Post Job Free
Sign in

Manager Engineer

Location:
Accra, Greater Accra Region, Ghana
Posted:
July 03, 2017

Contact this candidate

Resume:

*

**

JAN DEKKER

TH

DUTCH

MARCH ****

MARRIED

+233-***-***-*** ac04by@r.postjobfree.com

ac04by@r.postjobfree.com

NAME OF INSTITUTION YEAR

EDUCATIONAL BACKGROUND

L.T.S 1972 - 1977

DUTCH ARMY 1978 – 1982 TECHNICAL SPECIALIST

1. XARA DEVELOPERS LTD. TAKORADI

WORK EXPERIENCE

POSITION PROJECT DIRECTOR

DATE CURRENTLY

ABOADZE COASTAL PROTECTION WORKS

EQUIPMENTS

• CAT.345 Excavator

• CAT.336 Excavator

• CAT.330 Excavator

• Manto Vanni Benne GR 4.5 Grapple

• Manto Vanni Benne GR 2400 Grapple

• Manto Vanni Benne GR 3400 Grapple

2

2. AMANDI QUARRY. TAKORADI

POSITION QUARRY MANAGER

DATE 2013

SET UP WORKSHOP AND OFFICE AND QUARRY FACE

EQUIPMENTS

• Cat 345 Excavator (2)

• Pay loader 966h

• D6 Bull

• Crusher: Extec C12 + Jaw

• Maxtrack 1000 Cone Terexpegson

• Chieftan 2100 Power Crushers

3. C.G.E .BURKINA FASO

POSITION QUQRRY MANAGER

DATE 2012 – 2013

ROAD PROJECT .BENIN: NATTINGOU

EQUIPMENTS

• Atlas Copco Power Crusher

• CAT.330 DL Excavator (2)

• Atlas Copco Drilling Rig D7

• CAT.966H Pay Loader

• MAN Dump truck

4. PRIMESTONE QUARRIES. TAKORADI

POSITION TECHNICAL MANAGER- MAINTENANCE/REPAIR

DATE 2011 -2012

EQUIPMENTS

• Crusher Metso Lokotrack

3

• Jaw LT 110

• Cone LT 454

• Excavators

• CAT 330 DL

• CAT 325 CL

• CAT 966H Pay Loader

• A.C Drilling Rig D3

5. A.J FANJ CONSTRUCTION TLD - KUMASI

POSITION CRUSHER ENGINEER – MAINTENANCE/ REPAIR

DATE 2008 – 2011

CRUSHING OF LIMESTONE FOR GHACEM CEMENT

EQUIPMENTS

• Terex Pegson 4242 SR Impactors (3) on tracks

• Giporec 774 impactor on track

6. B.C.C CRUSHING AND CONSTRUCTION LTD. SHAI HILLS POSITION SITE ENGINEER

DATE 2004 – 2008

CRUSHING, MAINTENANCE, REPAIR AND PRODUCTION

EQUIPMENTS

• Tellsmit Static Plant

• Jaw 1200 and 800

• Cone 1300 and 900

• Screen 4 deck

• DG Bull Dozer

• CAT 345 Excavator

• CAT 330 Excavator

• Wheel loader 966

• MAN Dump trucks

4

7. H.I.T. INTERNATIONAL LTD - TEMA

POSITION MECHANICAL ENGINEER

DATE 2002 – 2004

REPAIR AND MAINTENANCE OF VOLVO GENERATORS THROUGHOUT WEST AFRICA MAINTENANCE OF LINDE FORLIFTS

8. SELF EMPLOYED

DATE 1998 - 2004

WELDING, FABRICATION AND MECHANICAL JOBS ON CRUSHING PLANTS. ALL DIFFERENT KIND OF JOBS THROUGHOUT GHANA

EQUIPMENTS

• Parker Tellsmit

• Terex Pegson Nordberg

• Sandvik

• Etc

9. FRANDESCO AND PARTNER LTD - TAMALE

POSITION SITE MANAGER, MAINTENANCE, REPAIR AND PRODUCTION DATE 1996 – 1998

TAMALE – PAGA ROAD PROJECT

EQUIPMENTS

• Parker Semi Mobile Plant

• Jaw 1000 and 800

• Screen 3 Deck

• Atlas Copco Drilling Rig

• E.R.F. Dump trucks

• CAT Wheel loader

• J.C.B Excavator

5

10. VERMEER GHANA LTD

POSITION SUPERVISOR-WELDING, PIPE FITTING AND CONSTRUCTION DATE 1990 – 1996

• 6’’ (96KM) Oil Transportation Pipeline from Tema to Akosombo Port.

• 8Km Oil Transportation Pipeline Rehabilitation from New Takoradi GOIL depot to Takoradi Port for MINISTRY OF MINES AND ENERGY.

• Earthwork, Steel Construction, Cladding and Installation of Bottling Plant for COCA COLA BOTTLING COMPANY. GHANA. At Tema Spintex Road.

• Rehabilitation of 56km Water Pipeline in Accra Central for GHANA WATER AND SEAWAGE COPERATION.



Contact this candidate