Post Job Free

Resume

Sign in

Piping Designer

Location:
Bandung, West Java, 40526, Indonesia
Salary:
85000
Posted:
June 25, 2013

Contact this candidate

Resume:

RIZMAN FITRI YANDHI

Piping Designer

Resume

SUMMARY

Over (17) seventeen years of experience in various areas in Mechanical/Piping and Pipeline Engi-

neering Details practice in petrochemical, Oil and Gas offshore/onshore Design/Drafting. Areas

of expertise includes drafting, design engineering, estimates, as-built, preventive and Maintenance

and engineering including Mechanical, piping, technical specification evaluation along with inter-

discipline and coordination of design.

PERSONAL DATA

Nationality : Indonesian

Education : Senior High School

Marital Status : Married

Bandung, 04th October 1975

Place & Date of Birth :

Address : Kp Babakan Sari No.10 RT 01/IX Padasuka Cimahi 40526

Bandung – West java – Indonesia

Contact : Home (62-22-664****

Mobile +62-81-222-******

E-Mail : abzh66@r.postjobfree.com or abzh66@r.postjobfree.com

Passport No. : S 732237

Education : Senior High School.

Computer skills

PDMS, AutoCAD, Auto plant and Microsoft Office.

Training/Courses

Basic Offshore Safety Induction Emergency Training - Megamas Sdn Bhd, Brunei Darussalam)

H2S Induction Training Course – Safety Technical Services Co. Ltd (Malaysia)

HSE Induction Training Course – Safety Technical Services Co. Ltd (Malaysia)

PTW Permit to Work Course – Safety Technical Services Co. Ltd (Malaysia)

EXPERIENCES

Jan 2011 – On Going

Lead/Sr. Piping Designer – PT Amec Berca Indonesia

RUBY FIELD DEVELOPMENT PROJECT

ORF Ruby Tie-In Project EPSC2 – Senipah, East Kalimantan - Indonesia

Job Description :

Responsible to prepare Standard Piping Hook-up, Plot plan, Key plan, 3D Modelling (PDMS) and

Review 3D Modelling, coordination with all discipline to get data supported. Organize, distribute

and provide feedback to the team for the scope of work will be done in accordance with the pro-

gress schedule that is given. Conduct meetings and evaluate the work every week, seeking input

and solutions for improvement when the project running. sharing of knowledge to the team.

All above duties and responsibilities applied to Total E&P Indonesie.

Page 1

RIZMAN FITRI YANDHI

Piping Designer

Resume

Jul 2011 – December 2011

Piping Checker – PT Amec Berca Indonesia Fabrication Engineering (For Chirag Oil

Project) Baku – Azerbaijan

Job Description :

Responsible for checking isometric drawing extract from PDMS spooler for Fabrication Spools to

finalize Isometric fabrication and erection, coordination with other internal discipline to get finalize

data and document data supported.

- Review PDMS 3D model for design of pipe route and pipe support location.

- Extract special pipe support drawing and isometric drawings

Areas expertise for drilling facilities and topside Process area.

All above duties and responsibilities applied to BP Exploration Azerbaijan.

Jan 2009 - Jun 2011

Sr. Piping Designer - Perunding Ranhill Worley Sdn Bhd – Miri,

Sarawak - East Malaysia.

Job Description :

Responsible for Provision of maintenance Engineering Services Contract (MESC), Attached to IR

Project (Integrity Restoration Project) Under MESC Contract for (13 Platform Offshore facilities) :

- Involve in different phases of a project from Front End Engineering Design (FEED) stage to

Detailed Design.

- Attend meetings with clients on various projects, solving any project discrepancies and

technical related issues.

- Attend various In-House product presentations by local and international vendors.

- Checking and approving of engineering drawings (Piping Plans, Isometrics, P&IDs) before

issuing to clients

- Prepare and familiarize with the Material Take-Off List (MTO) for different projects

- Review vendor drawings prior to drawing approval for procurement

- Involved in numerous contact point corrosion and manual valves replacement project un-

der the Integrity Restoration (IR) Team

- Lead the mechanical / piping team to offshore for project workscoping at various platforms

for replacement Line pipes,manual valves and U-Clamp (Pipe Support Contact Point

Modification Details).

- Perform site survey to checking and confirmation P&ID, Piping Sizes, Physical condition

configuration for replacement and re-design

- Collect all the above data offshore survey technical and information to enable the piping

work to be prepared and carried out.

- All Above duties and responsibilities applied to SSB.

April 2008 – Dec 2008

Sr. Mechanical/Piping Designer – Electrowatt-Ekono (B) Sdn Bhd, Brunei

Page 2

RIZMAN FITRI YANDHI

Piping Designer

Resume

Job Description:

Involved in the offshore complex (Champion 7 Platform) Firewater revamp project

Design activities comprised the replacement of existing firewater system (CS) with the new GRE

piping, upgraded to cover the extended process facilities on all the platforms in the Champion 07

offshore complex. The study of the existing piping arrangement, preparation of a demolition

scheme in the phase manner so as to keep the system alive and available at all times by parallel

laying of the new assembly, except for a minimum shutdown period as required for the hook-up of

the new assembly, was conducted at site. The relevant piping plan drawings, demolition plan

drawings, Tie-in schedules, constructional isometrics and material Take-off for the GRE/Non-GRE

materials constituted the design package.

Project Involved :

* Replacement for Potable & Industrial Water Tank Maura.

* HVAC System for BSP Head Office.

* BLNG Stress Analysis Report for 60kg Steam Header.

Job Description:

Prepare and generate deliverable Mechanical and Piping Work for Offshore for BSP Brunei Shell

Petroleum. This includes site survey, Design, Corrects and Amends Pipe routing, Piping GA, iso-

metric drawing and material take off. procedures of detailed Piping plans and Isometrics, Repair

and Replacement of existing Process Piping and Pipe support, writes and Prepare Material requisi-

tions. Perform site survey to check and confirm P & ID, piping sizes, physical conditions, configu-

ration for re-design. Collates all of the above onshore survey technical data’s and information to

enable the piping work to be prepared and carried out.

All above duties and responsibilities applied to BSP.

Oct 2007 - Mar 2008

Sr. Piping Designer – JP Kenny (Wood Group Indonesia)

For Banyu Urip FEED Update

Job Description:

PT Wood Group Indonesia has been awarded the Contract for Banyu Urip FEED Update for ap-

proximately 71 km onshore and 23 km Offshore Pipeline from Banyu Urip – Bojonegoro to off-

shore of Tuban, East Java, Indonesia

Scope of Work: Onshore pipeline engineering design

Drafting & Design Pipeline route 71 KM onshore Pipeline, Prepare crossing Typical Drawings and

generate alignment sheet drawings, plan and profile, Prepare Receiver and Launcher Piping De-

tail for FEED, Prepare Isometric Bulk MTO.

May 2007 – Oct 2007

Sr. Piping/Pipeline Designer – Electrowatt Engineering (Muscat, Oman)

Oman Gas Company Development Gas Project (OGC Project)

Page 3

RIZMAN FITRI YANDHI

Piping Designer

Resume

Job Description:

(Murayrat – Barka Field Facilities) Under Electrowatt Engineering work management system and

detail engineering.

Prepare and generate 24” Gas line from Murayrat to Barka Pipeline Route 38 Km, for Alignment

Sheet Drawing, Plan and profile, Terrain Surface/Rock profile, pipeline Markers, crossing Detail

Drawings and Pipeline detail drawings.

Prepare and generate Mechanical and Piping Work Packages for Launcher and Receiver area.

This includes of detailed piping plans and Isometrics, demolition and replacement of existing

Piping, Writes and prepared Material requisitions.

Above duties and responsibilities applied to Oman Gas Company

Pipeline Designer – Petroleum Development Oman

South Oman Harweel Phase -2 Project, (PDO Project)

Job descriptions:

Revised Alignment sheet drawings, Plan and profile drawings and details drawing for lines:

18” Oil Flow Line 89,4 Km

16” Gas Export Pipeline 28,44 Km

10” Gas Injection Trunk line 6,3 Km

Prepare Hydro test Diagram Drawing, Road crossing, Wadi crossing, Pipe crossing, Buried FOC

(Fibber Optical Cable) drawings, Trenching Details, Working Strip details, UT & Corrosion Moni-

toring Pit details and Pipe Marker details Drawings.

This project Completed, all the drawing Submitted Issued for Construction.

Above duties and responsibilities applied to Petroleum Development Oman

Apr 2006 Mar 2007

Mechanical Designer – SKSWOOD Sdn Bhd, Kuala Belait, Brunei Darussalam

Brunei Shell Petroleum (SCO/2 Offshore Static Equipment Maintenance Engineering

and Services Campaign Operation Contract

Job description:

Prepare and generate deliverable Mechanical and Piping Work Packages for Offshore Static Main-

tenance campaign and Project Offshore Construction for BSP East and West. This includes Cor-

rects and Amends procedures of constructability of detailed Piping plans and Isometrics, Repair

and replacement of existing Process Piping and Pipe supports Inspection of Pressure vessels,

Riser Inspection, Writes and prepare Material requisitions both short and long lead items, Writes

and amend Engineering Work Orders, Construction Work scopes, Mat link, Man-hour estimates,

Fabrication Work Order and Site instructions.

Above duties and responsibilities applied to Brunei Shell Petroleum Sdn Bhd

Jan 2004 – April 2006

Mechanical / Piping Designer – Wood Group Indonesia, Jakarta

CNOOC (Offshore Expansion Equipment Maintenance Operations)

Job Description:

Page 4

RIZMAN FITRI YANDHI

Piping Designer

Resume

Prepare and generate deliverable Mechanical and Piping Work for Offshore for CNOOC South east

Sumatra Asset. This includes site survey, Design, Corrects and Amends procedures of detailed

Piping plans and Isometrics, repair and replacement of existing Process Piping and Pipe support,

Writes and prepare Material requisitions.

Perform site survey to check and confirm P & ID, piping sizes, physical conditions, configuration

for re-design.

Collates all of the above offshore survey technical data’s and information to enable the piping

work to be prepared and carried out

Above duties and responsibilities applied to CNNOC.

As Pipeline Designer - Totlfina Elf (Tambora Field Development Project Phase 2)

Job description:

Drafting & design pipeline route 10 km Flow line 24” and 8”, alignment sheet drawings, plan and

profile, HDD section drawings, river crossing section drawings and pilling layout drawings.

As Pipeline Designer - Amerada Hess (UJUNG PANGKAH Development)

Job Description:

Drafting & Design pipeline route on subsea (40 Km), alignment sheet drawings, plan and profile

and layout drawings.

As Pipeline Designer - Korean Development Company (KODECO)

Job Description:

Drafting & Design pipeline route on Sub Sea, alignment sheet drawings, plan and profile and

layout Drawings.

Sep 2002 - Dec 2003

Piping Designer – Aker Kvaerner Indonesia, Jakarta

Peciko Onshore Development EPSC-2 Phase -4 Project

Job Description:

Work Management System Detail Engineering and Design.

Prepare and generate deliverable Mechanical and Piping Work for Onshore for TotalFina Elf This

includes Quality control, design, Corrects and Amends procedures of detailed Piping plans and

Isometrics, Pipe support, Writes and prepare Materials.

Collates all of the above onshore survey technical data’s and information to enable the work

packages to be prepared.

Above duties and responsibilities applied to TotalFina Elf.

Jun 2001 - Sep 2002

Piping Designer – Reka Patria Ekaguna

Peciko Onshore Development EPSC-2 Phase -3 Project

Job Description:

Page 5

RIZMAN FITRI YANDHI

Piping Designer

Resume

Seconded to Sempec Indonesia, Work Management System Detail Engineering and Design.

Prepare and generate deliverable Mechanical and Piping Work for Onshore for TotalFina Elf This

includes Quality control, design, Corrects and Amends procedures of detailed Piping plans and

Isometrics, Pipe support, Writes and prepare Materials.

Collates all of the above onshore survey technical data’s and information to enable the work

packages to be prepared.

Above duties and responsibilities applied to TotalFina Elf.

Sep 1999 Jun 2001

Piping Designer – Rekayasa Industri, Jakarta

Kalimantan Timur (Pupuk Kalimantan Timur IV Project)

Job Description:

Prepare and generate deliverable Mechanical and Piping Work for Onshore for Pupuk Kalimantan

Timur. This includes Quality control, design, Corrects and Amends procedures of detailed Piping

plans and Isometrics, Pipe support, Writes and prepare Materials.

Collates all of the above onshore survey technical data’s and information to enable the work

packages to be prepared.

Above duties and responsibilities applied to Pupuk Kalimantan Timur-IV Project.

Piping Designer – (Onshore Development TEL Pulp & Paper)

Job Description:

Seconded to Tanjung Enim Lestari Pulp & Paper, Work Management system maintenance and as-

built. As-built for Piping work included Piping Plot Plan, Piping Isometric, Mechanical Drawing

and P & ID revised, Line check, prepare and generate deliverable mechanical and Piping Work

Packages for Onshore. Design, Corrects and Amends procedures of construction of detailed Pip-

ing plans and Isometrics, Pipe support.

Perform site survey to check and confirm the Tie-in, piping sizes, configuration assessment.

Collates all of the above onshore survey technical data’s and information to enable the work

packages to be prepared and carried out.

Above duties and responsibilities applied to Tanjung Enim Lestari.

Apr 1997 Oct 1999

Piping Drafting / Designer Reka Patria Ekaguna, Jakarta

Peciko Onshore Development EPSC-2 Phase-1 Project

Job Description:

Seconded to Gema Sembrown, Work management System Detail Engineering and Design.

Prepare and generate deliverable Mechanical and Piping Work for Onshore for TotalFina Elf. This

includes Quality control, design, Corrects and Amends procedures of detailed Piping plans and

Page 6

RIZMAN FITRI YANDHI

Piping Designer

Resume

Isometrics, Pipe support, Writes and prepare Materials.

Collates all of the above onshore survey technical data’s and information to enable the work

packages to be prepared.

Above duties and responsibilities applied to TotalFina Elf.

Piping Lead Drafting - (Vico digitizing cad Conversion) Work management system as-

built and CAD conversion.

Job Description:

As-built checking and redrawn P & ID, mechanical, Piping and Electrical/Instrument drawings

Work Packages for Vico Indonesia. This includes Quality control, Design/drafting, Corrects and

Amends, detailed Piping plans and Isometrics, pipe support.

Collates all of the above onshore as-built technical data’s and information to enable the work

packages to be prepared and carried out.

Above duties and responsibilities applied to Vico Indonesia.

Piping Cad Drifting - (Premier Utility up-grade Project) Work Management re-design

Utility System.

Job Description:

Site Survey, design and drafting piping work packages for utility system and includes Quality

control, Design/drafting, Corrects and Amends, detailed piping plans and Isometrics, Pipe sup-

port.

Collates all of the above onshore as-built technical data’s and information to enable the work

packages to be prepared and carried out.

Above duties and responsibilities applied to Premier Oil.

Jul 1996 - Apr 1997

Piping Drafting – Rekayasa Industri, Jakarta

Styrene Butadiene Rubber Project

Job Description:

Work management System Detail Engineering and Design

Drafting Plot plan, Piping Plan by Auto plant design, generate Isometric Isogen and Prepare Pipe

support detail included material take, This include Corrects and Amends procedures.

Above duties and responsibilities applied to Gajah Tunggal Group.

Piping Drafting - Popka Pupuk Kalimantan Timur Project (Onshore Development)

Job Description:

Work management system detail engineering.

Drafting Plot plan, piping plan by Auto plant design, Generate Isometric Isogen and Prepare pipe

support detail included material take. This include corrects and Amends procedures.

Above duties and responsibilities applied to Pupuk Kalimantan

Page 7

RIZMAN FITRI YANDHI

Piping Designer

Resume

Jan 1995 – July 1996

Drafting / Surveyor – Fukuyama consultant, Jakarta

Land Transportation Jakarta

Job Description:

Drafting detail drawing for conjunction of Jakarta, Survey of conjunction, drafting conjunction of

Jakarta areas.

Above duties and responsibilities applied to (Land Transportation) Dinas Perhubungan Jakarta.

Page 8



Contact this candidate