Larry Why
Email: abpwn5@r.postjobfree.com
Address: *** **** ******
City: Manchester
State: PA
Zip: 17345
Country: USA
Phone: 717-***-****
Skill Level: Management
Salary Range: $75,000
Primary Skills/Experience:
See Resume
Educational Background:
See Resume
Job History / Details:
Lawrence Why
369 York Street
Manchester, Pa. 17345
abpwn5@r.postjobfree.com
Education
U.S. Navy Seabees, United
States Military, 1972-1975
Professional
Certifications
OSHA 30-Hour Course
Construction Safety &
Health
Background
I personally have more than 40 years of construction quality assurance/quality
control (QA/QC) inspection and project coordination experience, including
twenty five years of experience as a Project Superintendent and three years as
a Quality Assurance Construction Engineering Technician, on federal capital
projects.
Relevant Experience
Naval Facilities Engineering Command Mid-Atlantic Program Support,
Seaport Enhanced, Northeast - Mechanicsburg, PA (2009-2012): As Quality
Assurance Construction Engineering Technician, provided construction
management services in support of Naval Facilities Command's (NAVFAC)
construction program at various locations throughout the northeastern United
States. The program involves staff augmentation for design management and
construction management, including safety oversight. Projects involved new
construction and building renovations and repairs. Representative projects
included:
. Whole Center Repairs, Naval Reserve Center Erie, PA ($4.4M)
. Whole Center Repairs, Naval reserve Center Ebensburg, PA ($3.9M)
. Pedestrian Bridge Replacement and Quay Wall Improvements,
Naval Reserve Center Buffalo, NY ($1.7M)
1
. Replace Roof, Building 410, NSA Mechanicsburg, PA ($2.2M)
. Demolition Building 402, NSA Mechanicsburg, PA ($632K)
. Renovate Restrooms in Building 410, NSA Mechanicsburg PA
($139K)
. Repair Sinkhole at Building 303, NSA Mechanicsburg, PA ($7,280)
. Whole Center Repairs, Naval Reserve Center Rochester, NY ($4.29M)
. BRAC Project Marine Corps Reserve Center (MCRC) Moundsville, WV to
Naval Reserve Center Pittsburgh, PA ($1.681M)
. Salt Dome and Storage Shed Construction, NSA Mechanicsburg ($325K)
. Replace Fuel Tank at Building 311C, NSA Mechanicsburg
1
Mc Donough, Bolyard, Peck Construction Consulants Fairfax, Va. (2009-
present)
As O/C Q/A (Subcontract through Parsons)
Provide Q/C Q/A on Seaport-E contract to NAVFAC naval construction
projects listed above from 2009 -2012 as an engineering technician for
NAVFAC home base, Mechanicburg, Pa ( Naval Support Activity Base)
Towson mechanical, Brockbridge Correctional Facility Kitchen Expansion,
Jessup, MD (2007-2008): As Project Superintendent, responsible for
coordinating, scheduling, and sequencing all subcontractors working in a
limited and restricted space. In addition, was the lead quality assurance and
safety inspector for the contract team performing all work on the project.
Project consisted of a $6 million expansion to the industrial kitchen facilities
from the foundations through kitchen equipment connections, with detailed
plumbing requirements as well as significant ventilation coordination efforts.
Data Center Renovation and Chiller Replacement, NSA Mechanicsburg, PA
(2006-2007): As Project Superintendent, responsible for the quality assurance
and safety inspection, scheduling, and coordination of all subcontractors
during the project. The $12.5 million project included the demolition of
existing and creation of a new mechanical room, including new chillers, three
new SCIF areas, and new restrooms within an existing and occupied facility.
The project also included the installation of a new FM200 fire suppression
system and a Vesda smoke detection system.
Housing Improvements and Development, York, PA (2004-2006): As Project
Superintendent, developed and executed all renovation plans and coordinated
2
all subcontractors as necessary for the sale of redeveloped homes as well as
purchased, renovated, and sold residential properties throughout south
central Pennsylvania.
James F. Knott Construction, Md (1999-2004): As Project Superintendent,
responsible for the scheduling, coordination, oversight, and inspection of all
construction activities and subcontractors on various projects throughout
Maryland. The projects were both new construction and renovations. Projects
included:
. Building 8 Interior Renovation ($1.1million), JHU Applied
Physics Laboratory, Laurel, MD
. Kernan Hospital - Physical Therapy Facility Interior Fit Out
($1.1million), Timonium, MD
. Westminster Rescue Mission ($4million), Westminster, MD
. Hampstead Police Station ($1million), Hampstead, MD
Richard D. Poole, Inc., Various Projects, PA (1986-1999): As Project
Superintendent, responsible for supervising, coordinating, and inspecting all
work performed by subcontractors on a variety of renovation and new
construction projects throughout southern Pennsylvania. Projects included:
. Warehouse for Donsco, Inc, Mt Joy, PA
. Commonwealth Packaging Office, Linglestown, PA
. Hamilton Bank in the Galleria Mall, York, PA
3