Post Job Free
Sign in

Project Manager Engineer

Location:
Miami, FL
Salary:
80000
Posted:
June 29, 2017

Contact this candidate

Resume:

Carlos A. Pena

********@*******.*** – ***** SW **th Ter; FL 33193 – 813-***-****

SUMMARY

Hans on mechanical engineer with good affinity for software interfaces and CAD. Team player and always looking to apply new tools to improve processes. Additional experience in dealing with external customers and address midsize crows. Excellent research and troubleshoot skills. Bilingual proficiency (Eng/Spa) able to translate documents if is need it. 16 years of experience in the professional field half as a Project manager for engineering projects.

OBJECTIVE

To work in an engineering environment committed to provide quality products and services at reduce costs establishing long term business partnerships with suppliers and customers.

Skills

-Strong analytical, planning, organizational, and conflict resolution skills.

-Ability to communicate with all levels of a project team.

-Software: AUTOCAD 2000-2012, Solid Edge 2012 (beginner), MS Project, OBD II Scan Tools, Solid Works V11, Windows XP, 7 and 10.Advance MS Office package, Excel, Word, Power Point, Adobe writer editor, Photoshop, CMS work order software, e-Gordian

-PM tools: Root cause analysis, SIPOC, Process flow chart, Pareto charts, KPI, Lean Six Sigma tools, FMEA, VSM.

Language:

Proficient in spoken, read, listen and written Spanish and English.

Education

1997- 2001 Universidad del Norte – Barranquilla, Colombia

BS in Mechanical Engineering, College of Engineering

PROFESIONAL QUIALIFICATIONS

Jackson Memorial Hospital, FL 1/2016 – Present.

Project Manager/Compliance and regulations (Project value from $1,000 up to $150,000)

Oversee from concept to final product renovation and new construction projects related to infrastructure.

Follow ACHA, JCT and NFPA requirement for projects.

Provide Risk Assessment and ILSM if is required.

Direct supervision of vendors and internal employees.

Graphic implementation of scopes of work to provide a clear view to upper management about project needs. (Power Point presentations)

Provide additional support to the PM program thought KPI’s and charts to show productivity and downtime.

Analyze current requirements of PM program and update or create new PM rounding and supporting documents.

Vendors and suppliers evaluations of performance.

Apply Excel pivot tables and calculations to analyze data.

Develop quick references pdf files for technician that helps them to understand the procedure to be completed.

Maintain PM documentation update with ACHA, NFPA and JCT standards.

Review PM documentation and trace indicators.

Uses of Excel pivot tables to display PM data to upper management.

Use Excel to create new ways to track and update PM information.

Create reports to show upper management, utilities consumption, OT vs Savings, etc.

Achievement:

oDaily before and after report with photos to keep record of unauthorized storage violation on basement. (power point)

o Link between Excel files using hyperlinking to update Over Time report for upper management. (Excel)

oGraphic scope of work using layers to shows location using Google Earth satellite pictures and field pictures.

oRoll out PM control sheet to track and record filters change and lower inventory levels.

oCreate tracking report for life safety/fire protection WO that counts delayed days in Excel.

Jackson Memorial Hospital, FL 6/2015 – 1/2016

Stationary Engineer

Perform PM readings and data collection of Chillers and Boilers.

Maintain chemical levels for water treatment plant.

Supervise work done by vendors on Chillers and Boilers.

Analysis consumption data and set the best cost effective settings.

Act as supervisor in charge for weakened shift and direct priority in services.

Achievement: Create and updated form to track PMs done to vacuum pumps and compressors.

Insurance Service – NJ 11/2010 – 6/2015

Field Representative in Miami, Florida

Risk data analysis collector for commercial and big residential complex.

Fire protection evaluation, public and wind mitigation surveys.

Codes to comply NFPA and OSHA.

Provide risk analyst recommendations.

Self-schedule and budged business trips.

Analyze fire sprinkler protection and confirm that complies with NFPA requirements.

Achievement:

Usage of multi layers pictures to provide a clear description of risk.

Apply Google Sketch up to provide a clear view of risk associate to property.

Chubb Colombia Insurance Company, Colombia 4/2009- 9/2009

Loss Control Engineer

Performs and evaluates a survey of risk conditions in clients’ facility. This involved conducting formal interview to various departments within the facility that included safety and security follow ups of their compliance.

Elaboration of written report stating the controlled and uncontrolled issues of the facility and providing such report to the underwriter for further evaluation and following NFPA and OSHA standards

Consequent quarterly follows ups and suggest modifications to current processes to lower client’s risks

Evaluation and implementation of new loss control services according to clients’ needs.

Tecnoglass, Colombia 3/2004- 2/2009

Project Manager (Project value from US$100,000 up to $1.5millions)

Performs AUTOCAD detailed architectural drawings of window solutions for specific clients. Implementation of dynamics block to save drawing editing time. Use of multiple layers and object libraries to increase edit timing.

BOM using Excel

Shipping and tracking of deliveries.

Create manufacturing instructions and installation documents. Provide additional layouts required for railings before concrete pouring.

Field supervision for railing and windows installation. Provide on field solutions to unexpected problems related to installation.

Follow up and troubleshoot installation issues and provide detailed excel reports

Knowledge of assembly solution, troubleshooting in cooperation with RC Aluminum, business partner of Tecnoglass.

Achievement: Create a dynamic CAD library using AUOCAD dynamic block to edit fast the assembly blueprints for the most common system used.

CERTIFICATIONS

-Certified Lean Six Sigma Green Belt from Florida International University (May 2017).



Contact this candidate