Otis L. McDonald Jr.
New Caney, Texas 77357
**********@*****.***
Objective
To obtain a position that will utilize my skills and knowledge and experience.
Skills Summary
20 years of related controls experience.
11 years as Project Manager.
Design and Engineering custom Control Panels.
Design and Engineering custom RIE buildings.
Estimation.
9 years as I & E designer.
Autocad.
3D modeling Navisworks 2015 using plant Design Management System.
Field trip, Field verification, sketches and notes for equipment electrical and instrument layouts.
Working closely with engineers, construction and design team.
P&ID developments.
Controls Details
PLC equipment: Allen Bradley, Siemens, Yokogawa, Honeywell, ABB, Delta V.
Loops, schematics, logic diagrams
NEC, NFPA, ISA, UL, IEC, API500
Experience
July 2007-Sept 2016
Optimize Process Design
Katy, Texas
I & E Designer:
Mid-stream gas processing and utilities plant design
Duties included:
Creating electrical and instrument design drawings such as wiring and layout drawings for the DCS and SIS Control panels, Junction boxes mounted in our plants, ESD circuit thru out the plant, motor schematics 5kv-480v, lightning plans, Develop the Instrument & Electrical plot plans, the safety plot plans, conduit and cable schedules, material takeoff, bill of materials, IO list Development, working with Vendor drawings to interconnect with the DCS and SIS Controls.
PROJECTS
Mont Belvieu Fractionator Ironhorse Cryogenic Gas Plant
DESIGN, Fabricate, and Install: DESIGN, Fabricate, and Install:
100 MBPD Fractionator 150 MMSCFD Cryogenic Gas Plant
150 GPM Amine Unit Puraspec H2S Treating
28 GPM Dehydration Unit 2 Solar Tarus Residue Compressor
Eagle ford Cryogenic Gas Plant
DESIGN, Fabricate, and Install:
3 - 310 MMSCFD Cryogenic Gas Plants
3 - 310 MMSCFD Amine Units
3 - 327 MMSCFD TEG Dehydration Units
3 - 327 MMSCFD Mole Sieve Dehydration Units
7 - Mars Residue Compressor
March 1994-July 2007
PANELMATIC Texas, Inc.
Houston, Texas
Project Manager:
Control panels and RIE buildings
Duties included:
Creating wiring and layout drawings for control panels and RIE buildings. Primary communication for customer related services. Prepared job estimates and bill of materials lists, as well as building Control panels, Pneumatic panels and RIE building with customer supplied specifications. Daily use of Excel, Word, Access in Microsoft Office
April 1988-March 1994
American IMS
Houston, Texas
Field Service Technician
Field service repair on mail room equipment
Duties included:
Responsibilities included the repair of mechanical and electronic mailing equipment.
Education
National Education Center Houston Texas
March 1986-March 1988
Associates of Applied Science
Electronic Engineering Technology
References
Leonard Simoneaux - Senior E&I designer Optimized Process Designs – 281-***-****
David Allen – Electrical Engineer, Optimized Process Design – 281-***-****
Richard Bailey – General Manager, Panelmatic Texas Inc. – 713-***-****
More references upon request