CURRICULUM VITAE
Eng. ABDULAZIZ AL-KHULAQI
Methods Planning & CMMS Head
Mobile Phone Number: +967-*********
Email Address: *********.*********@*****.***
Summary of experiences
Presently with Total-Yemen LNG Company as a Methods Planning & CMMS Head from 2013
up to date. Yemen
Planning & CMMS Engineer with Total-Yemen LNG Company from 2010 up to 2012. Yemen
Methods & Planning Engineer with Total-Yemen LNG Company from 2008 up to
2010.Yemen
Planning Engineer with Total- YLNG Project from 2006 up to 2008. France
Maintenance Planner of Mechanical Rotating Equipment with Qatar Petrochemical
Company (QAPCO) from 2000 up to 2006. Qatar
Mechanical Engineer in Oil and Gas industry Contractor Company Mannai Trading
Company from 1996 up to 2000. Qatar
Project Mechanical Engineer with Red Bricks Factory from 1995 up to 1996. Yemen
Professional experience
Aug 2010 - Dec 2012 TOTAL-YEMEN LNG COMPANY SANA'A- YEMEN
PLANNING & CMMS ENGINEER
Understanding the configuring and customizing the core concepts of SAP PM
including, Master Data, Base Customizations, Technical Objects Management,
Preventive Maintenance, Maintenance Processing, Work Clearance, and Reports.
Coordination and on-going assessment of local and overseas team members
Management & coordination of local and overseas team activities, including
support, maintenance, enhancements
Liaising with key representatives from business to assess on-going support, new
system requirements and enhancements
Manage development of procedures and documentation related with technical CMMS
(SAP PM) Systems processes and security
Evaluate and design measures to improve team performance & quality of service
Be reference for CMMS (SAP PM) technical issues
Knowledge transfer, coach and assignment of training plan to team Members directly
or thought team senior Members
Assignment & monitoring of CMMS (SAP PM) related tasks, activities and projects
within the team premises on regular basis to meet business requirements in terms
of presence, flexibility and interchangeably from one side and to ensure the
proper level of quality from the other side
Control and monitoring of CMMS (SAP PM) technical cases to assure their timely and
properly solution from one side and to identify workload, weak points and possible
optimizations from other side.
Discuss SAP technical important issues with SAP Competence Center (SCC)
Report to SAP Competence Center (SCC) any detected CMMS (SAP PM) technical and
processes weakness and propose corrective actions or enhancement
Assist SAP Competence Center (SCC) with on-going recruitment, providing advice &
guidance on organizational team structure, roles & responsibilities
Support SAP Competence Center (SCC) team to fix CMMS (SAP PM) functional related
issues providing efficient and effective applications support
Managing team holiday schedules and any team absence to assure adequate team
presence all times
Report any non-conformity to the SAP Competence Center (SCC)
Management & coordination of CMMS (SAP PM) data upload activities with SAP
Competence Center (SCC)
Management of Master Data Change Requests in CMMS (SAP PM).
Preparing end user training schedule and provide CMMS (SAP PM) Training.
Providing technical support to end users for application fault investigation and
correction.
Carry out business analysis (including gap analysis) of enhancements to CMMS (SAP
PM).
Prepare Functional and Technical specifications for CMMS (SAP PM) enhancements.
Providing guidance and support for implementation of enhancement in CMMS (SAP PM).
Planning, scheduling, execution, and approval of CMMS (SAP PM) Systems Test and
User Acceptance
Strong knowledge of SAP PM with extensive involvement with requirement gathering,
writing Functional Specs, Test Scenarios, creating User Manuals, conducting End
User Training.
Run Assessments on Trades, Planners, Senior Planners, Team Leaders & Supervisor's
on SAP PM Work Management Knowledge & Skills
Ensure that all Trades, Planners, Senior Planners, Team Leaders & Supervisors are
trained in SAP PM & can achieve their Work Management Goals
Provide Solutions to Massive Backlogs & low Key Performance Issues
Monitor all SAP PM data & Provide Reports
Lead Teams to achieve Preventative Maintenance in SAP PM
Analyses Data in SAP PM to ensure good data quality on Notifications
Develop with client maintenance team to establish business processes for equipment
strategy, work identification, planning, scheduling, work execution and recording
history
Establish, monitor and report maintenance planning monthly KPI's.
Aug 2008 - Aug 2010 TOTAL-YEMEN LNG COMPANY BAL HAF- YEMEN
Planning & Scheduling Engineer
Assist the maintenance department in ensure all preventative maintenance and tasks
are planned/ scheduled to ensure minimal downtime of the 24/7 operation.
Drive planning/scheduling performance through the application and use of the Key
Performance measures.
Review backlog and allocate updated priorities with special focus on due/overdue
work orders associated with Safety Critical Equipment.
Formulate WO job plans including ordering services and materials, identifying
Health, Safety & Environmental requirements, estimating costs
Assisted with discipline supervisors, troubleshooting process/equipment problems,
identifying improvements and cost reductions and organizing shutdowns activities
Ensuring scheduled Compliance as per company guide lines
Improving performance of the plant to meet the stretched targets by minimizing the
number of stoppages and break downs
Analysis on equipment - costs and breakdowns
Direct responsibility for planning including work plan development in compliance
with safe work practices including environmental, health and safety
Managing shut downs for ongoing projects and their synchronization with running
plants (Vertical Startup of newly commissioned lines)
Maintain and continuously improve job plans
Managing SCE WOs and minimizing SCE backlog
Identifies operations logic and interfaces with engineering work, incorporates and
monitors any interfaces with project (Plant change) planning and other shutdowns.
Developed and implemented Shutdown Packages to streamline outages meeting schedule
and budget to accomplish planned scope
Preparation of job plans ready for shutdown scheduling detailing parts, materials,
special tools, external services and documentation with planned costs through SAP
Development of planning schedule started from level 1 to level 5 with integration
of various disciplines and contractor's activities were including in various
levels.
Controlling and reporting on deviations, milestones achievements and cost
reporting issuing.
Setting of shutdown control procedures by identifying shutdown strategy, policy,
procedure, activity register, priority setting, material bagging and tagging.
Job list challenging, services requirements like scaffolding, rope access and
lifting, work pack preparing, critical path setting and challenging.
Set up the planning process, integrate all schedules, and review all resources
histograms, spares and vendors expediting logistics arrangement and operating
procedures review, execution reporting process and updating the daily works.
Shutdown organization and budget setting.
April 2006 - Aug 2008 TOTAL (TOTAL-YLNG - PROJECT) PARIS - FRANCE
PLANNING ENGINEER
Maintenance & Inspection Engineering Contractor (MIEC) Activities
Act as primary interface between MIEC & company project team.
Extensive involvement with CMMS, SAP Plant Maintenance Project design and
implementation including plant asset hierarch, preventative maintenance
Monitor and check MIEC schedules and reports.
Review and analyze MIEC scheduling & planning activities.
Monitor the progress and control the planning activities.
Monitor and control the quality of documents (Manual, Equipment, Spare parts).
Monitor and control the spare parts activities.
Monitor and control the MIEC job performance according to scope of work.
Participate in the weekly and monthly meeting.
Creating the Materials Master for spare parts (MM) and prepare the MM templates
for mass uploading in to UNISUP SA/R3 according to TOTAL General Specification (GS
CA 210)
Creating of SAP templates, working with Technical Objects, creating Functional
location, equipments, Material Masters and integration with SAP modules (MM & PM)
according to the TOTAL General Specification (GS EP EXP 207)
Creating Preventative maintenance plans, Maintenance Items, setting up strategies,
creating Task lists and work scheduling according to the TOTAL General
Specification (GS EP EXP 221)
Involved in organizing data of Functional locations, equipment's, spare parts
material masters, preparing Task list & standard text for Rotating and Static
equipments.
Analysis the spare parts requirement during the pre-commissioning/commissioning
and operation phase according to TOTAL General Specification (GS EP EXP 205, 217)
by identifying the commissioning and startup spare parts, capital Spare parts,
operating spare parts, specific spare parts and wear spare parts requirement for
equipments and prepare Spare parts interchange ability records (SPIR)
Checking the created Equipment Tags in the PID's and corrected the wrong Tags
according to the Project Procedure YE-001-30-PCC-PRC-47016 and TOTAL General
Specification (GS EP EXP 205)
Issuing project progress MIEC reports on weekly & monthly basis to the management.
May 2000 - March 2006 Qatar Petrochemical Company (QAPCO) Doha - Qatar
MECHANICAL ROTATING Sr. PLANNER
Schedule the maintenance work to optimize the trades and minimize downtime and
ensuring minimum disruption to the process operation
Chair daily & weekly maintenance planning meetings with maintenance team and
production.
Review the two weeks look ahead work schedules with the Maintenance Supervisors
before implementation to ensure that the trade's person has all the applicable
resources materials/tools to perform the task.
Develop work packages dossier for yearly PM.
Plan and schedule works for all shutdowns jobs and arrange the engagement of
contract labor and procurement of equipment to carry out the work.
Liaise closely with the Supply Department to source required parts for planned
jobs
Collection, interrogation and reporting of maintenance data (e.g. equipment
downtime) and costs. Updating of maintenance records and management of maintenance
files
Prepare and maintain, in conjunction with the Maintenance Superintendent and
maintenance teams, Standard Work Instructions (SWI) for all maintenance activities
Controls the invoices received within the department, and checks validity of their
allocation.
Initiates and follows-up the mobilization and demobilization of external resources
such as the
personnel and equipment provided on call-off contracts.
Prepare shutdown work lists for major overhaul and prepare shutdown planning
Follows and reports on shutdown execution progress.
Research and solve the problems that may arise on any equipment/spare parts within
the company operations by using the manuals or direct contact with
manufacturers/vendors.
Proactively promotes through example a safe work ethic, attitude, and workplace.
Ensures safety policies, standards, and procedures are followed to achieve a safe
work environment and safety for all staff and visitors as well as the company's
safe work objectives and requirements.
Maintains effective working relationships and communications with peers,
management, and other company departments and staff. Effectively resolves any
conflicts in a timely manner to achieve a positive and healthy working
relationships and workplace environment.
Follow critical material and tracking the delivery performance of the local &
overseas supplier.
Maintain a high standard of housekeeping and participate in Planned General
Inspections.
Sep 1997 - May 2000 Mannai Trading Company Doha - Qatar
MECHANICAL ENGINEER.
Supervises the assigned planed jobs to the mechanical supervisors.
Supervise the maintenance repairs and overhauls of the rotating machines
Maintain and prepare the required PM programs (Monthly, Quarterly, Half yearly and
Yearly) for all the equipments a per OEM recommendations.
Supervise the schedule jobs according to PM programs and breakdown failure and
assign the required resources to conduct the interventions.
Reviews the materials requests and spare parts requirements characteristics,
compiles relevant materials data to update the materials long description, creates
materials catalogues and updates the master data
Ensures materials data is correctly processed. Evaluates products suitability,
manufacturing viability, etc. and promotes materials standardization
Creation of spare parts for new machines.
Follow up and coordinates with procurement department and provide technical
support for procurement of the spare parts.
Maintains and updates historic records for all equipments. Maintain technical data
book and maintenance manuals of equipment and provides technical information to
workshop
Conduct technical discussion with vendors and recommend to purchase of the most
suitable and efficient products.
Achievement
Solid background in business analysis and long-range strategic planning
Skilled in leading teams of diverse backgrounds to make sound business based on
analyses of short and long term business needs
Able to take a large conceptual problem or project, break it into components,
establish plans and a critical path, achieve incremental goals and deliver project
on time and at below budget
TOTAL-YLNG Project
Work force member with TOTAL-YLNG Project in France from 2006 up to 2008 during
Pre-Ops phase. Prepare and optimize the two years operation spare parts for the
LNG plant and prepare the Materials Master (MM) templates. Also prepare the Plant
Maintenance tasks for mass upload in to SAP/R3 by using PM templates (Functional
location, equipment, Characteristic, Classification, maintenance plan, maintenance
group, object items, task list, work center, sub work center, planner group,
maintenance assembly and bill of material BOM).
Qatar Vinyl Company
2004 Prepare master files for the critical equipment and spare parts inventory of
Qatar Vinyl Company (QVC) and collects inputs and maintains data for a wide
variety of major and minor mechanical equipment installed in QAPCO area
facilities, and produces user manuals and spare parts to facilitate proper
maintenance of the equipment to improve the maintenance availability &
reliability.
Qatar Petrochemical Company
Member of stock revamp team in Qatar Petrochemical Company from 2002 up to 2003,
were the materials inventory reviewed and update the short description, long
description and adjusting the Min/Max according to the materials consumption,
criticality, complexity and delivery time. Link the correct materials to the
functional location.
Erect Red Bricks Factory
Erect Red Bricks Factory in 1995 under Italian company supervision with daily
capacity of 500 ton. Install the clay hopper, milling machine, conveyer belt,
rolling machine, mixing machine, extruder machine, cutting machine, dryer fans,
dryer & furnace trolley and packing line.
Education
1991 - 1995 University of Aden -Faculty of Engineering -Aden
Bachelor of Science (Honor) in Mechanical Engineering - C.G.P.A 3.74
1985 - 1990 Industrial Technical Institute - Aden
Diploma in Mechanical Engineering - C.G.P.A 3.96
Skills
Skill
Skills level
CMMS (SAP/R3)
Primavera P6
MS Project
MS Access
MS Word, Excel and Power Point
Expert
Expert
Expert
Intermediate
Expert
Languages
Arabic
Mother tongue
English
Expert
Urdo
Intermediate
French
Basic
Training Courses
Safety while working on or near electrical installation presented by QAPCO
training and development section from 25/03/01 to 26/03/01.
WWT unit mechanical training presented by QAPCO training and development section
from 02/05/01 to 02/05/01.
Screw compressor training presented by QAPCO training and development section from
06/06/01 to 07/06/01.
Salt transportation unit-mechanical refresher presented by QAPCO training and
development section from 13/08/01 to 14/08/01.
Piping & instrumentation diagram reading presented by QAPCO training and
development section from 10/09/01 to 10/09/01.
Pumps & compressors presented by National Consulting Bureau from 18/03/02 to
21/03/02.
Mechanical seals presented by National Consulting Bureau from
06/05/02 to 08/05/02.
Basic of mechanical seals & its applications in QAPCO presented by QAPCO training
and development section from 12/12/02 to 12/12/02.
Environmental awareness briefing presented by QAPCO training and development
section from 29/04/03 to 29/04/03.
Primavera scheduler training presented by QAPCO training and development section
from 16/12/04 to 19/12/04.
First aid presented by QATAR PETROLEUM corporate training department from 27/02/05
to 02/03/05.
Planning & scheduling presented by TECHINCAL CONSULTANCY LIMITED from 22/05/05 to
26/05/05.
LNG safety & technology presented by TOTAL CONSULTANT from 21/11/2006 to
24/11/2006.
First Aid Training in accordance with French Regulations presented by SOS from
9/4/2008 to 9/4/2008.
Planning & Scheduling with Primavera Project Planner (P3) training presented by
PrimaFrance from 16/6/2008 to 17/6/2008.
Leadership and team dynamics in oil & gas projects presented by CWC from
10/11/2008 to 13/11/2008
SAP training for PM module in TOTAL Head Quarter (France - Pau) from 22nd to 26th
of November 2010.
Planning & Scheduling with Primavera Project Management (P6) training presented by
ExecuTrain from 6/4/2011 to 27/4/2011.
Computer Skills
CMMS program "SAP/R3 & IMMPOWER ".
Primavera P6
MS Project
Microsoft office 2010 "Word, Excel, PowerPoint
MS Visio
[pic][pic][pic][pic][pic][pic][pic][pic][pic][pic][pic][pic][pic][pic][pic][pic]
[pic][pic][pic][pic][pic][pic][pic][pic]