Rolly Angeles, is a seasoned technical trainer, his portfolio of technical trainings focused on
Reliability and Maintenance Management courses such as Total Productive Maintenance (TPM),
Lubrication and Oil Contamination Strategy (LUB), Condition- Based Maintenance (CBM), Relia-
bility-Centred Maintenance (RCM), Root Cause Failure Analysis (RCFA), Planned Maintenance,
World Class Maintenance, Maintenance Indices and Measures and much more . . .
Rolly previously worked with Amok Technology Philippines as a TPM Senior Engineer, a multi-
national company engaged in the manufacture of integrated circuit products and spearheaded
Planned Maintenance Organization composed of maintenance managers and engineers. He was
responsible for the dramatic reduction of unplanned breakdowns in their TPM s journey as well as
RCM implementation on their Facilities Air Handling units and sub-station equipments.
Last 2005, he established his own consultancy firm, RSA Reliability and Maintenance Consul-tansy
Firm which provides a diversified lists of courses on reliability and maintenance best practices,
management training, consultation and facilitation to industries. It offers industries the opportunity to
uplift their people s technical competency on their maintenance to a level of WORLD CLASS
excellence by capturing industries best practices. Currently work as a reliability consultant and
conducts regular in-house trainings, consultation and facilitation on the courses that he provides on
Reliability and Maintenance Best Practices.
Below is a list of courses I ve developed and trained industries
Lubrication Strategy - Understanding The Importance of Oil Contamination Control
Reliability-Centred Maintenance for Industries
Planned Maintenance - Four Phases To Zero Unplanned Breakdown Strategy
Understanding Total Productive Maintenance - JIPM Approach
Understanding Condition-Based Maintenance - Total Approach To Failure Prediction & Analysis
Understanding Tom s Focused Improvement - Kobetsu-Kaizen Pillar
Root Cause Failure Analysis for Equipment - Waging War With Failures
Understanding Tom s Autonomous Maintenance Steps 1 - 3 (Part 1) of Jishu-Hozen
Meaningful Measure of Equipment s Performance - Understanding OEE, MTBF, MTTR, MTBA
Basic Maintenance Concept Understanding Reactive, Preventive, Predictive, Proactive Maintenance
Maintenance Strategies Part 1 - Overview on Predictive Maintenance & Lubrication Strategy
Maintenance Strategies Part 2 - Overview on RCFA and Basic Maintenance Concept
Optimizing Equipment s Reliability - Gearing From Reactive To Proactive Maintenance
World Class Maintenance Management - The 12 Disciplines
Relationship Between Equipment Losses and Overall Equipment Effectiveness
Basic Hydraulic Theory, Principles and Application
Achieving Proactive Maintenance - A Culture Of Reliability
Optimizing Preventive Maintenance
Has been a successful trainer over a period of 10 years and provides a regular monthly Reliability
and Maintenance Newsletter to his regular subscribers in his website at www.rsareliability.com .
Also had provided related articles and materials on Root Cause Failure Analysis, Total Productive
Maintenance, Proactive Maintenance and Lubrication and Oil Contamination Control.
CAREER and ACHIEVEMENTS
TYPICAL TRAINING ROLES TO DATE
AMKOR TECHNOLOGY PHILIPPINES (2005 2007)
Provided regular training on reliability and maintenance courses from 2005 to 2007.
Conducted 97 batches of training on different reliability courses and trained 1,545
people mostly from the maintenance department.
Reliability courses conducted includes, Reliability-Centred Maintenance, Planned
Maintenance Four Phases To Zero Unplanned Breakdown, Maintenance Kepi s and
Indices, Utilization Losses, Lubrication Strategy and Oil Contamination Control,
Condition-Based Maintenance and Root Cause Failure Analysis
Mentoring of overseas students in 2004 and 2005.
MARCUS EVANS (2007)
Invited as a resource speaker on their 2nd Annual Plant Reliability and Maintenance
Conference conducted last March 26 and 27, 2007 on Root Cause Failure Analysis.
ADVANCE RESEARCH AND COMPETENCY DEVELOPMENT INSTITUTE, (2005 2006)
Served as a resource speaker and facilitator for ARCDI on Equipment Engineering
and Reliability Courses. ARCDI which is a training institute is the centre of training
for all Semiconductor industries in the Philippines.
HERMANN AND CROSS LTD. NIGERIA (2007)
Recently conducted an RCM training and facilitation in Port Harcourt Nigeria, which
was attended by Shell, Saipmen and their consultant Hermann and Cross Ltd.
TEAM ENERGY CORPORATION, (2007)
Formerly Mirant Sual Power Plant, conducted several trainings on Root Cause Failure
Analysis and Total Productive Maintenance on their 2 Power plants in Sual and
Pagbilao Philippines
CAREER RECORD
Reliability Consultant - RSA Reliability & Maintenance Consultancy Firm (2005 Present)
Established his own Reliability and Consultancy Firm which is engaged in providing in-house
trainings, seminars, consultation and facilitation on related courses on Maintenance Best
Practices and Continuous Improvement Methodologies offered.
Lists of services provided includes :
- Implementation of Total Productive Maintenance
- Implementation of Planned Maintenance Strategy for TPM
- Implementation of Autonomous Maintenance Strategy for TPM
- Implementation of a Focused Improvement Strategy for TPM
- Adopting a Lubrication Strategy and Contamination Control in your plant
- Adopting a Condition-Based Maintenance Strategy in your plant
- Facilitation of a Root Cause Failure Analysis Group
- Facilitation of a RCM or OER group to improve current Preventive Maintenance system
- Provides initial assessment of plant s maintenance structure and provide recommendations in
order to improve their reliability.
Technical Training Specialist - Lepanto Consolidated Mining Company (2002 2004)
Development of specialized technical training modules focused on maintenance and reliability
best practices exclusively for maintenance section for LCMC.
Page 3 09/02/2008
Convince Top Management to adopt an Oil Analysis and Total Contamination Control to save on
company s lubrication and spares attributed to lubrication failures
Conducted trainings on maintenance management courses and enhance people s skills on world
class maintenance techniques and strategies
Conducted Strategic Planning for maintenance on how to achieve Proactive Maintenance
Prepared a feasibility study on Adopting a Lubricating Strategy and Oil Analysis which was
implemented as a means to save on their lubricating cost and spare parts.
Successfully facilitated Reliability-Centred Maintenance in their milling department
Dramatic reduction of Millings Maintenance cost from 57 million to 37 million Php from 2001 to
2003 through the application of Condition-Based Maintenance Strategy and Reliability-Centred
Maintenance as documented in their 2003 LCMC Annual Report.
TPM Senior Engineer - Amkor Technology Philippines (1995 2002)
Responsible for the development and implementation of TPM s pillar on Planned Maintenance,
Focused Improvement and Initial Flow Control and Early Equipment Management.
Conducted trainings on the implementation Planned Maintenance Systems on different
Steps/Phase and served as their internal consultant and provide guidance as well as guidelines
on successfully conducting TPM s Planned Maintenance pillar of TPM.
Conducted TPM Audits and Certification on Planned Maintenance teams as they complete each
Steps/Phases of Planned Maintenance
Experience dealing with JIPM (Japan Institute of Plant Maintenance) consultation and written full
documented report on Planned Maintenance and Initial Flow Control Activities for pre-
assessment requirements for JIPM Certification on TPM.
Dramatic reduction of Unplanned Breakdown on 22 Pilot Machines for Planned Maintenance
from 237 to 4 breakdowns from October 2000 to only 4 breakdowns by August 2001
Dramatic reduction of unplanned Breakdowns on 272 Fan-Out or replicated machines from us
much as 443 to 2 breakdowns from January 2001 to September 2001.
Successfully implemented RCM on Amkor s Facilities equipment s AHU and Sub-Stations.
Revision in their Preventive Maintenance Schedules dramatically reduced their breakdowns.
Facilities Breakdown Record form 26 to ZERO from Q1 2000 to Q3 2000.
Amkor s TPM Office benchmarked several times by other companies in their TPM
implementation. Provided regular consultation on Amkor s Site 3 on their Planned Maintenance
implementation.
Trained all Amkor s site 2 engineers on Poka-Yoke Implementation, Mistake Proofing for Zero
Defects and around 300 maintenance technicians, engineers and managers on Reliability-
Centred Maintenance.
During my term on handling and spearheading Amkor s Planned Maintenance form 1995 to 2002
in which 12 departments included with around 600 members for site 1 and 2. All PM teams had
generated around 9,272 documented improvements on their equipment s and a cost savings of
around Php 5,787,370.00.
Promoted twice on the success of Planned Maintenance & Nominated as Key Technical Person
last 1998.
Product Engineer Sharp Philippines Corporation (1988 1994)
Responsible for the development of TV s Cinemaborg series which includes design, mock-up
sample, testing, parts lists generation and pre-production qualification.
Implemented several cost improvement measures of TV parts without affecting the quality
output of the unit for better price competition on the market.
Responsible for assisting production side on pre-production of new products on TV and Video
series and conducting several non destructive test to assure both quality and integrity of the
product once out of the market.
Performs continuous study and improvement measures on existing TV and VCR components.
EDUCATION & QUALIFICATIONS
Passed P.R.C. s Mechanical Engineering License Board Examination with 1986
License No. 31,648 given March 31, 1986
Mapua Insitute of Technology (College Course) 1981 - 1985
Graduated with a Degree of Bachelor of Science in Mechanical Engineering
Don Bosco Technical Institute of Makati (High-School Course) 1976 - 1980
Rank 2 for both technical and academic side of curriculum
Don Bosco Technical Institute of Makati (Elementary Course) 1971 - 1975
Rank 2 for both technical and academic side of curriculum
PERSONAL
Date of Birth : May 18, 1963
Status : Married with 3 children
Current Age : 44 years old
Religion : Roman Catholic
Height : 5 ft and 9 inches
Weight : 185 lbs
Hobbies : Guitar and spending time with my kids