ROBINSON ATENCIO
ELECTRICAL ENGINEER
Mobile +584*********
RESUME
Name: ROBINSON ANTONIO.
Surname: ATENCIO ARRIAS
Position: ELECTRICAL ENGINEER
Birth date: MARCH 02, 1965
Nationality: VENEZUELAN
Status: Single
E-mail: Home: *************@*******.***
***************@*****.***
EDUCATION:
- Electrical Engineer: ZULIA UNIVERSITY, Maracaibo, Venezuela, 1990.
- Computer Add Design (CAD): AUTOPLOT, Maracaibo, Venezuela 1991
- Battery bank - Installation & Maintenance: VENERGIA, Maracaibo, Venezuela, 1990
- Training course on calibration of levels Switches, Houston, Texas.
- English - Advance- INCE, Maracaibo, Venezuela. 1985 - 1986.
- French: - level 8, La Alliance Francaise, Maracaibo, Venezuela, 1993 - 1995.
- Training course on EIM Actuators, Missouri City, Texas, 10 August 1993.
- Training course on Brant transducers, Houston, Texas, 12 August 1993.
- Microsoft project V.4, Maracaibo - Venezuela, 28 - 29 October 1995.
LANGUAGES: Fluent in Spanish, English .
PROFESSIONAL EXPERIENCE:
Company: COSTA NORTE COMPANY
Urea Plant-PEQUIVEN
PMF Project-Toyo Engineering Corporation
Carabobo, Venezuela
Date: April 2012 to December 2012
Position: Electrical engineer, Field Construction Supervisor
Company: PDVSA
Maracaibo, Venezuela
Date: May 2011 to February 2012
Position: Electrical engineer
Project: Cogeneration Plant and Osmosis Treatment Plant
Responsibilities: Detail engineering for the electrical system of the Plant
Company: BERTH 6 QG 3&4
( Qatar Gas)
Raslafan City
Qatar, Doha
Date: March 2009 to March 2011
Position: Electrical, Instrument and Telecomm Field engineer Supervisor Leader
Project: Common Lean LNG Loading Facilities (Berth 6)
Responsibilities: Supervise the E,I &Tconstruction, QAQC and pre commissioning
activities.
Company: BOHAI Phase II Development
( ConocoPhillips)
Flour Daniels (Sugar Land, TX)
Sembawang Shipyard, Singapore
Date: July 2005 to July 2008
Position: Electrical Supervisor
Project: Bohai Phase II Development (FPSO, Top Side)
Responsibilities: Supervise the Electrical construction activities and control the
cable tray installation and cable pulling for the different systems (medium and low
voltage, control, communication and telecomm), final HUC and turnover to the
commissioning group. Material controller.
Company: Alliance-Engineering/NM WoodGroup.
Date: November 2004 to April 2005
Position: Electrical Engineer
Project: Oil Bird Field Development, EOG Resources Ltd.
Responsibilities: Electrical Design of lighting system for process areas, Electrical
Load study, cable routing and cable tray for low Voltage, control circuit design for
AC motor, Electrical hook - up, Job metric calculation, Equipment specs.
Company: CLJOC (Cuulong Joint Operating Company)
( ConocoPhillips)
c/o Samsung Heavy Industries
Gyeongnam, Korea
Ho Chi Minh City, Vietnam
Date: September 2002 to present December 2003
Position: Electrical Supervisor
Project: Su Tu Den Project (FPSO)
Responsibilities: Supervise the Electrical construction activities and acted as the
QA/QC supervisor on the installation of facilities, final HUC and turnover to the
Operations group. Facilities included 4160 Vac Power Generation and Distribution
System, 450 Vac Power and control installation for Top Side and Marine System,
Lighting System, LP flare system, Gas compression units, produced water facilities and
electrostatic treater.
Company: PETROZUATA. (Conoco/PDVSA)
Puerto La Cruz - Edo. Anzoategui-Venezuela
Date: January 00 to August 02
Position: Instrument/Electrical Superintendent
Project: Phase 3 PETROZUATA
Responsibilities: Supervise the I/E construction activities and acted as the QA/QC
supervisor on the installation of the secondary oil production facilities from the design
to the final HUC and turnover to the Operations group. Facilities included a LP flare
system, vapor recovery unit, gas compression modules, heavy oil separation
equipment, produced water facilities and electrostatic treaters.
Company: THRONSON INTERNACIONAL DE ENEZUELA.
Maracaibo - Edo. Zulia
Date: December 97- January 00
Position: Instrument/Electrical Supervisor
Project: Venezuela Extra Heavy Oil. CONOCO-MARAVEN (PETROZUATA)
Responsibilities: Supervised construction crews and acted as the company QA/QC
supervisor on the electrical system installation of a 54MW gas turbine facility, 34.5kv
distribution system and all electrical systems in the medium and low voltage classes
for the well pad and primary production facilities. Primary role was to handle the
Interface between the field construction crews, Field Superintendent and the
Engineering contractor.
Company: THRONSON INTERNACIONAL DE ENEZUELA.
Maracaibo - Edo. Zulia
Date: August 96 – December 97
Position: Electrical Engineer
Project: Venezuela Extra Heavy Oil. CONOCO-MARAVEN (PETROZUATA)
Responsibilities: Electrical system design for the 120,000 bbl Main Station facilities
lighting systems, grounding net calculation, cable tray design/routing for the facility
power/control/instrument systems. Engineering activities also included the control
circuit design for AC motor circuits, Electrical Classification of Hazardous Locations,
instrument location & electrical hook - up, job metric calculations, and construction
installation specs.
Company: TECSER INGENIERIA, C.A.
Maracaibo - Edo. Zulia, Venezuela
Date: June 95 - July 96
Position: Electrical Engineer
Project: Cold Water System. PEQUIVEN. El Tablazo. Venezuela.
Project: Gas Compressor Installation. FIOR DE VENEZUELA. Pto. Ordaz
Project: Planta de Deshidratación de Crudo y tratamiento de Aguas de Afluentes.
“La Colina”. Tecpetrol de Venezuela,S.A.
Project: Off Shore Pump Station PB-12.5, Tecpetrol de Venezuela, S.A.
Project: Oil Pumping System. La Colina. El Calvario y El Capitan, Tecpetrol de
Venezuela, S.A.
Responsibilities: Electrical Design of lighting system for process areas, grounding net
calculation, cable routing for low Voltage, control circuit design for AC motor,
Electrical hook - up, Job metric calculation, construction specs.
Company: MATEL (Electrical Materials)
Maracaibo – Venezuela,Venezuela
Date: January 94 -May 95
Position: Salesman and support technical on Electrical
Equipment.
Company: INSTRUVAL
Valencia - Venezuela
Date: July 93 - January 94
Position: Salesman and support technical on actuators, levels
switch and transducers.
Company: COSA - INGENIEROS CONSULTORES
Maracaibo - Venezuela
Date: November 90 - June 93
Position: Electrical Engineer
1. Project: GLP Fractionating Plant Retrofit: Bajo Grande, MARAVEN, S.A. Venezuela.
Responsibilities: Electrical Design for Lighting System in Control Room, 24 kV Ducts,
Cable Routing for Low voltage, UPS Specs. Feeder Panel Boards Specs.
2. Project: Vapor Recovery System for Crude Flow Station Cl - 1, LAGOVEN, S.A.,
Maracaibo, Lake, Venezuela.
Responsibilities: Electrical Classification of Hazardous Locations, Lighting System
for Process Areas, Grounding Net Calculation, Cable Routing for L.V. & M.V., Control
Circuit Design for AC Motors, Electrical Hook -up, Job Metric Calculations,
Construction Specs
3. Project: Pilot Plant for Orimulsion Process, Zuata - MARAVEN, S.A. Venezuela.
Responsibilities: Cable Routes, Grounding Nets, Electrical Hook - up, Equipment
specs.
4. Project: Zuata Development, Orimulsion Process, MARAVEN, S.A. Venezuela.
Responsibilities: Electrical Classification of Hazardous Locations, Grounding Nets,
Electrical Hook - up, Lightning System, Material Take - off & Equipment Specs.