Post Job Free
Sign in

Project Manager Engineer

Location:
Los Angeles, CA
Posted:
January 27, 2013

Contact this candidate

Resume:

Vinay Goyal

Email: *********@********.***

Address: ***** ******* ***** ****

City: Northridge

State: CA

Zip: 91326

Country: USA

Phone: 818-***-****

Skill Level: Experienced

Salary Range: $110,000

Willing to Relocate

Primary Skills/Experience:

See Resume

Educational Background:

See Resume

Job History / Details:

Vinay Goyal

19423 Crystal Ridge Lane

Northridge, CA 91326

818-***-****

**********@***.***

Professional Engaged in the Electronics manufacturing industry for 14+ years with focus on process and

Summary service improvements, data analysis and supply chain Quality program management.

Feb09 Product Compliance/ Quality, FLIR Systems, Goleta, CA (Defense and Consumers)

to Manage customer requests related to Product Stewardship/ Green Products including RoHS,

June12 REACH, WEEE, Conflict Minerals, California proposition65, Green Passport, SIN assessment etc.

Managed Critical Component supplier risk assessment

Created and managed a parts obsolescence data management system

Silicon Experts compliance tools/ SAP techni data solutions

April08 Supplier Development Engineer -Contractor/ Lead, Boston Scientific, CA (Medical Device)

to Lead supplier Quality improvement initiatives, Supplier Audits, Corrective actions

Dec08 Responsible for the implantable electronic active medical devices

Assist supplier with Process validation during process/facility changes

Tools used: ISO 13485, Risk Management, FMEAs, IQ, PQ, OQ

Aug07 Project Manager- Contractor, Enventure Technologies, CA (Engineering Service Provider)

to Managed outsourced programs for Component Engineering

April08 Developed project specifications, documented statements of work, coordinated deliveries and managed communication between client and delivery teams based in India. Was involved in engagements where client data had to be extracted from ERP & PLM systems for processing and then mapped back on completion of validation cycles

Quality Manager, Data Direct Networks CA (Data storage devices)

Aug05 Worked on Supplier Quality Requirements Document to meet IBM requirements

to Provided leadership in implementing and coordinating a Quality Improvement Program

Aug07 to eliminate and prevent defects in electronic assemblies

Lead a cross-functional team of managers to review Quality data on a daily basis

Improve productivity in Board-debug area and board repair turnaround time

Monitored MTBF, AFR, SOQL and addressed customer service issues

Conducted Lead-free audits

Managed supply chain procurement for lead-free prototype builds and testing

Project Management for Cost reduction activities

Mar 01 Supplier Development Engineer, Luminent-oic (now source-photonics), CA (Telecom)

to Established "Supplier Qualification Process" based on ISO9001 & Telcordia GR-357

Aug05 Qualified key Subcontractors for PCB, PCBA, fiber optic jumper cable assembly,

Die cast and machine parts based on process audits both locally and in China to ensure optimum quality based on preventive measures

Generated and maintained approved supplier list

Established "Charter of Expectations" with suppliers to control quality levels

Conducted Root Cause Analysis in regards to supplier quality issues related to IPC standards

for Land pattern design, IPC-A-610, IPC-600, Solderability testing, Moisture Sensitivity Levels and IPC-TM-650 test manual and J-STDs

Improved First pass yields for new product introductions from 20% to 90%

Established procedures to monitor clean room air cleanliness per FED209 standards

Apply selected Advance Quality Planning techniques per AIAG requirements

Implemented/wrote procedure for source inspection with Verify-Group China

Lead transition to lead-free and RoHS-compliant electronics assembly per IPC standards

Feb 98 Quality Manager, EOS Corporation, Camarillo, CA (ISO-9001 certified)

To (high density AC/DC Switching Power Supplies")

Mar 01 Improved Process average "First Pass Yields" from 65% to 96%. Established process trends

Established procedure for ATE configuration management

Implemented SPC (P and X-Bar/R chart on Glue, Chip shooter and Wave solder machines)

Established and maintain Receiving Inspection program

Established and maintain Corrective & Preventive action program

Established MRB process

Established and maintain OBA process with closed loop corrective actions

Established and maintain Customer Complaint handling process including field failure metrics

Established and maintain the Internal Audit program

Conducted root cause analysis to locate continuous improvement areas

Implemented ISO procedures in areas including Contract review, Purchasing, Document control and Sustaining engineering

Coordinated Quality engineering program for customer "DELL computers"

Established Data collection system at overseas facility in Malaysia for FPY reports

Management Representative for ISO administration.

Performed in-depth analysis of various MES systems for shop floor data collection

April 96 Quality Engineer, JMR Electronics Inc, CA (ISO-9001 certified) (Data storage devices)

to Lead the "Material Review Board"

Nov97 Implemented SPC on the shop floor, Conducted Process Capability studies

Maintained Corrective actions & follow up, First Articles, and Statistical data

Maintained Calibration control system and QC inspection plans.

Aug 94 Entrepreneur, New Business Development, IFF USA Inc. Chatsworth, CA (Filtration)

to Conducted extensive Market research for import/export of filtration/textile products

March 96 Closed sales worth $900,000 in 6 months; Traveled across US to meet customers

Made thousands of Cold calls

Handled import/export procedures and shipments to/from US

Sept 92 Advanced Quality Engineer, ATC Corporation, Cleveland, OH (Automotive)

to "Injection Molding & Metal Stamping" Automotive supplier to Big 3

April 94 Coordinated SPC activities, Capability studies, improved measurement systems using

Gage R&R, Conducted Design of Experiments

Conducted training in blue print reading, SPC & Metrology

Was responsible for Advanced Quality Planning & PPAP process that included

FMEAS, Process Control plans, Process Flow Diagrams, Part Layouts and ISIR's

EDUCATION MS Industrial Engineering, Dec 1992, Cleveland State University, Ohio

Emphasis of studies: Statistical applications in defect prevention & Process Controls

Robotics & Automation, Production & Operations management

Advanced engineering economics, Simulation, Quality Function Deployment

BS Electronics Engineering, Dec 1988, Manipal Institute of Technology, India

Design Project: Designed Analog/Digital interface for a CNC drilling m/c

Taken four MBA level courses at Pepperdine University

Certificate in Lead-free soldering from Kester University

COMPUTER Visual Basic, MS Access, MS Word, MS Excel, Visio, Google tools, SAP-Technidata,

SKILLS Silicon Experts, MES (Manufacturing Execution Systems), SAP, NWA Quality Analyst,

Working knowledge of Client-server systems, Data Works

REFERENCES Available upon request

CITIZENSHIP US



Contact this candidate