Post Job Free

Resume

Sign in

Power Plant Project

Location:
Hamburg, PA
Posted:
February 19, 2013

Contact this candidate

Resume:

Thomas Rupp

Email: abqrjs@r.postjobfree.com

Address: *** **** **** **

City: Hamburg

State: PA

Zip: 19526

Country: USA

Phone: 610-***-****

Skill Level: Management

Salary Range: $115,000

Willing to Relocate

Primary Skills/Experience:

See Resume

Educational Background:

See Resume

Job History / Details:

Thomas B. Rupp 644 Onyx Cave Rd

Hamburg, PA 19526

610-***-****

SUMMARY

Thirty nine years of professional experience, including thirty-four years with WorleyParsons, in financial management; project controls; cost control; scheduling; mechanical and civil/ environmental design; and construction quality control for all forms of power generation facilities, manufacturing facilities, Department of Energy, and municipal utility projects. Proficient in the use of Primavera P3 and P6, MS Project, FastTrack, Project 2, Artemis, and Premis scheduling software systems.

EXPERIENCE:

Principal Project Controls Analylist, WorleyParsons, Reading, Pennsylvania

2005 - Present:

CAMCE El Vigia Combined Cyctem Power Plant, Venezuela. Integrated project schedule with design team and client in Beijing, China.

Nuscale Modular Nuclear Facility, Oregon. Front End Engineering Schedule.

GE Inland Empire Energy Center, Riverside, California " Responsible for project controls and scheduling for the GE 7H combined cycle power facility for engineering. Duties include interfacing with GE and construction teams on the detailed integrated schedule managed by GE.

Husky Energy Sunrise Thermal Project, Calgary, Canada " Responsible for project controls and scheduling for the Sunrise Oil Sands power facility for engineering. Duties include interfacing with Husky Energy and construction teams on the detailed integrated schedule managed by Husky Energy.

PG&E, Colusa Generating Station " Responsible for project controls and scheduling for the combined cycle power facility for engineering. Duties include interfacing with Gemma Power Systems and construction teams on the detailed integrated schedule managed by Gemma.

Vung Ang Thermal Power Plant, Viet Nam - Responsible for project controls and scheduling for the Vung Ang power facility for engineering of the Turbine Building BOP support systems. Duties include interfacing with Hanoi PMC and construction teams on the detailed integrated schedule managed by Lilama.

2000 - 2005 Senior Project Controls Engineer/Specialist " Parsons I&T, Wyomissing, Pennsylvania

Business & Financial Manager for the Technology Sector " Responsible for overall coordination and management of program controls and the Wyomissing, PA facilities.

Procter & Gamble Paper Products, Mehoopany, Pennsylvania, Continuing Services Projects " Responsible for project controls and scheduling for multiple engineering and construction projects. Duties included onsite cost and schedule control on process, papermaking, converting, and Baby Care plant projects.

Grubb & Ellis Management Services, Poughkeepsie, New York Facilities Upgrade Program " Responsible for project controls and scheduling for multiple engineering and construction projects to support IBM Facility upgrades and modifications.

1991 - 2000 Senior Project Controls Specialist " WorleyParsons, Reading, Pennsylvania

Procter & Gamble Paper Products, Mehoopany, Pennsylvania, Continuing Services Projects " Responsible for project controls and scheduling for multiple engineering and construction projects including modifications to the Westinghouse combustion turbine and facility addition for high purity steam supply to the combustion turbine generator. Duties included onsite cost and schedule control utilizing the clients USFAS, CP 97, SAP, and CBS systems on process, papermaking, and converting projects.

1990 - 1991 Project Controls Specialist " WorleyParsons, Reading, Pennsylvania

Eastman Kodak Company, Rochester, New York " Responsible for project controls and scheduling for the Kodak Park Utilities Division Steam and Electric Group Capital Improvement Projects. Duties included advanced project strategic and capital planning, preparation of project funding documentation, and cost/schedule controls utilizing the clients systems.

1988 - 1990 Project Planner/Scheduler " WorleyParsons, Reading, Pennsylvania

Responsible for project controls and scheduling for:

Procter & Gamble, Albany, Georgia; Green Bay, Wisconsin; and Mehoopany, Pennsylvania " Paper Products Expansion Project

Florida Power Corporation, Crystal River Unit 3 Nuclear Power Plant " Continuing Services Project

New York Power Authority, J.A. FitzPatrick Nuclear Power Plant " Control System Modifications Project

1988 Outage Scheduler " WorleyParsons, Reading, Pennsylvania

GPU Nuclear, Three Mile Island Nuclear Power Plant, Unit 1 " Prepared and maintained schedules for refueling outage. Assigned to approximately 30 modification, inspection and maintenance tasks. Duties included preparation of detailed post outage reports for each assigned task.

1986 - 1987 Project Planner/Scheduler " WorleyParsons, Reading, Pennsylvania

Pennsylvania Power & Light Company " Responsible for project controls and scheduling for the power management system upgrade.

GPU Nuclear, Three Mile Island Unit 1, Continuing Services Project " Assisted in the preparation and maintenance of schedules.

1986 Planner/Scheduler " WorleyParsons, Reading, Pennsylvania

Responsible for project controls and scheduling for:

Virginia Electric & Power Company, Engineering Studies and Modifications

Merck Sharp & Dohme, Cogeneration Plant Project

Westinghouse 1000 MW Reference Nuclear Plant, and Korea Electric Power Company, Nuclear Units 11 and 12 " Assisted in preparation of proposed schedule and effort hour estimates.

1984 Outage Planner/Scheduler " WorleyParsons, Reading, Pennsylvania

Pennsylvania Electric Companys Seward Station, Fall Outages " Prepared and maintained integrated outage schedules and conducted daily contractor interface/update sessions. Duties included preparation of detailed post outage reports for each unit.

1980 - 1984 Planner/Scheduler " WorleyParsons, Reading, Pennsylvania

Assisted project planning engineers in preparing and maintaining critical path method (CPM) schedules, bar charts, and status reports for:

South Carolina Electric & Gas Company, V.C. Summer Nuclear Station, Unit 1 " 79 14 Pipe Support Verification Program

Cleveland Electric Illuminating Company, Perry Nuclear Station, Units 1 and 2

Supervised and coordinated a technical staff of four to ten people.

Provided engineering technical assistance including computer-generated CPM reports and graphics for numerous domestic fossil-fuel and hydroelectric power plant projects.

1976 - 1978 Mechanical Designer " WorleyParsons, Reading, Pennsylvania

Electric Utilities of Croatia and Slovenia (NEK), KRSKO Nuclear Power Plant, Yugoslavia " Prepared detailed piping system design/drawings for circulating water, steam, and regenerative waste systems.

Pennsylvania Power & Light Company, Martins Creek Power Plant " Prepared detailed piping system design/drawings for steam, water, and bottom ash handling systems.

1975 - 1976 Civil Hydrological Technician " WorleyParsons, Reading, Pennsylvania

Delaware River Basin Commission Flood Studies " Assisted in preparation of hydrological survey data. Duties included conversion of survey field notes for analysis.

1974 - 1975 Construction Inspector " WorleyParsons, Reading, Pennsylvania

Northampton, Bucks County Municipal Authority, Pennsylvania " Involved in inspection and monitoring construction of a sanitary sewer and water distribution system.

1973 - 1974 Environmental Designer " WorleyParsons, Reading, Pennsylvania

Prepared civil survey calculations, drawings, and legal descriptions for rights of way acquisition, and plan and profile drawings for various water distribution and sanitary sewer system projects.

EDUCATION

A.S., Drafting and Design Technology, Electronic Institutes, Harrisburg, Pennsylvania, 1973

SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES

Time Management, RACC, 2004

MS Access, 2000

USFAS, P&G, 1997

Front End Engineering, P&G, 1997

SQL Server, WorleyParsons, 1993

Windows, WorleyParsons, 1992

EXCEL, WorleyParsons, 1992

dBase III+, WorleyParsons, 1989 and 1992

Condor, WorleyParsons, 1987

Lotus 1 2 3, Albright College, 1986 and WorleyParsons, 1988

Interactive Graphics System (CADD), WorleyParsons, 1985-86

Fundamentals of Planning and Scheduling, WorleyParsons, 1983

Foundations of Management, WorleyParsons, 1980



Contact this candidate