Post Job Free
Sign in

Project Manager

Location:
India
Posted:
January 25, 2013

Contact this candidate

Resume:

Xem h s

In

Tr n Nguy n

Nam

**/**/****

k t h n

Thông tin liên hệ

Tên hồ sơ: Kỹ sư công nghiệp

Thông tin cá nhân:

Tên ứng viên: Trần Nguyên Kinh nghiệm: 5 Năm

Ngày sinh: 29/06/1978 Bằng cấp: Đại học

Giới tính: Nam Cấp bậc: Kỹ sư

Tình trạng hôn nhân: Đã kết hôn Trình độ ngoại ngữ:

Thông tin bổ sung: Project Name: 2 Additional Crude Oil Tank EPCC Package - Dung Quat Refinery Project.

Duties: Project Manager.

Binh Son Refining & Petrochemical Co. Ltd. (OWNER), who will commercially operate the Dung Quat Refinery, plans to install two additional crude oil tanks named as TK-6001G/H) adjacent to the existing crude oil tankage area in the north side of Dung Quat Refinery and will be operated in parallel with six existing crude oil tanks to provide the refinery with higher inventory capability.

Verify the current Design of System and facilities to assure that two additional crude tanks will be properly designed, installed and operated with fully incorporating of existing system. (This is included but not limited to the tanks datasheet, hydraulic of current suction & discharge of the tanks, etc.)

Procurement of Equipment and Materials and their delivery at Site, including but not limited to two Additional crude tanks, related valves and pipelines :

Crude Tanks

Other Equipments

Control and Instrumentation

Electrical

Piping & Mechanical

Civil

Construction, including labor and construction tools

Fully responsibility for all requirements including supervision, direction during pre-commissioning, commissioning, test-run activities and all control and instrumentation requirements functional testing, etc until the Initial Acceptance of facilities offered

Project Name: High Sulfur Crude Oil Pump EPC Package - Dung Quat Refinery Project.

Duties: Project Manager

Binh Son Refining & Petrochemical Co. Ltd. (BSR) decide to install two additional high sulfur crude pumps at crude oil tankage area and will be operated in parallel with three current low sulfur crude pumps to provide the refinery with the possibility of co-processing two different crude oil sources at the same time (in-line blending). The Scope of Work is detail describable as follow :

Verify the current Design of System and facilities to assure that two additional high sulfur crude pumps will be properly designed, installed and operated with fully incorporating of existing system. (This is included but not limited to the pump datasheet, hydraulic of current suction & discharge of the pumps, etc.)

Procurement of Equipment and Materials and their delivery at Site, including but not limited to two additional high sulfur crude pumps, related valves and pipelines :

Two Motor driven API centrifugal pumps ( VS6 type )

Oil mist lubrication system

Control and Instrumentation

Electrical

Piping & Mechanical

Civil

Construction, including labor and construction tools

Fully responsibility for all requirements including supervision, direction during pre-commissioning, commissioning, test-run activities and all control and instrumentation requirements functional testing, etc until the Acceptance of facilities offered

To develop interface plan(s) with Dung Quat refinery and implement it without shutting down the refinery

Smooth PROJECT integration into the current facilities including the mechanical, instrumentation, electrical, etc

Mục tiêu nghề nghiệp

Vị trí: Kỹ sư công nghiệp

Ngành nghề mong muốn: Cơ khí / Kỹ thuật ứng dụng - Dầu khí/Khoáng sản - QA/QC

Nơi muốn làm việc: Hồ Chí Minh, Quảng Ngãi, Khánh Hòa

Loại hình: Toàn thời gian

Hình thức: Nhân viên chính thức, Nghề tự do

Mục tiêu nghề nghiệp: Được đào tạo, có cơ hội thăng tiến. Thu nhập cao đủ đảm bảo cuộc sống.

Mức lương mong muốn: Thỏa thuận

Quá trình học vấn và bằng cấp

Năm tốt nghiệp

01/2001

Đại Học THủy Sản Nha Trang/96-2001 - Nha Trang-Khánh Hòa, Việt Nam

Đại học

Năm tốt nghiệp

12/2000

Đại Học Thủy Sản Nha Trang - Nha Trang, Viet Nam

Đại học

Project Management Skill held by Asian Institute Of Technology ( AIT ) in ThaiLand.

Proficient in operating Microsoft Office, P3 Primavera, MS Project, Autocad

Năm tốt nghiệp

12/2000

Đại Học THủy Sản Nha Trang/96-2001 - Nha Trang-Khánh Hòa, Viet Nam

Đại học

Năm tốt nghiệp

12/2000

Đại Học Thủy Sản Nha Trang - Nha Trang, Việt Nam

Đại học

Năm tốt nghiệp

12/2000

Đại Học THủy Sản Nha Trang/96-2001 - Nha Trang-Khánh Hòa, Việt Nam

Đại học

Kinh nghiệm làm việc

04/2002 - Hiện nay

Dịch vụ Kỹ Thuật Dầu Khí ( PTSC ) - Quảng Ngãi/ Khánh Hòa

Trưởng Phòng Kế hoạch sản xuất

WORKING EXPERIENCES

2002 - Present Petroleum Technical Services Company (PTSC) PTSC Quang Ngai

Job title: Manager of Planning & Operation Dept.

Quality Management Representative ( QMR )

Company profile:

Subsidiary of Petroleum Technical Services Company, management and operation of warehouse and storage facilities for petroleum materials and products, management and operation of fuel retail networks in Quang Ngai and neighboring provinces; transportation and trading of oil and gas products in the region; processing of oil and gas products; provision of transportation, loading, offloading, forwarding services, operation and management of maritime port; construction, fabrication of onshore & offshore facilities; supply of materials, equipment for Oil & Gas sector in Quang Ngai.

Project Name:Dung Quat Breakwater Soft Soil Treatment

Scope of Work:

Within 6 months from April 15, 2005 to Octoper 15, 2005 PTSC Quang Ngai must finish the project with the scope of work as below :

Set - up site office at reasonable location, procurement office equipments and other site utilities and facilities.

Construction weight bridge and carry out calibrattion in accordance with Viet Nam regulatory.

Construction stockpiles with sufficient area for storing approximately 700,000 m3 of rock.

Production, loading, transportation and unloading 700,000 m3 of rock - including 1" - 4" and 5 - 500 kg kinds of rock - stored at stockpiles.

Loading, transportation the rock from stockpile to jetty for dumping to barges.

Some other services such as ship agent, import-export formality, equipment rental, mechanical, ect..

Duties:

Project planning and scheduling.

Organizing the site personnel to supervise the various activities to ensure that the works are carried out in accordance with specification, schedule, project quality plan and safety management system.

Organize site meeting with sub-contractors, progress meeting with presenting the site work progress.

Prepare work schedule, highlight the actual schedule with the baseline schedule and specific target schedule with equipments, vehicles, stockpile and manpower with productivity rate.

Prepare monthly progressive payment claims.

Liaise with owner, clients and sub-contractors.

Project Name:Dung Quat Refinery project - Package 4 : Onshore/Offshore Installation & Pre-commissioning Services for Crude oil Import Pipelines, PLEM and Single Point Mooring System.

Duties:

Preparation Bid Document for Onshore work. Including :

Draw out Site Organization Chart identifying general foreman and above. Attached with CV.

Method Statement : listing and description the method to carry out the works in accordance with Contractor requirements and National, International standard. Attached with general/detail drawing and procedure.

Calculation, sheduling Direct/Indirect man - power, major field equipment.

Project Panning and scheduling by using Primavera project Software.

List of site facilities, utilities.

HSE Documents.

Calculation bid price lump sum and breakdown.

2000 - 2002 Huyndai Vinashin Shipyard Co., Ltd.

Job Title: Engineer

Company profile:

One of the leading company in repairing, building and structuring shipyards in Vietnam.

In charge of :

Hull survey in Accordance with LLOYD'S, NK, DNV and other classifications Society for the fabrication and repairation of Cargo Vessels, selfjack-up Rig ( Cuu Long offshore), Crane vessels ( Truong Sa, Hoang Sa, Con Son ). Specially Ship yard's representative to Co-operate with Service Engineers to carried out maintenance and repairing all kinds of Controllable Pitch Propeller ( CPP ).

Incharge of repairing all kind of Boiler, heater exchager and other related equipments such as valves, insulation, tube and pipe.

Responsibilities for all works related to repairing boiler, economizer and other heater exchanger : scheduling repairing progress base on material delivery to shipyard, number of worker and equipment in hand. The schedule should be strong association with other job and teams.

Project Name:GORYO 6 vessel Modification Project

Scope of work:

A member in Technique procedure Team for "Reform GORYO 6 Project " a kind of General Cargo vessel reformed into Sand carring vessel - The US$16 millions Project and high requestion of designation, fabrication and installation piping systems skill Project. The responsibilies was re-designing cargo holes, sand offloading piping system and other facilities. Designing Supervisor during construction phase and raised the difference developed during construction phase.

Project Name:Talisman Project in Malaysia

Scope of work:

QA/QC inspector including welding inspection and documentation for fabrication of living quarter and equipment in conformity with International codes and standards.

04/2002 - Hiện nay

Dịch vụ Kỹ Thuật Dầu Khí ( PTSC ) - Quảng Ngãi

Trưởng phòng Kế hoạch Sản xuất

WORKING EXPERIENCES

2002 - Present Petroleum Technical Services Company (PTSC)

PTSC Quang Ngai

Job title: Manager of Planning & Operation Dept.

Quality Management Representative ( QMR )

Company profile:

Subsidiary of Petroleum Technical Services Company, management and operation of warehouse and storage facilities for petroleum materials and products, management and operation of fuel retail networks in Quang Ngai and neighboring provinces; transportation and trading of oil and gas products in the region; processing of oil and gas products; provision of transportation, loading, offloading, forwarding services, operation and management of maritime port; construction, fabrication of onshore & offshore facilities; supply of materials, equipment for Oil & Gas sector in Quang Ngai.

Project Name:Dung Quat Breakwater Soft Soil Treatment

Scope of Work:

Within 6 months from April 15, 2005 to Octoper 15, 2005 PTSC Quang Ngai must finish the project with the scope of work as below :

Set - up site office at reasonable location, procurement office equipments and other site utilities and facilities.

Construction weight bridge and carry out calibrattion in accordance with Viet Nam regulatory.

Construction stockpiles with sufficient area for storing approximately 700,000 m3 of rock.

Production, loading, transportation and unloading 700,000 m3 of rock - including 1" - 4" and 5 - 500 kg kinds of rock - stored at stockpiles.

Loading, transportation the rock from stockpile to jetty for dumping to barges.

Some other services such as ship agent, import-export formality, equipment rental, mechanical, ect..

Duties:

Project planning and scheduling.

Organizing the site personnel to supervise the various activities to ensure that the works are carried out in accordance with specification, schedule, project quality plan and safety management system.

Organize site meeting with sub-contractors, progress meeting with presenting the site work progress.

Prepare work schedule, highlight the actual schedule with the baseline schedule and specific target schedule with equipments, vehicles, stockpile and manpower with productivity rate.

Prepare monthly progressive payment claims.

Liaise with owner, clients and sub-contractors.

Project Name:Dung Quat Refinery project - Package 4 : Onshore/Offshore Installation & Pre-commissioning Services for Crude oil Import Pipelines, PLEM and Single Point Mooring System.

Duties:

Preparation Bid Document for Onshore work. Including :

Draw out Site Organization Chart identifying general foreman and above. Attached with CV.

Method Statement : listing and description the method to carry out the works in accordance with Contractor requirements and National, International standard. Attached with general/detail drawing and procedure.

Calculation, sheduling Direct/Indirect man - power, major field equipment.

Project Panning and scheduling by using Primavera project Software.

List of site facilities, utilities.

HSE Documents.

Calculation bid price lump sum and breakdown.

2000 - 2002: Huyndai Vinashin Shipyard Co., Ltd.

Job Title: Engineer

Company profile:

One of the leading company in repairing, building and structuring shipyards in Vietnam.

In charge of :

Hull survey in Accordance with LLOYD'S, NK, DNV and other classifications Society for the fabrication and repairation of Cargo Vessels, selfjack-up Rig ( Cuu Long offshore), Crane vessels ( Truong Sa, Hoang Sa, Con Son ). Specially Ship yard's representative to Co-operate with Service Engineers to carried out maintenance and repairing all kinds of Controllable Pitch Propeller ( CPP ).

Incharge of repairing all kind of Boiler, heater exchager and other related equipments such as valves, insulation, tube and pipe.

Responsibilities for all works related to repairing boiler, economizer and other heater exchanger : scheduling repairing progress base on material delivery to shipyard, number of worker and equipment in hand. The schedule should be strong association with other job and teams.

Project Name:GORYO 6 vessel Modification Project

Scope of work:

A member in Technique procedure Team for "Reform GORYO 6 Project " a kind of General Cargo vessel reformed into Sand carring vessel - The US$16 millions Project and high requestion of designation, fabrication and installation piping systems skill Project. The responsibilies was re-designing cargo holes, sand offloading piping system and other facilities. Designing Supervisor during construction phase and raised the difference developed during construction phase.

Project Name: Talisman Project in Malaysia

Scope of work:

QA/QC inspector including welding inspection and documentation for fabrication of living quarter and equipment in conformity with International codes and standards.

COURSE ATTENDED

Course of Reforming Vessel

Held by Huyndai Mibo Dockyard co., Ltd.

Planning and Warehousing Certificate (VPC)

Quality Internal Auditor Certificate (VPC)

Non-Destructive Testing (Apave Vietnam & South East Asia)

Course of Improvement Project Management Skills)

Held by Ministry of Planning and Investment

Inland Waterways Training Program held by MALAYSIAN MARITIME ACADEMY ( ALAM ).

12/2000 - Hiện nay

PTSC Corporation - HMC

Mechanical Engineer

Technical Manager

Kỹ năng

Others

Làm việc độc lập - Tốt - Kinh nghiệm: 6 Năm

Có khả năng lập kế hoạch, quản lý và điều hành các dự án lớn, đặc biệt làm việc với các đối tác là người nước ngoài.

Am hiểu hệ thống quản lý chất lượng ISO 9001:2000. Có khả năng xây dựng hệ thống QLCL cho Công ty.

Thành thạo các phầm mềm tin học chuyên dụng như : MS Project, Primavera, AutoCad...

Đã được đào tạo ở nước ngoài ( Malaysia ) ở lĩnh vực hàng hải.

Làm việc độc lập - Tốt - Kinh nghiệm: 6 Năm

Quản lý dự án lớn, được biệt là các dự án với các đối tác nước ngoài.

Lập kế hoạch và điều hành sản xuất bằng các phần mềm chuyên dụng như Microsoft Project, Primavera.

Lập hồ sơ thầu hoàn chỉnh bằng tiếng Anh.

Làm việc theo nhóm hoặc độc lập, có thể đi xa nhà.

Khác

Chịu áp lực - - Kinh nghiệm: 9 Năm

Người tham khảo

Trần Đạt Nguyên

Trưởng Phòng Kỹ Thuật - PTSC

Điện thoại: 090*******

Email: ***************@*****.***

Mối quan hệ: Công việc

Trần Đạt Nguyên

Trưởng Phòng Kế hoạch Sản xuất - Công ty Dịch vụ Kỹ thuật Dầu khí ( PTSC )

Điện thoại: 090*******

Email: **********@****.***.**

Mối quan hệ: Công việc

Trần Đạt Nguyen

Trưởng phòng Kế hoạch sản xuất - Công ty Dịch vụ Kỹ thuật Dầu khí ( PTSC )

Điện thoại: 090*******

Email: **********@****.***.**

Mối quan hệ: Công việc



Contact this candidate