Title:HVAC Designer
*********@*********.***
Document
Source below
NAME: ROD PASCUA
ADDRESS:
CITY: Cerritos
STATE/PROVINCE: CA
ZIP/POSTAL CODE: 90703
COUNTRY: USA
EMAIL: *********@*********.***
PHONE: 562-***-****
CANDIDATE ID: N/A
CITIZENSHIP: US
Citizen
EDUCATION: Not Entered
EXPERIENCE: Not Entered
WILL RELOCATE: Not Entered
RELOCATION INFO: Not Entered
JOB WANTED: Not Entered
HOMEPAGE:
HOTSKILLS:
ESUME
ROD R PASCUA
12004 Aclare St
Cerritos, CA 90703
Fax:562-***-****
*********@*********.***
OBJECTIVE:
To establish a long term working relationship in a company where my
strengths and
experience in the HVAC field can be used to its fullest potential.
ABILITY TO:
Plan, direct, oversee and execute corrective and preventive
maintenance
procedures and installation of HVAC equipments, fire protection,
plumbing, sanitary and
other related mechanical equipments.
Design lay-outs, detailing and load/size calculations of HVAC, duct,
piping, &
plumbing systems.
Analyze, review, check and interpret HVAC, plumbing & sprinkler system
plans,
estimates and specifications.
Organize, coordinate and execute design, schedule and direction of
projects.
Prepare material take-offs, cost estimates and budget.
Monitor and oversee projects from preliminary planning to final
completion.
Apply electrical skills to controls, facilities and building
construction.
Communicate effectively and write good technical reports.
Operate AutoCad R14, HVAC Load Calculation/Analysis programs,
Microsoft Office
softwares.
Diagnose and repair automotive mechanical components.
WORK HISTORY:
S&K Engineers
911 S. Primrose Ave., Suite C
Monrovia, CA 91016
HVAC Designer, October 4, 1999 to March 10, 2000
Preparation of design drawings, construction drawings, load
calculations, equipment
selections of HVAC systems and equipments using the following
softwares; AutoCad
R14.1, Carrier load calculation softwares. It also includes the
preparation of plumbing
design drawings and field surveys.
Western Air & Refrigeration Co
.
15914 S. Avalon Boulevard
Compton, CA 90220
Piping Engineer
(contract), April 26, 1999 - Sept. 17, 1999
Project: Amgen Pharmaceutical Plant - Thousand Oaks, CA
Preparation of detailed drawings for chilled water, hot water, steam,
condensate,
refrigerant piping layouts using AutoCAD R14 in coordination with
other trades.
MSA Construction & Development Corporation - Philippines
Project Engineer, October, 1996 - Aug., 1998
Project: Elin Pharmaceutical Plant - Philippines
Supervised and managed the over-all mechanical works in the various
phases of
construction of HVAC system. Responsibilities included the preparation
of shop
drawings, material take-offs, installation of HVAC equipments,
boilers, dehumidifiers,
dust collectors, air compressors, vacuum pumps and other accessories
to satisfy
pharmaceutical plant requirements in clean room conditions.
J.A. Jones Construction Co. of USA
(Charlotte, NC)
Mechanical Engineer, July 16, 1994 - June 6, 1996
Project: New U.S. Embassy Building Complex - Kuwait
Supervised the building complex duties and responsibilities related to
all phases of
construction of HVAC, automatic sprinkler and fuel delivery piping
systems, emergency
generator sets, plumbing and sanitary equipments. It also includes the
preparation of
detailed and coordination drawings and material take-offs for HVAC,
Plumbing, Sanitary
and Sprinkler systems.
Lores Realty Ent., Inc
. - Philippines
Chief Engineer, March 1, 1990 - June 30, 1994
Supervised the building and grounds maintenance of a cinema-shopping
complex which
included all mechanical, electrical, civil, plumbing, sanitary, fire
protection and
emergency generator sets.
Binladen Bemco, Jeddah, Saudi Arabia
Mechanical Engineer, February 17, 1988 - September 6, 1989
Project: Royal Palaces
Supervised the fabrication of ducting materials, prepared material
take-offs, and
approved the release and prompt delivery of finished ducts and air
devices to project
sites.
Mansourya Consulting, Riyadh, Saudi Arabia
Design Engineer, May 20, 1987 - January 4, 1988
Project: Asir Desalination & Power Plant Housing
Designed air-conditioning and plumbing systems which included load
calculations,
piping and duct design, equipment selections, preparation of
construction drawings,
material take-offs and cost estimates.
Riyadh Waterworks, Riyadh, Saudi Arabia
Air-conditioning Engineer, April 21, 1982 - March 20, 1986
Directed the operation and maintenance of all HVAC and fire protection
units at Wasia
and Salbulk Water Treatment Plants, Pumping Stations, Power
Substations, Employees
Village Hospital, School Buildings and Employee Lodgings.
Rolaco Engineering of USA, Jeddah, Saudi Arabia
Air-conditioning Engineer, 1980 - 1981
Project: Saudi Arabian Airlines - Jeddah International Airport.
Prepared load calculations, material take-offs, detailed drawings and
equipment
selections for air-conditioning units. Supervised the commissioning
process and
installation of these units in hangars, support facilities and
offices.
Manila Electric Company, Manila, Philippines
Mechanical Maintenance Engineer, 1966 - 1980
Plan, direct, oversee and execute hands-on corrective and preventive
maintenance
procedures of air conditioning, refrigerating, ventilating and fire
extinguishing
equipments.
EDUCATION:
University of Santo Thomas,
Manila, Philippines
B.S
. Mechanical Engineering, 1961-1966
STATUS: Permanent resident (green card holder)
CERTIFICATE: OPERATION & MAINTENANCE ENGINEERS CERTIFICATION -
UNIVERSAL
(EPA 608) - Los Angeles, CA
REFERENCES: Upon request
i