Post Job Free
Sign in

RF planning & optimization

Location:
Indore, MP, India
Posted:
March 24, 2013

Contact this candidate

Resume:

RESUME

ANSHUL JAIN Tel

No: +91-808*******

+91-748*******

abqvoq@r.postjobfree.com

CARRER OBJECTIVE:

"To associate my self with a professional and growing organization, my long-

term objective is to enhance my core competency there by maturing along

with the organization."

EXPERIENCE:

Having 5+ Years (2 sep 2007 to Till Now) in GSM & WCDMA RF Field.

. Working as Optimization Engg in Alcatel lucent for Reliance project In

Madhya Pradesh

. Worked as Optimization Engg in Synergie for NSN-Uninor project in

Maharashtra

. Worked as Optimization Engg in ADA CELL WORKS WIRELES ENGG PVT LTD for

NSN-Airtel project in Madhya Pradesh

. Worked as Drive test Engineer (3G opti drive) in ADA CELL WORKS WIRELES

ENGG PVT LTD for NSN UAE Pvt. Ltd in Abu Dhabi (UAE) DU Project.

. Worked as RF Engineer in ADA CELL WORKS WIRELES ENGG PVT LTD. for NSN

India Pvt. Ltd in Indore (Madhya

. Pradesh,INDIA) AIRTEL Project .

. Worked as RF Engineer in Lepton software export & research pvt ltd. for

ITI India Pvt. Ltd in Pune (Maharashtra,India) BSNL project

JOB PROFILE:

From 25 Oct 2010 to till date : Alcatel lucent - Reliance MP 2G & 3G project

(ZTE & ALUms)

Responsible for all RF activity for Indore Clusters.

Analyzing BBH,NBH KPI's reports on daily basis & take actions accordingly.

Analyzing the Network Doctor Reports for Hardware, Interference, Path loss &

Database discrepancies.

Monitor Worst Performing KPi's of networks and resolve them.

Monitor & maintain all KPI indicators under thresholds.

Responsible for analysis and Parameter Optimization of Network.

Handling RF Networks in Special Occasions during Festivals, Events like New

Year, Diwali.

Handling Customer Complaints for Indore Cluster.

Responsible for Infill Sites/New site planning, Benchmarking & Optimization

Drive Test.

Performing 3G Drive & analysing drive logs, GPRS Drive,HSDPA Drive, Cluster

Drive,RAC Change, BSC

From 16 Oct 2009 to 8 Oct 2010 :Metrotel(Guj.) & Synergie(MH)- Unitech NSN

project & Tata Huawei project (Guj)

Provide solution of customer concerns

Maintaining the Network performance KPi's Optimization of the network using

KPi's, RF logs & daily report Fixed Frequency

& Frequency Hopping planning for new as well as existing sites

BSIC & Neighbors planning.

, Handover Reports. Checking of Call Drops due to Various Reasons, Blocking

rate, Traffic carried,

Maintaining HOSR, TCH and SDCCH, TCH ASSIGNMENT & Other parameters for meeting

KPi's.

Planning of a Physical parameter of New Coming sites like Antenna Height, Type,

Tilt, Azimuth, and location of an antenna

From 12th Aug 2009 to 16th Oct 2009: ADACELLWORKS (MadhyaPradesh )- Tata

Huawei project

Handling optimization of new sites and handles problems like Call drop,

interference, handover failure, handover reversion, antenna tilting, competitive

Drive Test.

Analyzing RF Drive Test on PROBE & ASSISTANT tool kits generated through log

files and verifying & testing of hardware upgrades and new elements added to the

network & keep track of all the up gradation activities.

From 5st May 2009 to 12th Aug 2009: ADACELLWORKS (MadhyaPradesh )- NSN-AirTel

project

Maintaining the Network performance KPi's Optimization of the network using

KPi's, RF logs & daily report Fixed Frequency

& Frequency Hopping planning for new as well as existing sites

BSIC & Neighbors planning.

, Handover Reports. Checking of Call Drops due to Various Reasons,

Blocking rate, Traffic carried,

Maintaining HOSR, TCH and SDCCH, TCH ASSIGNMENT & Other parameters for meeting

KPi's.

Planning of a Physical parameter of New Coming sites like Antenna Height, Type,

Tilt, Azimuth, and Location of an antenna.

From 11st July 2008 to 4TH May 2009 : ADAcellworks (AbuDhabi (UAE))- 3G NSN-DU

Project.

Monitor Statistics & Parameters, Locate the poor performing cells and provide

the solution to improve the network performance.

Analysis the TCH Assignment, Handover Failure, TCH Drop, SD Drop KPI's & find

out the poor performing Cells & improve the cells.

Analysis the TCH blocking & SD blocking KPI's & find out the high blocking Cells

& implement the Dual rate for TCH Blocking & increase the SD time slot according

to Trx configuration.

Given the cells for Trx addition to Project team which having high TCH Blocking

after implementation dual rate & field Optimization like change the Orientation

of neighbour Sites which carrying less traffic & Tilting.

To check the KPI's & meet accordingly by Optimization.

Performing 3G Drive & analysing drive logs, GPRS Drive,HSDPA Drive, Cluster

Drive,RAC Change, BSC Update, Software Updating, Analysis of 3G Drives Log

files,MOS test

Rectify the Customer Problems.

Conduct Drive test using NEMO Outdoor-8.0.2

From 17th November 2007 to 10th July 2007: ADACELLWORKS (MadhyaPradesh).

Frequency Planning & Handover Definition.

Co-channel (C/I) and Adjacent channel (C/A) Interference analysis

Drive Test to identify areas with Poor Coverage & Highest Call Drops.

Drive test of Site for Call Origination Test, Hand over test & Coverage test.

Data Collection Cluster drives to identify status of Site Coverage Area.

Find out Feeder swap and Internal Cable Swap.

Rectified the hardware alarm coordinate with BSS Engineer & OMCR Engineer.

Handover the Sites to Customer after meeting the KPI's.

Conduct Drive test using Temps 6 (Hasp)

From 2 Sep 2007 to to 5th November 2007: Lepton software (MH- ITI BSNL

Project).

. Conduct Drive Test using TEMS 6.1.3, 8.0.2 .

. Field Optimization (Antenna Orientation, Mechanical Tilt).

. RF Acceptance Test of Voice Quality Signal Strength, Hand over &

Calls.

. Drive Test to identify areas with Poor Coverage & Highest Call Drops.

. Drive test of Site for Call Origination Test, Hand over test &

Coverage test.

. Data Collection Cluster drives to Identity status of Site Coverage

Area.

. Find out Feeder swap.

TOOLS USED:

Drive Test & : TEMS 6.1.3,8.0.2,HASP, NEMO Outdoor-8.0.2

CW

Test

Planning Tool : MCOM 4.2 & MIPT2G, MIPT, Assistant Prob, Actix

Other : MAPINFO PROFESSIONAL 8.5& 9.0,

INDUSTRIAL INTERACTIONS:

. Two-week industrial training at Bharat Sanchar Nigam Limited

(B.S.N.L.), Indore.

. Two-week training at Satpura Thermal Power station (M.P.)

TECHNICAL QUALIFICATION:

. B.E. (2003-2006) in Electrical Engineering from "Shri Vaishnav Institute

of Technology and Science, Indore", affiliated to Rajiv Gandhi Prodyogiki

Vishwavidyalaya, Bhopal.

EDUCATIONAL QUALIFICATION:

. Passed 10+2 from M.P.Board of Secondary Education in 2001.

. Passed 10th from M.P.Board of Secondary Education in 1999.

PERSONAL INFORMATION:

Father's name : Mr. Ashok kumar Jain.

Date of Birth : 2th July, 1984.

Sex : Male

Languages known : Hindi, English

Nationality : Indian

Marital Status : married

Passport No : F7241282

CORRESPONDANCE ADDRESS:

PERMANENT ADDRESS:

Anshul Jain

Anshul Jain

9 PAYAL VATIKA

VANDANA NAGAR

Indore

(M.P. INDIA)

+91-966*******(M)

DECLARATION:

I hereby declare that the information furnished above is correct to the

best of my knowledge.

Date:

Place:

(ANSHUL JAIN)

[pic]



Contact this candidate