Post Job Free

Resume

Sign in

Project Manager Construction

Location:
Kings County, NY
Posted:
June 26, 2017

Contact this candidate

Resume:

PROFESSIONAL EXPERIENCE

Out of the Ground

Boutique Hotel- 12 East 48th Street- New Out of the ground 128 Key High-Rise Hotel. Hidrock Properties. Drilled caissons and mat slab foundation system, monolithically poured Concrete Superstructure with a 3D panel Facade system. A finger building located on 48th Street Logistically challenging location with a limited access SOE and foundation scope and coordination with owner furnished FF&E. 50 Million

250 Fifth Avenue Thomson Hotel. A new tower connected to a Landmarks Mansion on Fifth Avenue. Double depth Cellar and sub Cellar, Zero Access agreement with the neighboring garage made for an interesting SOE and Foundation design. Large portions of the existing façade had to be shored up and maintained during Construction. Additional Stories and penthouse added to the existing mansion. High end interior finishes and custom millwork throughout the hotel. Empire Management- Ohebshaloms – 125 Million

17 West 24th Street- 22 Story Boutique Hotel and Restaurant by Jean Kaufman Architects- a 22 Story sliver Building in Chelsea, that Consisted of underpin- ning rock excavation, solider piles and lagging, the demolition of an Existing 4 Story Townhome for the erection of a Monolithically poured concrete Building with an "Equitone" Composite panel skin on a rain screen system

National Rent a Car- 5 New Buildings on an existing Site that had to stay functional and operational during construction. A Logistically challenging Project that included the demolition of existing fueling stations and tanks, Car wash buildings, Car rental Buildings and Car servicing stations with New. Entire Site need to be bought to a new Grade, New greywater drainage, Parking systems, Asphalt paving, Asphalt pavement markings, Waiting Canopies, Helical Piles and Footings for new Buildings, Veeder-Root fueling systems and fuel tanks with complex control diagrams and relays built into the safety systems.

GWB Hotel - a proposed 80 Million Dollar 400 Key mixed use hotel and conference center with robotic parking, an Olympic sized swimming Pool, spa and sports complex, three restaurants, twelve elevators and 4 escalators. Monolithically poured concrete superstructure with a precast concrete skin and Curtain walls.- The Alpine Group

Landmarks Renovation

62 Wooster Street- An 8 story Landmarks Building in SOHO that was like building a New Building within the fascia of an existing building. New Underpinning de-watering and Superstructure within the existing Shell. New Structural Steel spanning from the basement to the Roof for an outdoor swimming pool and Penthouse. The highest end luxury Condominiums with statuary bronze finishes and Hand rubbed plank flooring over a multilayered acoustical underlay- ment.

40 Peck Slip- The NYPD Superior Officers Council- Another project that was like building a building within a Building. Two stories added to a four story Landmark Building, an Elevator Added, Micro piles and footings to support the new steel that spans from the first floor to the penthouse. Full gut demolition and Motion monitoring of adjacent Buildings.

School and Institutional

Fashion institute of Technology- Estimator and Project manager for The "A" Building Lobby Renovation. David Smotrich and Partners. Fast track Renovation of The "A" building lobby Consisting of Retrofitting existing Wood Metal Atrium railings with Custom glass panels, New Millwork, Light Fixtures and Tel Data Infrastructure to allow students internet access and Faculty Access control.

Fashion institute of Technology- Estimator and Project manager for The David Dubinsky Faculty Lounge Renovation. David Smotrich and Partners. Custom

perforated metal panel ceiling system with integral lighting that looked like metal ceiling panels when not illuminated. Lutron lighting controls and bms tie-ins. a very high end finished product.

MTA Police Facility Merrick Station- New Police station- Estimator/PM. A New Police facility for the MTA Brooklyn College-Roosevelt Hall- 10 million multi phased Interior renovation of - Estimator/PM Brooklyn College- ADA Upgrades- Estimator

Banks, Office interiors and Retail

Washington Mutual Bank- 50 New Retail Bank Roll out

Fried Frank Harris Shriver Jacob- One New York Plaza- 4.8 mil dollar project that lead into a 50 million dollar 10 year tenant fit out.- Construction Manager/ Chief Estimator

New York Presbyterian Suite for Occupational Services-1.2 Mil. Chief Estimator Scientific America-1.8 mil. Construction Manager/ Chief Estimator

Facconable 636 Fifth Avenue- 25 Mil.

Center for Architecture 534 LaGuardia -8 Mil. Nordstrom- Multiple East Coast Locations -19-25mil Washington Mutual Bank Multiple locations-350-650k., Home Depot 23rd st NYC -15 mil.

Sothebys-35 mil. Concrete Project Manager

New York Public Library- 10 mil. Concrete Project Manager / Estimator

EMPLOYMENT HISTORY

The Rinaldi Group

Senior Estimator

•12 east 48th Street- 50 Million Dollar out of the ground high-rise Hotel

•250 5th Combination LA/New out of the ground Tower Hotel 125 Million

•50 Million Dollar out of the ground high-rise Hotel Million

Stalwart Construction, LLC.

Vice President of Estimating and Procurement

•Langham Hotel 400 5th Avenue - Multi Million dollar Renovation and Upgrades - Construction Manager/Estimator

•Marriot Fairfield Inn-North Bergan, NJ 11 Million Dollar Out off the Ground 100 Key Hotel

•Boutique Hotel- 17 West 24th Street- New Out off the Ground 22 Story Bldg -Preconstruction CM 12Mil Budget

•Residential Condo- 327 East 22nd Street-Preconstruction, Construction New Out of the ground Residential Condo

ICS Builders, Inc. Chief Estimator

•Father Flannigan's Boys Town- $1.4 to 8.5 Million dollar Design Build Fast Track projects - Construction Manager

•TD Bank - Multiple locations ranging from $1.2- 3.5 Million Dollar Build Outs

•Christ Church Park Avenue- 2.5 Million Dollar Project

•National Rent a Car- 15.5 Million Dollar Project- Multiple New Out of the Ground Buildings, New Fuel Tanks.Fueling stations New Vehicle service and rental Buildings

•Fed Ex- Multiple Locations throughout the east Coast Ranging from 100- 800 K

•Columbia University- Multiple projects ranging from 100- 1.2m

•Fashion Institute of Technology Lounge-1.2 mil Estimator & Construction Manager for a Cutting Edge Design Project

CNA Enterprise, Inc. Project Manager/Estimator

•MTA Police Facility Merrick Station- New Police station- Estimator/PM

•Brooklyn College-Roosevelt Hall- 10 million - Estimator/PM

•Brooklyn College- ADA Upgrades- 3million -Estimator/PM

•Fashion Institute of technology "A" Lobby renovation -Estimator/PM

Aufbau, LLC CEO, Owner

18th street Condominiums Design Build

Americon

Chief Estimator

Fried Frank Harris Shriver Jacob- One New York Plaza- 4.8 mil dollar project that lead into a 50 million dollar 10 year tenant fit out.- Construction Manager/ Chief Estimator

Interior Construction Corp Chief Estimator

•New York Presbyterian Suite for Occupational Services-1.2 Mil. Chief Estimator

•Scientific America-1.8 mil. Construction Manager/ Chief Estimator

Ibex Construction Corp

Estimating/Purchasing/IT Development

•Facconable 636 Fifth Avenue- 25 Mil.

•Center for Architecture 534 LaGuardia -8 Mil.

•,Nordstrom- Multiple East Coast Locations -19-25mil

•Washington Mutual Bank Multiple locations-350-650k.,

•Home Depot 23rd st NYC -15 mil.

RCC Concrete Company Estimator/ Project Manager

•Sothebys-35 mil. Project Manager

•New York Public Library- 10 mil. Project Manager / Estimator

•Haagen-Dazs -1.5mil Project Manger

Mead & Josipovich Estimator/ Project Manager

•The highest end Residential Millwork in NYC. It is untactful to name the clients.

Superior Casework Position: Chief Estimator

•Merrill Lynch -2.5 mil, Darby & Darby 1.2 mil

•Dorsey Whitney 950k

•Guggenheim Museum-550k

•Atlantic Philanthropic & Co 1.3 mil

•Bank Of America- 750k

•Morgan Stanley -2.5 Mil, Paine Webber 1.7 mil



Contact this candidate