Post Job Free
Sign in

Power Plant Electrical

Location:
United States
Posted:
April 29, 2013

Contact this candidate

Resume:

Delly Olalekan Michael

NTC (Technical)

Profile

. Willingness to work in a challenging environment that has a very

strong base for managerial

Work with ability to work independently and as a part of team

tightening deadline.

Key Skills

Fast learner, Ability to work under pressure, Good numerical skills, Good

working experience, Strong Troubleshooting and problem solving skills,

highly experience in maintaining Equipment/ Electrical Installation and

Preference for teamwork.

Personal Data

Sex: Male

Marital Status: Married State of

origin: Ondo

Local Govt. Area: Akure

Nationality: Nigerian

E-Mail: *************@*****.***

Tel: +234 803-***-****

Postal Address: 200 Market Road Igwuruta, Port-Harcourt.

+234 805-***-****

Academic Qualifications

Government Technical College, Owo

1997

1. National Technical Certificate (NTC)

2. Trade Test Grade II &III

3. Fedral Craft Training Certificate.

Franc Bayo Commercial Ent. (Film Division)

1992

Diploma

Premier College Of Technology, Akure

1989 West

Africa Examination Council

Local Authority School III Akure

1983

Testimonial

WORKING EXPERIENCE

COMPANY POSITION

DATE

1. Genesis Nig Ltd Maintenance Supervisor

2010-TO-DATE

2. Negris Limited Electrical Technician

2002-2010

Port-Harcourt.

3. Wale Dema Field Installation

2001-2002

Port-Harcourt Technician

4. Adeyeye Electrical Works Electrician

2000-2001

Port-Harcourt

5. IPCO Nigeria Limited Crane mate

1998-1999

Okirika.R/State.

6. Video Practioner Self-Employed

1993

Achievement

1. INSTALLATION AND COMMISSIONING OF 33MW GAS TURBINE TRANS AMADI

POWER STATION RIVERS STATE

2. INSTALLATION AND COMMISSIONING OF SOLAR MARS 100 GAS TURBINE FOR SHELL

CENTRAL POWER PLANT (INDUSTRIAL AREA) IA PORT HARCOURT.

3. INSTALLATION OF SOLAR MARS 100GAS TURBINE (INDEPENDENT POWER PLANT)

IPP ODOGUNYAN, IKORODU. LAGOS STATE.

4. DISMANTLING / INSTALLATION OF SOLAR CENTAUR 40 TURBO PUMP (NAOC OIL

CENTRE) EBOCHA. RIVERS STATE

5. INSTALLATION OF ELECTRICAL/MECHANICAL FINIMA INJECTION SUB-STATION

[NLNG BONNY] RIVERS STATE.

6. INSTALLATION AND COMMISSIONING OF 3 X 5.5MW TAURUS-60 DUAL FUEL

TURBINE POWER PLANT FOR TOTALFINAELF PORT HARCOURT. NIGERIA.

7. EQUIPMENT MAINTENANCE

Responsibilities

DOMESTICS,/INDUSTRIAL INSTALLATION: INSTALLATION OF VFD (VARIABLE

FREQUENCY DRIVE), LINE REACTOR, LOAD REACTOR, MOTOR CONTROL CENTRE (MCC)

ELECTRICAL MONITORING CONTROL SYSTEM (EMCS), SWITCHGEAR (IIKV & 33KV) AND

CONTROL CONSOLE,TRANSIT BLOCK STSYEM, LAYING OF CABLES, GLANDING CAD

WELDING, SYNCRONIZATION,TROUBLESHOOTHING, EQUIPMENT MAINTENANCE, OPERATION

AND MAINTENANCE: CHILLER,DOUGH DIVIDER, BURNER, TERMINATION, MEGGERING OF

CABLES, INSTRUMENTATION AND CONTINUITY / INSULATION RESISTANCE TEST OF

CABLES.

OBJECTIVE:

STRIVING TO INCREASE THE COMPETENCE AND PRESTIGE OF THE ENGINEERING

PROFESSION BY PROVIDING QUALITY SERVICES IN HONESTY AND DIGNITY.

Hobbies

Traveling, Football, Tennis, Reading, Music.

References

Engr. Wale Abdul Engr. Gbenga Adegbite

Engr. Tuoyo Stanley

Rockson Engineering Rockson Engineering

36, Trans Amadi Ind/Layout

Port Harcourt Port Harcourt

Port Harcourt.

Rivers State. Rivers State

Rivers State.



Contact this candidate