C.V (CURRICULUM VITAE)
Personal data
Name: Ali Hussein Mohamed Hussein Taha
Date & Place of Birth: 5/15/1979 in Kuwait
Nationality: Egyptian-Canadian Immigrant
Gender & Social: Male Married
Permanent Address: Kuwait –Medan Hawaly
16 Gaber Ben Haian Street
Telephone: +965********/+965********
Mobile : +965********/+965********
Another Address: Egypt –Alexandria
7 St. Awad Hegazy Sidi Bashr
Telephone: +203*******
Mobile : +201*********
Email:
**************@*****.***/**************@*****.***/**********@********.***
Educational data
Educational Degree: Bachelor in Construction & Building (Civil Engineering department)
University: Arab Academy for Science and Technology - Alexandria
Year of Degree: February 2005
Rating: Very Good
GPA: 2.87
Graduation Project: Construction Engineering and Management
Graduation Project Rating: (A) Excellent
Experience data
1- Have 1 Year Experience as a Site Engineer from July 2005 to July 2006 in Egyptian
army.
Responsibility:
Check Drawing Before Execution
Quantity Surveying.
Construction Wood Formwork for Column, Slab & Wall.
Fixing Steel Reinforcement for Column, Slab & Wall As Per Drawings.
Supervision during Execution Each Phase.
Repairing Old Building.
Coordination between Subcontractors.
Site Surveying.
Supervision During Construction.
Page 1 of 5
2- Have 6 Months Experience as Site Engineer from July.2006 to Nov.2006 Kuwait
Brokner Company KBC in Kuwait for Foundations, Piles & Shoring.
Responsibility:
Supervision during Execution.
Executing, Checking & Test Piles.
Executing Shoring System for Site.
Fixing Steel Reinforcement & Pouring concrete For Piles.
3- Have 6 Years as a Planning & Scheduling Engineer (Planner) From
November.2006 until November.2012 with Biggest Contractor in Kuwait Ahmadiah
Contract ring & Trading Company For the Project AL-Hamra Used Mix Complex
(Tower, Mall & Car park) Tallest Tower in Kuwait +417 Meter .Budget Cost for this
Project 200 Million Dinar.
Responsibility:
Made Target & Master Program by Primavera P3.
Updated Program Bi-Weekly & Monthly.
Resource Loading (Material & Manpower).
Made Claims & Extension Of Time.
Management of Resources & Material.
Procurement Schedule for All Packages & Audit Trail.
Made Key Performance Indicators KPI For All Activities in Project
Made Schedule Performance Indicator SPI For All Activities
Made Update For 2 Weeks Look Ahead & 1 Month Look Ahead..
Daily Construction Report.
Make Monthly Report For The Owner & Consultants.
Coordination Between Subcontractors
Made E1&E2 Logs For Material & Shop Drawings
Made Progress Meeting With Subcontractors.
Made Schedule For Concrete Order (Monthly, Weekly & Daily) to Batching Planet
& Calculating Waste Concrete.
Use Claim Digger Program.
Calculating Waste of Material & Concrete.
Made Updated Progress Drawings Using Auto Cad.
Made Site Layout & Organization Chart.
Updated Schedule For Electromechanical Works (Plumping. Electrical & HVAC)
Made Monthly, Weekly & Daily Report For Manpower & Equipment.
Made Monthly Payment.
Monitoring Site Progress.
Made Flow Chart.
Made S-Curves by P3.
Made Delay Events.
4- Have 8 month working With Ahmadiah Contracting & Trading as a Planning &
Scheduling Engineer (Planner) For National Guard Project from March.2011 until
October.2011. Budget Cost for this Project 34 Million Dinar.
Responsibility:
Page 2 of 5
Make Master Program.
Make Detail Schedule
Make E1 & E2 Log.
Method Statement Project.
Monthly Report.
Update Bi-Weekly.
Make Cash Flow & Cost Loading.
5- Have 9 month until today working With Ahmadiah Contracting & Trading as a Sr.
Planning & Scheduling Engineer (Sr.Planner) For NBK Tower from October.2012
until today Budget Cost for this Project 114 Million Dinar.
Responsibility:
Made Master Schedule Using Primavera P6.
Made Preliminary Network Diagram Schedule.
Made Detailed Schedule Using Primavera P6.
Made E1 & E2 Logs.
Made Method Statement for the Project.
Made Cost Loading & Cash Flow Using Primavera P6.
Made Resource Loading Using Primavera P6.
Using Project Contract Management Software (PCM) Oracle Certificate .
Made Audit Trail for Procurement.
Made 60 Days Look Ahead as per Contract Requirement.
Using Navis 2013 Software.
Using Revi t2013 Software.
Skills
Excellent user of Computer Especially for the Next Software’s:
Primavera (pillared with certificate)
Auto cad (2D)R14-2005 (subject in transcript)
Word
Excel (specially to ease construction data)
Power point
Sap 2000 ver. 8.0 nonlinear (pillared with certificate).
Access.
Claim Digger.
Microsoft Project.
Operating System Windows & Dos.
Have knowledge for other important software feedback construction
Photoshop.
Flash Macromedia.
Experience in Execution Works:
Pouring Concrete Works.
Shuttering Formwork for Concrete
Steel Reinforcement for Concrete.
Page 3 of 5
Internal & External Sanitary Installation
Waterproofing.
Installation Steel Reinforcement Bars for Concrete.
Floating Slab Works.
Brick works
Installation Ceramic & Stone For Wall & Flooring
Surveying for construction with almost surveying devices
Electro Mechanical Works.
Shoring, Piles & Raft Works.
Erection & Welding Steel Frames, Columns, Sections & Elements.
Check List for Work Finish.
Casting Note for Concrete.
Experience in Office works:
Make Master & Detailed Schedule.
Site Works.
Hand Drawing & Computerize Drawing.
Preparation & follow-up project schedule
Procurement Work
Management of Resources.
Cost Control.
Architecture Design.
Cost Loading.
Coordination between Subcontractors.
Language
Arabic tongue
English (read, write and speak ) very good
Training
The Arab Contractors Osman Ahmad Osman due to construction of Teacher's club
in Alexandria (pillared with certificate)
Alex steel in workshop due to manufacturing of metallic sections and in free zone in
Alexandria due to construction of metallic frames
San Stefano complex in residential & cinema complex.
Primavera P3&P6 Training Arab Academy for Science & Technology University in
Egypt.
Access coarse training in Al-Ahly Institute in Kuwait.
Activity & hobbies
Assembly and repair computers
Repair electricity machines
Self learning of computer software
Page 4 of 5
Walking and shopping
Playing billiard and being bong
Hand engineering drawing
References
• Project Profile Al-Hamra Used Mix Complex (Tower, Mall & Car park)
• Project Profile Head Quarter for National Guard Project.
• Project Profile National Bank of Kuwait.
Attachment
Graduation certificate
Transcript report 2 pages
The Arab Contractors Osman Ahmed Osman certificate (2)
SAP 2000 course certificate
Primavera certificate (Primavera P3)
Primavera certificate (Primavera P6)
PCM Certificate (Project Contract Management)
Membership in Egypt, engineering syndicate
Planning Engineer Card from Ahmadiah
Project Profile Alhamra
Project Profile NBK
Page 5 of 5