• Experience of working as a graduate research assistant in the field of Transportation engineering at University of Texas at El Paso.

• Strong Technical writing and Presentation skills.

• Working experience in Project management software Primavera P3 & P6, MS Project Planner, Waste water system engineering,

structural designing, planning and scheduling of project, cost control, budget preparation, field execution work, cost estimation,

material estimation, onscreen quantity take-offs, project cost forecasting, project monitoring and quantity surveying ( estimation

works).

• Experience of working in pipeline project, heavy civil structures (ground water reservoirs, elevated water tanks, pumping stations,

workshop building, mechanical structural steel works), industrial structures, design and building of storm & underground sewer,

water drainage system, pavement design, bridge constructions, highway, earthen dams, retaining walls, culverts, skew bridges,

hydroelectric power plant projects (construction of cooling towers, wagon tippler maintenance work, store rooms, etc.) & commercial

building structures (sports complex).

• Working experience in Autocad, MS project planner, Primavera, MS office. Well acknowledge with advanced software like ARCGIS

10, MATLAB, MathCAD, Microstation, GeoPak, Civil 3D, modeling in GAMS and LIMDEP, VISSIM, Synchro Studio.

EDUCATION

The University Of Texas at El Paso (UTEP) May 2012

Masters in Civil Engineering – (Transportation Engineering) Overall GPA: 3.71/4.0

Y. C. College of Engineering (Nagpur University, India) May

2007

Bachelor in Civil Engineering Overall GPA: 3.33/4.0

Academic Projects and Thesis related to Civil Engineering:

Master’s Thesis: “Carrier Collaborative Network: Hybrid Hub-Location and Algorithm”.

With the assistance of my advisor Dr. Salvador Hernandez, we successfully developed a mathematical model to optimize the network route and

provide the appropriate location of a Hub selected in a set of nodes (cities and/or facilities); by using Centralized Carrier Collaborative and

Multi-Hub Location Problem. I ran comprehensive analysis to the approved working model; by comparing my formulation with two different

methods of optimizing tools (Algorithms). I used GAMS and C++ to solve the model using Lagrangian Relaxation Method; then compared the

results to those obtained from solving the model using Genetic Algorithm; which was coded in MATLAB.

PROFESSIONAL EXPERIENCE

BENAKA Inc, New Jersey / New York

Project Engineer Jul’12 - Present

Projects:

• Energy Multiple Conservation Project – at Stewart Air National Guard Base, Newburgh NY .

Responsibilities:

• Prepared project Schedule, biweekly looks ahead of work activities, planning and coordinating of work activities.

• Pushed the job to complete major critical tasks within allowable time frame.

• Coordinated project from beginning within all the subcontractors of civil, mechanical, electrical, HVAC, Plumbing works.

• Maintained daily logs, quality control logs, material submittals, efficient documentation system, RFIs, Payroll reports.

• Reviewed and prepared Contracts, biweekly payment applications and reviewed the payment applications from subs in accordance with the

work completed.

• Negotiated while buying outs of material, subcontractors, change orders and variation claims.

• Served as vital point of contact between Owner, Engineer & Architects and subcontractors.

• Monitored project progress, work quality as per codes, specification and drawings, budgeting and cash flow in the project.

• Resolved technical issues on the field and on paper and maintained the pace of the project progress without any hindrance and completed

major milestone of the project within the anticipated time frame.

• Successfully completed submitting and getting approval of all the submittals as required for the entire project before deadline.

Nagarjuna Contracting Company L.L.C., Dubai, U.A.E/ Oman

Quantity Surveyor (Estimator) and Planning Engineer Apr’09 - Jul’10

1 Page

Projects:

• Cross Country Pipeline (Fiber Glass, A.C & G.I. Water Transmission Pipeline), Dubai, UAE.

• Al Batinah Coastal Highway Project, Al Batinah, Oman.

Responsibilities:

• Produced and maintained daily progress report, weekly budget, weekly and monthly progress reviews of project and provided up to date

status of project to project managers. .

• Served as the liaison between the Government (Client), Architect and the Sub Contractors.

• Estimated Materials, obtained approvals, maintained record, and prepared monthly material reconciliation statement.

• Prepared financial reports, forecasting project reports.

• Estimated all materials required for the project (Material Estimation work), material approvals and maintained its record, prepared monthly

material reconciliation statement.

• Prepared financial reports, forecasting project reports and updated status of project in Primavera for monitoring activities at site, made

contractual claims & variations, verified sub-contractors bill before time and maintained the good relation with sub-contractors.

• Successfully completed all the submittal requirements for the entire project before deadlines, maintained Request for Information (RFI)

records and laboratory test reports records.

DECON Pvt Ltd., Nagpur, India

Civil Engineer Dec’08 - Mar’09

Projects:

• Sports complex, Pune India.

• Hydroelectric Power plant project, Obra U.P. India.

Responsibilities:

• Prepared construction drawings in AutoCAD and submitted to Engineer of record for approval.

• Billed monthly progress payments and performed Rate Analysis.

• Materials approvals and maintained record of all engineering works and drawings, for whole Project.

• Estimated and procured materials for civil works required for the project, prepared bar bending schedules and material reconciliation.

• Maintained office filing system, correspondence, Request for Information (RFI), logs, including inspection/test reports, change status,

claims, submittals, receivables, meeting minutes, payments, changes submittals and all other contractual documents, reviewed all incoming

correspondence for required action and ensured timely action taken.

• Monitored project work status of various activities and took necessary action to solve the problem.

• Prepared contractual claims and variations and negotiated the contract changes and/or the resolution of construction related

claims with sub-contractors and clients.

Hasan Juma Contracting Company L.L.C., Muscat, Oman

Civil Engineer in Training Nov’07 - Oct’08

Project:

• Cross Country Pipeline Project. (M.S & G.I water transmission pipeline – 273 Kms of pipeline construction with pumping stations,

elevated Water tanks, ground service reservoirs, Surge tanks, Valve Chambers, Workshop buildings, tanker filling stations, etc.)

Responsibilities:

• Prepared drawings in AutoCAD.

• Made drawings approved by consultant resident engineer and provide it to site for execution.

• Prepared Shop drawings and As Built drawings.

• Maintained proper record of Civil as well as Mechanical Works.

• Estimated material required for the project.

• Prepared Bar Bending schedules.

• Field Execution work.

TECHNICAL SKILLS

[Skill level: beginner – intermediate – good – excellent]

• MATLAB (Intermediate) ; GAMS (Beginner); M.S Office (Excellent); AutoCAD (Excellent); C language (Intermediate) ; Staad pro

(beginner ); Primavera project planner (p3.0 / p6.0) (good); M. S. Project Planner (good), VISSIM (Beginner), MathCAD (Good), Microstation

(good), GeoPak (beginner), Civil 3D (Intermediate).

2 Page

CERTIFICATION, PUBLICATIONS, AWARDS & ACHIEVEMENTS

• CQM Certified for NAVFAC & US Army Corps of Engineers, OSHA 30 Hr safety and ESRI ARCGIS 10 –Certification.

• Less-Than-Truckload Centralized Carrier Collaboration Multi-hub Location Problem: Hybrid Hub-and-Spoke Network (12-4247),

Transportation Research Board, 2012.

Awale, Satyen S. - University of Texas, El Paso

Hernandez, Salvador - University of Texas, El Paso

• Unnikrishnan, Avinash - West Virginia University.

• Presented Poster at 91st TRB annual meet at Washington DC on “Centralized Carrier Collaborative and Multi-Hub Location Problem.”

• Stood First in Model Competition at Indian Institutes of Engineers Annual conference, as a team member I designed and build a Prototype

of a Helipad structure to be constructed over Skyscraper.

• Represented as a captain of High-school and Junior College Volleyball team.

• Active participation as a Volunteer in technical Workshop about “Construction Machinery and Equipment”.

• Achieved 700 cu. m. of concrete casting work within 36 hrs of projected time.

• Completed the laying and jointing of 500 Nos. of 1200mm diameter of Fiber Glass Reinforced Concrete pipes in 20 hours of anticipated

time limits.

*References available on request.