Post Job Free
Sign in

Management Project

Location:
United States
Posted:
April 24, 2013

Contact this candidate

Resume:

HİDAYET ŞİRİN

Güvenevler Mh.**** sk Gündoğar Sitesi B Blok K4 /Mersin

e mail: *******@*******.*** Gsm: 0-533-***-**-**

PERSONAL INFORMATION

Place, Date of Birth : İskenderun, Hatay, 15.08.1975

Marital Status : Married

Driving License : B Class

EDUCATION

2004 2007 MSc ÇUKUROVA University, Industrial Eng.,

Engineering and Technology Management

1991 1995 Undergraduate ULUDAĞ University, Industrial Engineering

WORKING and ACADEMIC EXPERIENCE

TEMSA GLOBAL, Production Planning and Control Section Manager,2011 ..

Duties and Responsible Processes

o Management of Master Production Plan that supports sales budget

o Weekly, Monthly production capacity analysis

o Set up, monitor and maintain the order specification and approved delivery date

within SAP

o Management of detailed production plan

Work In Process(WIP) cost analysis and reporting

o

Prioritize deliveries according to customer requirements

o

Publication of daily actual production figures and deliveries

o

Management of weekly “Factory Operation Meeting”

o

Cost analysis for customer order modification

o

Determining the needs of overtime and shift in accordance with production labor

o

capacity

TEMSA GLOBAL, Stock Control Warehouse and Parts Distribution Section

Manager, 2002 2011

Duties and Responsible Processes

o Set up and maintain material inventory management parameters within SAP

(min max stock, safety stock and re order point stock)

o Analysis of inventories to in order to increase inventory turnover rate

o Monitoring material aging and reduce waste

o Barcode system application and monitoring all material location within SAP

o Optimization of parts placement to efficient use of warehouse

o Oversee of the inventory staff (warehouse management 178 employers and

10.000 m2 plant)

o Set up and maintain Kanban parts within SAP

o Application of Kanban method to suppliers

o Development and improvement of Part Packaging

o Daily parts distribution organization to assembly lines (daily 3.000 parts

distribution to 10 different assembly lines)

o Improvement material flow and reduce logistics cost studies

o Monthly analysis and monitoring of stock cycle time, average stock and stock

cost

o FIFO racks design and improvement

TEMSA GLOBAL, Industrial Engineer, 1998 2002

Duties and Responsible Processes

o Simulation of Paint shop and capacity analysis

Layout design for new Bus and midibus production

o

Simulation and optimization of material distribution to assembly lines

o

Kaizen applications on production lines

o

Lean system development for assembly lines

o

MARTUR SEAT COMPANY, Method Engineer, 1997 1998

Duties and Responsible Processes

o Plant lay out

Process flow standardization

o

Kaizen applications

o

Standart time of process

o

Lean Production

o

TRAINES and CERTIFICATIONS

2010 72 h Lean Six Sigma

2010 8 h Strategy and Leadership

2008 16 h Process Management

2008 16 h Supply Chain Management

2008 16 h Critical Success Factors at Management

2007 16 h EFQM

2007 24 h Lean Production

2007 40 h Project Management

2007 16 h Development of Coaching Skills

2006 16 h Strategic Management

2006 16 h Development of Presentation Skills

2005 24 h Time Management for Managers

2005 24 h Organization and Management

2002 24 h Reengineering

1997 40 h Kaizen Applications

PROJECTS

2012 Present ORDER COST MANAGEMENT

Aim to profitability analysis of new order

o

Decision making for Order acceptance or Rejection

o

Monitoring production labor cost for each order

o

Management of additional cost or modification cost for each order

o

2009 2010 SAP/ E KANBAN IMPLEMENTATION PROJECT (Project Leader)

o Aim to improve lead times, decreasing stock and stock out cost via

synchronization of material delivery by priority of production requirements

o The first SAP electronic kanban (e kanban) application project in Turkey

o A finalist in the category of Best Practice Award by the Turkish Operational

Research Society Congress held at Sabanci University in 2010

(www.yaem2010.org)

o By this project, 36% reduction in stock costs and 51% increase in stock cycle

time

BENCMARKING

I had opportunity to visit the world leading companies plant and benchmarking their

supply chain and production systems;

o Mitsubishi Bus Company Toyama / JAPAN

Toyota Turkey Company Adapazari / TURKEY

o

Peugeot Citroen Company Paris / FRANCE

o

Renault Truck Company Lyon / FRANCE

o

Linde Forklift Company Chatellerault / FRANCE

o

Mitsubishi Truck Company Tokyo / JAPAN

o

SAP IMPLEMENTATION PROJECTS

o PP and MM module implementation, full time project member during SAP

implementation to TEMSA Adana Plant (2002 2003)

o MM module implementation and key user, full time project member during SAP

implementation to TEMSA Egypt Company (2007)

2007 2009 WAREHOUSE MANAGEMENT (SAP WM Implementation Project

Leader)

o Monitoring all material warehouse status by mobile applications

o Monitoring of material placement in warehouse

o Mobile applications of material distribution and assembly to the vehicles in

assembly lines

2006 2008 TEMSA EGYPT COMPANY MATERIAL FLOW PROJECT (Project

Leader)

o Optimization of material placement

Decision of material handling equipments quantities and types

o

Warehouse layout studies

o

Material flow organizations

o

Parts distribution to assembly lines

o

2006 2008 TEMSA TALENT POOL PROGRAM

o Management of skill development and improvement program 12 units executive

trainees

SIX SIGMA GREEN BELT CANDIDATE

o Reduction of missing parts due to Hardware reasons in 3 different models

manufactured in TEMSA (SAFARI HD, SAFARI RD and TOURMALIN models),

6 Sigma Project, Team Leader, 2010

o Reduction of stock cost, 6 Sigma Project, Team Leader, 2010

o Configuration Management, 6 Sigma Project, Team Member, 2009

o Material placement optimization, 6 Sigma Project, Team Member, 2010

ACADEMIC THESIS

ULUDAG University Industrial Engineering Graduation Thesis: “Information

Management System”

CUKUROVA University Engineering and Technology Graduation Thesis:

“Synchronization of Pull and Push System at Supply Chain Management”

WORKING SKILLS

SAP R3

MM and PP KEY USER, E KANBAN ADMINISTRATOR, SAP WM

Software

MS WORD, MS EXCEL, MS ACCESS, MS POWERPOINT, MS PROJECT, MINITAB,

LINDO/LINGO, ARENA, VISIO

Language

English (Advanced)

REFERENCES

Prof. Dr. Rizvan EROL Çukurova University 0-530-***-**-**

Industrial Engineering Department Head

Zuhuri AKYOL KARSAN, Bus Industrial Director 0-530-***-**-**

İhsan TEMİZKAN SAP IT Consultant 0-533-***-**-**



Contact this candidate