Job History / Details:

DONALD M. MARTONE

2741 E. Janelle Way

Gilbert, Arizona 85298

Home480-***-****

*********@*.***

PROFESSIONAL QUALIFICATIONS

Nine years business owner property maintenance, repair and remodeling. Eighteen years of management and supervision serving such industries as microelectronics, pharmaceuticals, biotech, industrial construction and custom theme manufacturing.

WORK HISTORY

AM Technical Solutions: Clean Room Dock Construction Coordinator, 11/12/2012 to 2/4/2013 - Intel, Chandler, AZ.

Coordinated tool move activities at Intel fabs. OC1, 10, 22 and 32.

Responsible for safety and making sure crating and shipping of tools were done per Intel specifications. Worked with Tool Owners, Riggers, Truck drivers and Warehouse personal.

Martone Enterprises Inc.

Commercial & Residential Property Maintenance & Remodeling, 7/2004 to 11/2012 - Gilbert, AZ

Maintain commercial properties involving duties consisting of Carpentry, Electrical, Plumbing, Painting, and Materials Purchasing. Sole point of contact for tenants and owners on all maintenance/remodeling related issues.

Construction Management Contractor, 5/2003 to 5/2004 Port Republic, VA

Project Manager for Emcor Group. Supervised the restoration of Wachovia Bank signs, ATMs and facility interiors throughout the State of Virginia. Additional duties consisted of construction estimating, material removal, and consulting for contractors on various commercial projects in the Richmond, Virginia and Washington DC areas. Projects varied from retail center openings to extensive remodeling, including fire damage renovation.

The Facility Group, Project Superintendent: MDS Pharmaceutical Phoenix Clinic, 1/2007 to 8/2007 - Tempe, AZ

Project Superintendent for a 109,000sf, 300 bed $12,600,000 Medical Research facility build out. Consisting of underground MEP, overhead MEP/FP, HVAC, site utilities, jobsite mobilization, setup, and security, site pre-construction set-up, scheduling, scopes of work, review bid packages, pre-construction meetings with potential contractors, execution of contracts, verify insurance requirements of vendors, hold contractor meetings weekly, participate in owner monthly control meetings, permit drawing delivery and payment to City of Tempe, pre-award meetings with owners and subcontractors. Oversee 20 sub-contractors, interpret drawings, specifications, submit RFI's, review monthly pay requests, hire vendors.

Gilbane Building Company, Superintendent: 7/1998 to 10/2001

Medical College of Virginia, - Richmond, VA

Lead Superintendent for 270,000 square-foot ten story addition to the Medical College of Virginia Hospital; footprint was wedged between three buildings under extremely tight conditions; with a total project cost of $135,000,000. Overall responsibilities included supervision of the outside skin fabrication; consisting of pre-cast panels, curtain walls, exterior studs, brick and front entrance landscaping and utilities tie-in. Managed daily job site schedules, ensure compliance with the relevant OSHA regulations, inspected multiple craft installations and consulted with contractors to alleviate any issues affecting project completion. Concluded project both ahead of schedule and under budget.

Merck & Co., Inc., General Superintendent: - Elkton, VA

Responsible for the site scheduling management, budget management, and contractor coordination & inspection for all services on Inoculation Laboratory remodel project. Oversight duties included the complete demolition of existing facilities and new installation of steel, HVAC, electrical, piping, plumbing, and casework in an operating clean-lab environment. Additional duties included supervising a simultaneous Utility Header Project installing 700 feet of 4-inch, high-pressure steam header and 1100 feet of stainless steel caustic header, including drops and tie-in's to 36 fermenttion modules. Participated in all pre-construction Bid Organizational Design development

sessions with Merck, Gilbane, and Merck`s contracted Engineering firm. Concluded project on schedule and under budget.

Simultaneously supervised all disciplines of superintendents and trade contractors on $25,000,000 Merck - Stonewall joint Pharmaceutical project. Duties included designing clean build protocols, writing scopes of work, budget management, scheduling activities, ensure compliance with the relevant OSHA regulations, coordinating various disciplines to obtain maximum job-site efficiency which included inspections, troubleshooting, drawing interpretation, and liaison intervention between Gilbane and Merck. Concluded project on schedule and within budget.

Amgen, Inc., Superintendent: - Longmont, CO

Supervised contractors in the construction of a $200,000,000 Biochemical facility. Duties included scheduling work activities between contractors, coordinating various disciplines to obtain maximum job-site efficiency which included specification inspections, troubleshooting, drawing interpretation, ensure compliance with the relevant OSHA regulations, and liaison intervention between Gilbane and Amgen. Concluded project on schedule and under budget.

Treadway Industries Inc., Plant Manager: 6/1996 to 7/1998 - Chandler, AZ

As a Plant Manager responsibilities included; management of three shifts and production of architectural units from expanded and extruded polystyrene used in theme parks, motion picture and television industry. Additional responsibilities included duties of Plant Safety Director.

Day & Zimmerman International, Clean Room Superintendent: 1995 to 1996 - Lubbock TX

Texas Instruments, Lubbock, TX - As Construction Superintendent responsibilities included; management and supervision of all contractors in the expansion of a fast-track 20,000sf design-build semiconductor facility. Responsibilities also included training all workers in microelectronics clean build protocol.

EDUCATION

o State of Arizona General Contractor License

o Villanova University, Lean Six Sigma, Certificate

o American Micro Analytical, Clean Room Protocol Concepts, Certificate

0 Universal Technical Institute, Diesel Technician, Diploma ASE Certified

o Rochester Institute of Technology, Building Construction

ADDITIONAL SKILLS

o Class B CDL with P endorsement

o Proficient in Microsoft Office Programs

o Bid Builder Estimating

o Journeyman Carpenter

o Precast installation



Contact this candidate