Imad Uddin Siddiqui Khaja
Email: ****.***@*****.*** Mobile: 054******* (Jeddah) / +91-990******* / 040-******** (India)
SAP NETWEAVER CERTIFIED CONSULTANT
Executive Summary
A highly motivated peak performing SAP Netweaver Certified Consultant with 3+ Years of experience
keen to join a well managed professional team where my logical and technical expertise can be properly
utilized and will augment my skills and capabilities as a SAP Basis administrator.
Key SAP Skills / Certifications
• SAP NETWEAVER 7.0 Certified Associate
• Extensive experience in performing the various Version Upgrades like NW 7.31, NW 7.0 Ehp2 & Ehp6
upgrades for various NW components ECC, CRM, SRM, MDM, PI, SRM-SUS, C-folders, Enterprise
Portal, Supplier Portal, ADS, CUA, SLD & Web Dispatcher.
• Performed Java stack split from Dual-stack system using Split tool before upgrading to EHP6 for ECC system
& C-folders system.
• Performed JVM migration prior to Enterprise Portal & Supplier portal NW 7.31 upgrade.
• Experienced in implementation of SAP ECC 6.0 & SAP Enterprise Portal, SAP BW.
• Experienced in performing post installation steps & providing go live support.
• Experienced in performing Oracle version Upgrade from 10G to 11G.
• Experienced in performing Enhancement Package 5 upgrade.
• Experienced in performing Enhancement Package 4 upgrade.
• Experienced in installing dialog instances.
• Configuration of Adobe Document Service (ADS).
• Configured SSO for ABAP/JAVA system for NW 7.0 & NW 7.31.
• Configured SSL for ABAP/JAVA system.
• Experienced Connecting ABAP-Based Systems to SAP Solution Manager.
• Configuration of System Landscape Directory(SLD)
• Experienced in performing Homogenous System copy.
• Experienced in Java stack upgrade through JSPM.
• Experienced in Java Monitoring & Advance Performance Tuning
• Experienced in Background job administration, Client Administration and Change & Transport
system
• Performance monitoring at various levels like OS, DB & R/3 Application.
• Experienced in Oracle Database Tuning & Administration
• Experienced in online & offline Backup through BR*Tools & RMAN.
• Configured Data for oracle database.
• Familiar with Win NT, Win 2000, 2003, Solaris, HP-UX Server Operating Systems.
Other Skills / Non-SAP Certifications/Membership of Professional Institutes
• Cognizant Certified Professional in NW 7.0 (Internal certification)
• Oracle 10g SQL Certified Associate.
• Creation of ZFS files systems on SOLARIS 5.10 operating system.
Trainings Attended
• In-house training for configuring Oracle Data guard in Cognizant Technology Solutions
• In-house training for SAP Enterprise Portal 7.0 administration at Reliance Tech Services.
• In-house training for SAP Netweaver 7.0 Advanced Performance Tuning at Reliance Tech Services.
• In-house training for HP-UX 11i V3 administration at Reliance Tech Services by HP-UX vendor.
Education
• Bachelor of Technology in Electronics and Communication Engineering 2007 India (DISTINCTION)
• Master of Science in Micro Electronics & Computer System Designs --- 2009 UK (First Class)
Profesional Experience
Industry
Organization Project Duration Role
King Abdullah University of Education
Feb13 – Till Date Consultant
Science & Technology
Cognizant Technology IT
May 12 – Feb 13 Consultant
Solutions
Reliance Tech Services Nov 10 - May 12 Core team member
Telecommunications
IT
Globalerp Solutions May10 – Oct 10 Team member
SAP Project Experience:
Project Name: King Abdullah University of Science & Technology
Duration: Feb 13 – Till Date
Project Role: Consultant
Project Responsibilities:
• Performing PI 7.1 EHP1 Upgrade.
• Performed JVM manual upgrade from SAPJVM 4.0.24 to SAPJVM 6.1.47 prior to Wily 9
Installation on Solution Manager 7.1
• Installed Wily 9 on Solution Manager 7.1
• Monitoring the Primary & DR sites and re-enabling DR if required with 24 hrs delay.
• Working on daily Issues and tickets
• Performed CRM sandbox Installation / post Installation.
Environment: SAP ECC 6.0 EHP5, EP 7.31, Solution Manager 7.1,CRM 7.01, SRM 7.01, MDM 7.1,
PI 7.1, IDM, MI, BO, BW, Oracle 11 g, SUN SOLARIS 10, windows2K3.
Project Name: SCE Upgrade
Project Description: Client have engaged Cognizant to perform Version Upgrade from Net weaver 7.01 to
Net weaver 7.31 & EHP6 upgrade for ECC, CRM, SRM, MDM, PI, SRM-SUS, C-folders, Enterprise
Portal, Supplier Portal, ADS, CUA, SLD & Web Dispatcher.
Duration: May 12 – Feb -13
Project Role: Consultant
Project Responsibilities:
Version Upgrades
• Remove Java stack from Dual-stack system using Split tool before upgrading to EHP6 for ECC system & C-
folders system.
• Performed JVM migration prior to Enterprise Portal & Supplier portal NW 7.31 upgrade
• Complying with the Netweaver & EHP Upgrade preparatory steps like downloading the EHP Installation
guides.
• Prepared POA by referring to RFP & SOW documents, defining project deadlines, selecting the Technical
Usage relevant to the Landscape etc and project execution as planned.
• Performed Solution Manager cleanup before generating stack xml files, Created a solution & logical
component in SMSY
• SYNCED the data from Satellite system to SLD then to LMDB & then to SMSY.
• Generated Stack XML through Solution Manager 7.1 Maintenance Optimizer.
• Created test environment through System Refresh to perform mock cycles.
• Executed Upgrades in Sandbox, Development, Quality1, Quality2 environments’ as per the project plan.
• Checking all the prerequisites of Upgrade as per SAP Upgrade guide.
• Ensuring Tablespace requirements as per NW 7.31 & EHP6 Upgrade Guides.
• Successfully completed all the Prepare phases by resolving the issues encountered prior to starting the
Upgrade.
• Making preparatory steps for SUM tool.
• Completed the all Road map steps for the Upgrade & successfully completed all the phases for all NW
components mentioned
• Performed Post-Upgrade steps for all the NW components
• Evaluation of the Upgrade runtime using UPGANA.xml & Process_Overview.html, & prepared the cut over
documents.
• Monitored system behavior, dependencies etc and proactively took part in resolving errors faced during &
after upgrade.
SYSTEM COPY
• As a part of system build procedure performed the homogeneous system copy through database restore
method
• Performed all the Pre steps like User master Record export, RFC tables export, license export, SSL & SS0
certificate exports, etc and took the screenshots as per the checklist
• Uninstalled the existing SAP application and Installed Target system
• Performed all Post system refresh steps & worked extensively in reducing the BDLS runtime for 4.5 TB
database.
• Done all Configuration & performed the testing before releasing the system
Environment: SAP ECC 6.0 EHP4, EP 7.01,Supplier Portal7.01, Solution Manager 7.1,CRM 7.01,
SRM 7.01, MDM 7.1 SP06, PI 7.01, SRM-SUS 7.01, C-folders EHP4, DB2 9.7 FP4, AIX 6, SUN
SOLARIS 10.
Project Name: ORACLE Version Upgrade from 10G to 11G
Project Description: Client had engaged RTS to perform oracle version upgrade project.
Duration: Mar 12 – Apr 12
About Client: Reliance Communications is India’s largest information and communications service
provider with over 100 million subscribers. The company is the realization of our founder’s dream of
bringing about a digital revolution that will provide every Indian with affordable means of
communication and a ready access to information.
Project Role: Team member
Project Responsibilities:
• Involved in planning and preparation of the upgrade strategy for system landscape.
• Checking Software and Hardware requirements for Installation of Oracle 11G Software. Successfully
installed and patched the Oracle 11G Software.
• Installed SAP Bundle patch using OPatch and MOPatch Utilities along and check for patch conflict check.
• Performed the pre-upgrade check through pre-upgrade scripts like pre_upgrade_tasks.sql.
pre_upgrade_status.sql, pre_upgrade_checks.sql etc.
• Resolved the errors and warnings as per respective script logs.
• Performed database upgrade using dbua.sap.sh script and executed post upgrade scripts.
• Maintained post-upgrade setting to adapt SAP System for Oracle 11g like changing environment, sql*net
files, brtools upgrade, oracle client compliance etc.
• Monitored system for inconsistencies, dumps and errors.
Project Name: SAP Enhancement pack Upgrade Project (ECC 6.0 to EHP5)
Project Description: Client had engaged RTS to perform enhancement pack 5 upgrade.
Duration: Oct11 – Feb 12
About Client: Reliance Globalcom, a division of Reliance Communications, spearheads the Global
Telecom operations of India’s largest Integrated Telecom Service Provider. Reliance Globalcom brings
together the synergies of Reliance Communications Global Business encompassing Enterprise Services,
Capacity Sales, Managed Services and a highly successful bouquet of Retail products & services
comprising of Global Voice, Internet Solutions and Value Added Services. The company serves over 2100
enterprises, 200 carriers and 2.5 million retail customers in 163 countries across 6 continents
Project Role: Team member
Project Responsibilities:
• Complying with the EHP Upgrade preparatory steps like downloading the EHP Installation guides, Defining
project deadlines, selecting the Technical Usage relevant to the Landscape etc and project execution as
planned.
• Generated Stack XML through Solution Manager Maintenance Optimizer.
• Evaluation of the Upgrade runtime, system behavior, dependencies etc and fixing of errors faced during
upgrade.
• Project execution as per the project plan.
• Created test environment by installing two sandbox systems to perform mock cycles.
• Executed three POC cycles on test servers as per the project plan.
• Checking all the prerequisites of Upgrade as per SAP Upgrade guide.
• Ensuring Database compliance for EHP5 upgrade. Upgrading the Oracle Patch to 10.2.0.4 as per EHP5 pre-
requisite.
• Updating Optimizer statistics
• Ensuring Tablespace requirements as per EHP Installation Guide.
• Configuring the database parameters as per SAP Notes in server parameter file (SPFILE).
• Upgrading SPAM, SNOTE, R3TRANS, R3LOAD, SAPOSCOLL & TP to latest version.
• Enabling & disabling archiving during upgrade process.
• Extending the Oracle redo log Size
• Implementing SAP notes as recommended by SAP.
• Moving the Transport request through STMS.
• Setting OS kernel parameters & adding projects at the OS level.
• Successfully completed all the Prepare phases by resolving the issues encountered prior to starting the
Upgrade phase
• Making preparatory steps for EHPI tool. Taken database, Files System and Logs backups at different phases.
Performed Post-Upgrade steps as per Installation Guides and Recommended SAP Notes.
• Resolved warnings and errors faced during the different phases as per SAP recommendations by apply notes.
• Arranged the Post go live verification session for SAP and applied all the parameters recommended by SAP.
Project Name: SAP Implementation for Enterprise Portal 7.0
Project Description: Client had engaged RTS to perform implementation of Enterprise portal 7.0 .
Duration: Jan 11 – Jun 11
About Client: Reliance Big Entertainment has evolved out of the group's vision of meeting young India's
aspirations and assuming a leadership position in communications, media and entertainment.
Project Role: Team member
Project Responsibilities:
• Project execution as per the project plan.
• Created three system landscape installation of Enterprise Portal 7.0 with Oracle 10g database.
• Performing all the pre requisite steps of installations & then starting installation.
• Performing all the post installation steps.
• Integrated ABAP based system with the Enterprise Portal 7.0.
• Configured Single Sign On (SSO) from Enterprise Portal to ECC 6.0.
• Configured Adobe Document services (ADS)
• SSL implementation.
• Upgraded Oracle patch set from 10.2.0.2 to 10.2.0.4.0 on Oracle 10g Database.
• Oracle DB administration through BR*Tools
• Performed Client Administration and handled client copies/exports.
• Performed in Homogenous System copy for ABAP stack.
Project Name: Support project for SAP ECC6.0
Project Description: Support project for SAP ERP 6.0
Duration: May10 – Dec 10
About Client: Yipes is strongly positioned in Ethernet, by far the highest growth segment in the US
datacom market, with an annual growth rate of over 30%. Yipes has strategic network presence in the top
14 US metros, which account for 40% of the total US datacom market. Yipes has nearly 1,000 enterprise
customers and provides mission critical communications platforms for entire industry communities
Project Role: Team member
Project Responsibilities:
• Daily System health Check of Production Systems
• Moving Transport requests into the Quality & Production systems
• Performed Local Client copies & Client Transport
• Configuration of ADS-HTTPS for Form16 through SAP ECC
• Background Job Administration & monitoring.
• Oracle Database Monitoring using ADDM & STATS PACK Utility
• Oracle Database Administration through BR*Tools
• Analysis of Expensive SQL statements
• Providing End User support & resolving issues & Providing log on Pad & SOPs to end users