Highland, UT *****
abqggy@r.postjobfree.com
Lance Greer, PLS
Education
B.S., Construction Management, Weber State University, 2006
A.S., Land Surveying Technology, Salt Lake Community College 2005
University of Utah, 1998 2001, Major: Civil Engineering
Brigham Young University, 1996 1998, Major: Human Biology
Professional Registrations and Affiliations
Licensed PLS in Utah.
Experience
Green Globe Environmental, Inc. Part time PLS Construction Surveying Consultant
January 2008 Present
Campmarina Project, Sheboygan W I, June 2011 November 2011:
Green Globe Environmental has provided both Quality Control and Quality Assurance bathymetric surveying
services for a sediment removal project in the Sheboygan River. Constituents of concern include TSCA and
Non-TSCA PCB s, MGP NAPL and PAH. Green Globe Environmental built all mo dels from the design,
calculated all pay quantities, generated all as-built exhibits, and has provided technical support to a buttress
and wale support system, and sheet pile coffer dam installation in addition to performance of bathymetric
surveying services. Green Globe Environmental also provided all model updates to two Hypack/Dredgepak
mechanical dredge systems. Technology solutions provided include single beam sonar coupled to both RTK
GNSS enabled GPS as well as MT1000 indexed tracking prism and robotic total station, TSC2 with SCS 900
and Survey Controller, OPUS corrected base station, and a boat. GGE also maintained two separate GNSS
RTK dredge system models and computer component, providing dig to models, as well as the updated survey
models, and remote assistance to the operators through the use of logmein.com. Green Globe has acted as a
liaison between multiple parties including the Owner, Oversight Engineer and Contractor involved in this very
complex job.
Confidential Refinery in Virginia, August 2010 October 2010, Client Envirocon, Inc.:
GGE developed a remote controlled survey system for a remote controlled dredge used on 5 acre refinery
sludge pit. The survey system directed mounted to a Liquid Waste Technologies Pit Hog Runt dredge,
allowing for remote guidance of the remote control dredge from the bank of th e sludge pit. The system utilized
a track mounting system, 365 Prism, u-joint, 1 shaft, linear motion bearings, TSC2 with SCS 900, and a
Trimble SCS 700 Robotic total station to guide the dredge depth. GGE established the dig models for the
TSC2, established a laser guidance system at the FBP mixing area to ensure mixing did not occur below
elevation 0. GGE provided a pre-dredge bathymetric survey of 7 Acres by means of poling (Filter Backwash
Pond, Stormwater Retention Pond, and Equalization Basin) on a 25 by 25 grid. GGE also established mix
basin volumes at the FBP for sludge stabilization. GGE was also hired to conduct a three phase pilot study
involving this sludge.
Granby Grand County Airport, Summer 2008, Client: Columbine Hills Concrete
Green Globe Environmental Inc. supplied a Trimble robotic total station, TSC2, software and models (Roading
and DTM) for the construction of 2,000 feet of runway, installation of new runway lighting, construction of a 15
course segmented retaining wall, installation of wildlife fencing and new safety area g rading (approximately
30,000 CY of excavation and embankment) and construction of 3 perpendicular taxiways and 1 parallel
taxiway. The models were also utilized on a laser augmented GCS 900 CAT 140 M motor grader in addition
to the TSC2. GGE also provided project management support, SWMP plan preparation, QA/QC audit
support, construction layout training, and compilation of the as-built records and volumetric analyses.
12048 N. Grenoble Way
Highland, UT 84003
abqggy@r.postjobfree.com
Lance Greer, PLS
WW Clyde & Company, Machine Control / Survey Manager & Project Manager
May 2006 Present
Construction survey experience: Manage numerous pieces of machine guided heavy equipment.
Technology employed includes: GCS 900, ATS/UTS, Site Vision equipment. Design all Trimble Terrain
Models and background maps for use on machine guided equipment. Direct and manage all grade
checking operations personnel corporate wide. Perform QA/QC analyses of all collected grade data.
Cadastral survey experience: Performed record searches of properties involved in WW Clyde
construction projects. Staked property corners to ensure construction activities were within the correct
property limits.
Projects & Contract Value:
Legacy Parkway Segment 3 $100M Gross Revenue
Region 3 Wetland Bank $22M Gross Revenue
POMA Aqueduct Project $85M Gross Revenue
Moab Main Street Reconstruct $20M Gross Revenue
Envirocon Inc, Corporate Survey Manager / Project Engineer
March 2003 May 2006
Project Engineering Experience: Composed project submittals; maintained as-builts; calculated and
tracked excavation quantities; maintained project data; procured project materials ; staked countless
acres of various grading data; managed surveyors, survey data, grade control personnel and equipment;
maintained machine guided heavy equipment; generated digital terrain models for use by stakeout
personnel and heavy equipment; generated cross sections, plan and contour drawings of earthwork
operations.
Regulatory agency experience: Experience with numerous Utah municipal and state regulatory agencies
and the Wyoming Department of Environmental Quality. State storm water and erosion control permits,
limited use mine permits, Corrective Action Management Unit (CAMU) closure documents, among
others.
Design experience: Designed site conceptual model for the removal of waste from the Former Stapleton
International Airport and backfill models for the subsequent residential housing redevelopment.
Project submittal experience: Composed numerous plans including: Dust control, odor control, haul
roads, excavation, backfill placement, project schedules, and O&M Manuals.
Construction management experience: Managed subcontractors, field crews, and small teams of
professionals, specifically survey and field engineering professionals; prepared cost estimates, project
proposals, schedules, and budgets.
Projects & Contract Value:
Little Beaver Stream Restoration $7M Gross
Portland Cement Sites 1 and 5 $3M Gross
Eureka UT UPRR Cleanup $5M Gross
BP Former Casper Refinery Project $75M Gross
Lonestar Mining Grantsville $2M Gross
ASARCO East Helena Smelter $5M Gross
12048 N. Grenoble Way
Highland, UT 84003
abqggy@r.postjobfree.com
Lance Greer, PLS
Okland Construction, Superintendent & Corporate Surveyor
June 1998 March 2003
Projects & Contract Value:
LDS Conference Center $350 Million Gross
The Canyons Ski Resort Hotel Complex $175 Million Gross
Marriot Mountainside Resort $65 Million Gross
CRS Engineers, Survey Party Chief / Surveyor
May 1995 June 1998
Projects & Contract Value:
Salt Lake Airport Runway Expansion $65 Million Gross
Olympic Luge / Bobsled Track $35 Million Gross
Associated Foods Distribution Center $40 Million Gross
Various Property and ALTA Surveys N/A
Computer Skills
Autodesk Civil 3D, Land Desktop, Autodesk Certified Operator
Trimble: Site Vision Office, Geomatics Office, Trimble Business Center, Terramodel, Survey
Controller and SCS 900
Microsoft Office
Training
Terramodel Training
Autodesk Certified Operator
40 hour OSHA HAZWOPER (current on 8 hr refresher)