BONIFACIO R. RAYALA

e-mail address : abqwln@r.postjobfree.com

Address: *** ******** ******, ***. **, Vallejo, CA. 94590

Preferred Contact No. 707-***-**** Home Phone 707-***-****

Technical skills skype address: aleta.rayala

1. Expertise in design and installation of motor control center

2. Corrective and preventive maintenance in manufacturing plant

3. Testing and Commissioning of electrical switchgear and load centers

4. Programmable Logic Controllers ( PLC )

5. Sub-station battery replacement

6. Motor rewinding

7. Installation of soft starters and relays

8. Maintenance of synchronous motors

Professional Experience

OCAMPO-ESTA ENGINEERING

1419 Tennessee St. Vallejo, CA. 94590

Electrical Substation Design Engineer 2010-2012

SUBSTATION DESIGN ENGINEERING

1. Pacific Gas & Electric Outdoor Substation Design.

2. Travel to project sites for walk down meetings and gather information to develop the correct

requirements for the project to scope and develop substation projects.

3. Create project scope document to determine project cost

4. Up-date single line diagram and General arrangement drawings

5. Determine new drawings like: sectional views, grounding system, conduit lay-out, conduit

routing and equipment grounding.

6. Create new circuit schedule

7. Create new pull box schedule

8. Provide new conduit routing for SCADA

9. Determine new substation structures and required clearances

10. Prepare engineering materials memo

11. Design/review substation control room

12. Calculate substation sag and tension

13. Install temperature monitoring equipment

14. Design methodology rating for PG&E substation starting from 21KV to 230KV

15. Knowledge in AutoCAD

16. Review final design drawings as per PG&E standard

17. Coordinate with government officials with regards to working permit

CHINA CEMENT (HK) LIMITED, Hongkong

Electrical Engineer, Project Engineering 1991-2000

CHEMICAL INDUSTRIES OF THE PHILIPPINES

Electrical Engineer, Maintenance Department 1981-1991

CENTRAL CEMENT CORPORATION, Philippines

Electrical Engineer, Maintenance Department 1979-1981

CONTINENTAL CEMENT CORPORATION, Philippines

Electrical Engineer, Maintenance Department 1976-1979

1. Installation of electrical switchgear with extra high voltage rating of 34.5KV- ABB,

MITSUBISHI, GE, equipment.

2. Installation of Transformer Bank rating of 10 up to 25 MVA, 34.5KV, 3 phase,

3. Soft starters, motor controllers, instrumentation, relaying and programmable logic

controllers (PLC)

4. Preventive and Corrective maintenance of Cement equipment: electrostatic

precipitator, crushing plant, raw grinding mill, finish mill, kiln line.

5. Motor control center and electrical substation maintenance

6. Project engineering for cement industry

7. Review and participate in the schedule and development of plant shut down

8. Implementation of new methods and procedure for the design of electrical/mechanical

to improved operations and to minimize operating cost for greater utilization of labor

and materials.

9. Recommend measures to improve operations and conditions of machine and other

rotating equipment.

10. Oversee and inspect completion of projects to confirm with the design of equipment

and safety standards.

SAFCO CAPITAL CORPORATION

850 Sepulveda Boulevard, Los Angeles, CA. 90025

Title: Property Supervisor 2006-2010

1. Property Management for shopping Center

2. Responsible for Project renovation of commercial buildings

3. Supervise shopping center contractors

4. Corrective and Preventive Maintenance

5. Run energy savings program to cut-down utility bills

6. Coordinate with local government to renew and secure licenses

Name of Project Accomplish

1. Tassajarra Electrical Substation- replacement of 4-bay circuit breaker, bi-pass switches, bus

switch, re-conducturing, SCADA

2. Herdon Electrical Substation- transformer replacement 420MVA, 230KV

3. Moraga Substation-breaker replacement, switches, power transformer 420MVA, 230KV

4. Coleman Substation-breaker replacement, scada,

5. Grass Valley Electrical Substation- breaker replacement and switches

Educational Attainment

ADAMSON UNIVERSITY, MANILA, PHILIPPINES

Graduated: Bachelor of Science in Electrical Engineering 1971 - 1975

Master of Science in Business Administration

Manila, Philippines 2000 - 2003

Professional License

1. Registered Electrical Engineer(Philippines)

2. Associate Electrical Engineer (Philippines)

3. Professional Electrical Engineer(Philippines)

4. Registered Electrical Worker (Hongkong)

Certifications

1. Board of Electrical Engineering- Professional Regulation Commission, Philippines

2. Certificate of Graduation- Electrical Engineering

3. Certificate License for the Gospel Ministry

References

1. Wilfredo Nono- Ocampo Esta Engineering/ Project Engineer

Cell No. 818-***-**** / office: 707-***-****

2. Ramir Dimalanta- Ocampo Esta Engineering/ Supervisor

Office no. 707-***-****

3. Jun Esguera- Ocampo Esta Engineering / Design Engineer

Cell No. 707-***-****



Contact this candidate