Post Job Free
Sign in

Electrical Engineer Project

Location:
United States
Posted:
April 19, 2013

Contact this candidate

Resume:

ROBINSON ATENCIO

ELECTRICAL ENGINEER

Mobile +584*********

RESUME

Name: ROBINSON ANTONIO.

Surname: ATENCIO ARRIAS

Position: ELECTRICAL ENGINEER

Birth date: MARCH 02, 1965

Nationality: VENEZUELAN

Status: Single

E-mail: Home: *************@*******.***

***************@*****.***

EDUCATION:

- Electrical Engineer: ZULIA UNIVERSITY, Maracaibo, Venezuela, 1990.

- Computer Add Design (CAD): AUTOPLOT, Maracaibo, Venezuela 1991

- Battery bank - Installation & Maintenance: VENERGIA, Maracaibo, Venezuela, 1990

- Training course on calibration of levels Switches, Houston, Texas.

- English - Advance- INCE, Maracaibo, Venezuela. 1985 - 1986.

- French: - level 8, La Alliance Francaise, Maracaibo, Venezuela, 1993 - 1995.

- Training course on EIM Actuators, Missouri City, Texas, 10 August 1993.

- Training course on Brant transducers, Houston, Texas, 12 August 1993.

- Microsoft project V.4, Maracaibo - Venezuela, 28 - 29 October 1995.

LANGUAGES: Fluent in Spanish, English .

PROFESSIONAL EXPERIENCE:

Company: COSTA NORTE COMPANY

Urea Plant-PEQUIVEN

PMF Project-Toyo Engineering Corporation

Carabobo, Venezuela

Date: April 2012 to December 2012

Position: Electrical engineer, Field Construction Supervisor

Company: PDVSA

Maracaibo, Venezuela

Date: May 2011 to February 2012

Position: Electrical engineer

Project: Cogeneration Plant and Osmosis Treatment Plant

Responsibilities: Detail engineering for the electrical system of the Plant

Company: BERTH 6 QG 3&4

( Qatar Gas)

Raslafan City

Qatar, Doha

Date: March 2009 to March 2011

Position: Electrical, Instrument and Telecomm Field engineer Supervisor Leader

Project: Common Lean LNG Loading Facilities (Berth 6)

Responsibilities: Supervise the E,I &Tconstruction, QAQC and pre commissioning

activities.

Company: BOHAI Phase II Development

( ConocoPhillips)

Flour Daniels (Sugar Land, TX)

Sembawang Shipyard, Singapore

Date: July 2005 to July 2008

Position: Electrical Supervisor

Project: Bohai Phase II Development (FPSO, Top Side)

Responsibilities: Supervise the Electrical construction activities and control the

cable tray installation and cable pulling for the different systems (medium and low

voltage, control, communication and telecomm), final HUC and turnover to the

commissioning group. Material controller.

Company: Alliance-Engineering/NM WoodGroup.

Date: November 2004 to April 2005

Position: Electrical Engineer

Project: Oil Bird Field Development, EOG Resources Ltd.

Responsibilities: Electrical Design of lighting system for process areas, Electrical

Load study, cable routing and cable tray for low Voltage, control circuit design for

AC motor, Electrical hook - up, Job metric calculation, Equipment specs.

Company: CLJOC (Cuulong Joint Operating Company)

( ConocoPhillips)

c/o Samsung Heavy Industries

Gyeongnam, Korea

Ho Chi Minh City, Vietnam

Date: September 2002 to present December 2003

Position: Electrical Supervisor

Project: Su Tu Den Project (FPSO)

Responsibilities: Supervise the Electrical construction activities and acted as the

QA/QC supervisor on the installation of facilities, final HUC and turnover to the

Operations group. Facilities included 4160 Vac Power Generation and Distribution

System, 450 Vac Power and control installation for Top Side and Marine System,

Lighting System, LP flare system, Gas compression units, produced water facilities and

electrostatic treater.

Company: PETROZUATA. (Conoco/PDVSA)

Puerto La Cruz - Edo. Anzoategui-Venezuela

Date: January 00 to August 02

Position: Instrument/Electrical Superintendent

Project: Phase 3 PETROZUATA

Responsibilities: Supervise the I/E construction activities and acted as the QA/QC

supervisor on the installation of the secondary oil production facilities from the design

to the final HUC and turnover to the Operations group. Facilities included a LP flare

system, vapor recovery unit, gas compression modules, heavy oil separation

equipment, produced water facilities and electrostatic treaters.

Company: THRONSON INTERNACIONAL DE ENEZUELA.

Maracaibo - Edo. Zulia

Date: December 97- January 00

Position: Instrument/Electrical Supervisor

Project: Venezuela Extra Heavy Oil. CONOCO-MARAVEN (PETROZUATA)

Responsibilities: Supervised construction crews and acted as the company QA/QC

supervisor on the electrical system installation of a 54MW gas turbine facility, 34.5kv

distribution system and all electrical systems in the medium and low voltage classes

for the well pad and primary production facilities. Primary role was to handle the

Interface between the field construction crews, Field Superintendent and the

Engineering contractor.

Company: THRONSON INTERNACIONAL DE ENEZUELA.

Maracaibo - Edo. Zulia

Date: August 96 – December 97

Position: Electrical Engineer

Project: Venezuela Extra Heavy Oil. CONOCO-MARAVEN (PETROZUATA)

Responsibilities: Electrical system design for the 120,000 bbl Main Station facilities

lighting systems, grounding net calculation, cable tray design/routing for the facility

power/control/instrument systems. Engineering activities also included the control

circuit design for AC motor circuits, Electrical Classification of Hazardous Locations,

instrument location & electrical hook - up, job metric calculations, and construction

installation specs.

Company: TECSER INGENIERIA, C.A.

Maracaibo - Edo. Zulia, Venezuela

Date: June 95 - July 96

Position: Electrical Engineer

Project: Cold Water System. PEQUIVEN. El Tablazo. Venezuela.

Project: Gas Compressor Installation. FIOR DE VENEZUELA. Pto. Ordaz

Project: Planta de Deshidratación de Crudo y tratamiento de Aguas de Afluentes.

“La Colina”. Tecpetrol de Venezuela,S.A.

Project: Off Shore Pump Station PB-12.5, Tecpetrol de Venezuela, S.A.

Project: Oil Pumping System. La Colina. El Calvario y El Capitan, Tecpetrol de

Venezuela, S.A.

Responsibilities: Electrical Design of lighting system for process areas, grounding net

calculation, cable routing for low Voltage, control circuit design for AC motor,

Electrical hook - up, Job metric calculation, construction specs.

Company: MATEL (Electrical Materials)

Maracaibo – Venezuela,Venezuela

Date: January 94 -May 95

Position: Salesman and support technical on Electrical

Equipment.

Company: INSTRUVAL

Valencia - Venezuela

Date: July 93 - January 94

Position: Salesman and support technical on actuators, levels

switch and transducers.

Company: COSA - INGENIEROS CONSULTORES

Maracaibo - Venezuela

Date: November 90 - June 93

Position: Electrical Engineer

1. Project: GLP Fractionating Plant Retrofit: Bajo Grande, MARAVEN, S.A. Venezuela.

Responsibilities: Electrical Design for Lighting System in Control Room, 24 kV Ducts,

Cable Routing for Low voltage, UPS Specs. Feeder Panel Boards Specs.

2. Project: Vapor Recovery System for Crude Flow Station Cl - 1, LAGOVEN, S.A.,

Maracaibo, Lake, Venezuela.

Responsibilities: Electrical Classification of Hazardous Locations, Lighting System

for Process Areas, Grounding Net Calculation, Cable Routing for L.V. & M.V., Control

Circuit Design for AC Motors, Electrical Hook -up, Job Metric Calculations,

Construction Specs

3. Project: Pilot Plant for Orimulsion Process, Zuata - MARAVEN, S.A. Venezuela.

Responsibilities: Cable Routes, Grounding Nets, Electrical Hook - up, Equipment

specs.

4. Project: Zuata Development, Orimulsion Process, MARAVEN, S.A. Venezuela.

Responsibilities: Electrical Classification of Hazardous Locations, Grounding Nets,

Electrical Hook - up, Lightning System, Material Take - off & Equipment Specs.