Post Job Free
Sign in

Project Manager Construction

Location:
Highland, UT
Posted:
January 24, 2013

Contact this candidate

Resume:

***** *. ******** ***

Highland, UT *****

801-***-****

abqggy@r.postjobfree.com

Lance Greer, PLS

Education

B.S., Construction Management, Weber State University, 2006

A.S., Land Surveying Technology, Salt Lake Community College 2005

University of Utah, 1998 2001, Major: Civil Engineering

Brigham Young University, 1996 1998, Major: Human Biology

Professional Registrations and Affiliations

Licensed PLS in Utah.

Experience

Green Globe Environmental, Inc. Part time PLS Construction Surveying Consultant

January 2008 Present

Campmarina Project, Sheboygan W I, June 2011 November 2011:

Green Globe Environmental has provided both Quality Control and Quality Assurance bathymetric surveying

services for a sediment removal project in the Sheboygan River. Constituents of concern include TSCA and

Non-TSCA PCB s, MGP NAPL and PAH. Green Globe Environmental built all mo dels from the design,

calculated all pay quantities, generated all as-built exhibits, and has provided technical support to a buttress

and wale support system, and sheet pile coffer dam installation in addition to performance of bathymetric

surveying services. Green Globe Environmental also provided all model updates to two Hypack/Dredgepak

mechanical dredge systems. Technology solutions provided include single beam sonar coupled to both RTK

GNSS enabled GPS as well as MT1000 indexed tracking prism and robotic total station, TSC2 with SCS 900

and Survey Controller, OPUS corrected base station, and a boat. GGE also maintained two separate GNSS

RTK dredge system models and computer component, providing dig to models, as well as the updated survey

models, and remote assistance to the operators through the use of logmein.com. Green Globe has acted as a

liaison between multiple parties including the Owner, Oversight Engineer and Contractor involved in this very

complex job.

Confidential Refinery in Virginia, August 2010 October 2010, Client Envirocon, Inc.:

GGE developed a remote controlled survey system for a remote controlled dredge used on 5 acre refinery

sludge pit. The survey system directed mounted to a Liquid Waste Technologies Pit Hog Runt dredge,

allowing for remote guidance of the remote control dredge from the bank of th e sludge pit. The system utilized

a track mounting system, 365 Prism, u-joint, 1 shaft, linear motion bearings, TSC2 with SCS 900, and a

Trimble SCS 700 Robotic total station to guide the dredge depth. GGE established the dig models for the

TSC2, established a laser guidance system at the FBP mixing area to ensure mixing did not occur below

elevation 0. GGE provided a pre-dredge bathymetric survey of 7 Acres by means of poling (Filter Backwash

Pond, Stormwater Retention Pond, and Equalization Basin) on a 25 by 25 grid. GGE also established mix

basin volumes at the FBP for sludge stabilization. GGE was also hired to conduct a three phase pilot study

involving this sludge.

Granby Grand County Airport, Summer 2008, Client: Columbine Hills Concrete

Green Globe Environmental Inc. supplied a Trimble robotic total station, TSC2, software and models (Roading

and DTM) for the construction of 2,000 feet of runway, installation of new runway lighting, construction of a 15

course segmented retaining wall, installation of wildlife fencing and new safety area g rading (approximately

30,000 CY of excavation and embankment) and construction of 3 perpendicular taxiways and 1 parallel

taxiway. The models were also utilized on a laser augmented GCS 900 CAT 140 M motor grader in addition

to the TSC2. GGE also provided project management support, SWMP plan preparation, QA/QC audit

support, construction layout training, and compilation of the as-built records and volumetric analyses.

12048 N. Grenoble Way

Highland, UT 84003

801-***-****

abqggy@r.postjobfree.com

Lance Greer, PLS

WW Clyde & Company, Machine Control / Survey Manager & Project Manager

May 2006 Present

Construction survey experience: Manage numerous pieces of machine guided heavy equipment.

Technology employed includes: GCS 900, ATS/UTS, Site Vision equipment. Design all Trimble Terrain

Models and background maps for use on machine guided equipment. Direct and manage all grade

checking operations personnel corporate wide. Perform QA/QC analyses of all collected grade data.

Cadastral survey experience: Performed record searches of properties involved in WW Clyde

construction projects. Staked property corners to ensure construction activities were within the correct

property limits.

Projects & Contract Value:

Legacy Parkway Segment 3 $100M Gross Revenue

Region 3 Wetland Bank $22M Gross Revenue

POMA Aqueduct Project $85M Gross Revenue

Moab Main Street Reconstruct $20M Gross Revenue

Envirocon Inc, Corporate Survey Manager / Project Engineer

March 2003 May 2006

Project Engineering Experience: Composed project submittals; maintained as-builts; calculated and

tracked excavation quantities; maintained project data; procured project materials ; staked countless

acres of various grading data; managed surveyors, survey data, grade control personnel and equipment;

maintained machine guided heavy equipment; generated digital terrain models for use by stakeout

personnel and heavy equipment; generated cross sections, plan and contour drawings of earthwork

operations.

Regulatory agency experience: Experience with numerous Utah municipal and state regulatory agencies

and the Wyoming Department of Environmental Quality. State storm water and erosion control permits,

limited use mine permits, Corrective Action Management Unit (CAMU) closure documents, among

others.

Design experience: Designed site conceptual model for the removal of waste from the Former Stapleton

International Airport and backfill models for the subsequent residential housing redevelopment.

Project submittal experience: Composed numerous plans including: Dust control, odor control, haul

roads, excavation, backfill placement, project schedules, and O&M Manuals.

Construction management experience: Managed subcontractors, field crews, and small teams of

professionals, specifically survey and field engineering professionals; prepared cost estimates, project

proposals, schedules, and budgets.

Projects & Contract Value:

Little Beaver Stream Restoration $7M Gross

Portland Cement Sites 1 and 5 $3M Gross

Eureka UT UPRR Cleanup $5M Gross

BP Former Casper Refinery Project $75M Gross

Lonestar Mining Grantsville $2M Gross

ASARCO East Helena Smelter $5M Gross

12048 N. Grenoble Way

Highland, UT 84003

801-***-****

abqggy@r.postjobfree.com

Lance Greer, PLS

Okland Construction, Superintendent & Corporate Surveyor

June 1998 March 2003

Projects & Contract Value:

LDS Conference Center $350 Million Gross

The Canyons Ski Resort Hotel Complex $175 Million Gross

Marriot Mountainside Resort $65 Million Gross

CRS Engineers, Survey Party Chief / Surveyor

May 1995 June 1998

Projects & Contract Value:

Salt Lake Airport Runway Expansion $65 Million Gross

Olympic Luge / Bobsled Track $35 Million Gross

Associated Foods Distribution Center $40 Million Gross

Various Property and ALTA Surveys N/A

Computer Skills

Autodesk Civil 3D, Land Desktop, Autodesk Certified Operator

Trimble: Site Vision Office, Geomatics Office, Trimble Business Center, Terramodel, Survey

Controller and SCS 900

Microsoft Office

Training

Terramodel Training

Autodesk Certified Operator

40 hour OSHA HAZWOPER (current on 8 hr refresher)



Contact this candidate