJECT : HARADH AND HAWIYAH MANIFOLD EXPANSION PROJECTS VALUED @ 15
MILLION SAR
DURATION : 1.5 YEARS
DESCRIPTION OF ACTIVITIES
Field supervision of construction activities which includes cable trench Excavation, duct bank activities.
Field supervision of analog and digital junction box support frames
Fabrication of Instrument and Junction box frames support and stands.
Cable Glanding, Cable Termination, Interpanel Cabling from MOV To Local Control Panel To R.T.U.
Cabling from junction Box to Siemens Fail Safe Based R.T.U.
Installation of heat tracing system on relief header for both khuff and jauff area.
Installation of retractable type corrosion coupons in khuff and jauff relief header area.
Installation of gas detection systems and control panel.
Installation of platform and area light on jauff relief, khuff relief header,khuff and jauff manifold expansion area.
Installation of pressure transmitter and temperature transmitter in each production header.
LIST OF INSTRUMENTS HANDLED DURING THIS PROJECT
oMotor Operated Valve Actuator ROTORK MAKE
oPressure Transmitter SIEMENS MAKE
oTemperature Transmitter SMAR TT 300 MAKE
oH2S AND LEL SENSOR GENERAL MONITOR MAKE
LIST OF INSTRUMENT RELATED PACKAGES HANDLED DURING THIS PROJECT
oRemote Terminal Unit
oBATTERYCHARGER
oGAS DETECTION CONTROL PACKAGE
oHEAT TRACING SYSTEM
oCORROSSION MONITORING SYSTEM
8. WORK EXPERIENCES
POSITION : GRADUATE INSTRUMENTATION ENGINEER TRAINEE
COMPANY : TRAVANCORE COCHIN CHEMICALS
DURATION : 1.0 YEARS
PERFORMED DUTIES AND RESPONSIBILITIES
Calibration of Control Valve,
Repairing on Positioners,
Working Experience on Relay Panel Wiring,
Calibration of Pressure Gauge,
Handling Knowledge of DCS and SCADA (Yokoghawa & Eurotherm)
Handling Knowledge of Communicators
DECLARATION
I hereby declare that above information is true to the best of my knowledge and belief.
ABDUL HAFIZ ABDUL LATHIEF
PLACE : KAYAMKULAM
DATE : 13 APRIL 2017