Mark Pazolli
Summary
Experience Electrical power engineer
Five years experience
Reliability Engineer
Seeking new projects to
**** ** **** / ******* ***** broaden my experience as an
engineer
Eighteen months working as a reliability engineer
identifying the cause of faults, proposing solutions and
sponsoring projects to improve the reliability Field experience
performance of the network. Ten months as a construction
manager
Construction Manager plus
2010 / Western Power Seven months assisting a
protection commissioning
Ten months working as a construction manager technician as a graduate
arranging outages, organizing work crews for projects, engineer
arranging procurement and transport of materials to
site, preparing work documentation and resolving
Design experience
site/design issues with engineers.
Six months in distribution design
Graduate Engineer plus
2009 to 2007 / Western Power Six months in
telecommunication design
3-year graduate programme with five rotations in
plus
estimating, system simulation, distribution design,
protection commissioning and telecommunications. Six months of preliminary HV
engineering design in estimating
Programmer
Memberships
2006 / W.A. Telecommunications Research Institute
12-week vacation work programme providing Engineers Australia
programming support to a commercial research and Full member since 2010
development project.
Asset Management
Fundamentals
Education Completed November 2011
Construction Safety and
Bachelor of Engineering / Bachelor of Science Awareness
University of Western Australia (CWA: 76.3%) Issued September 2007
Bachelor of Engineering with Honours (Electrical Eng) Microstation V8 Training
Units in power engineering, digital communications and control Completed August 2008
theory.
Australian Driver s
Bachelor of Science (Computer Sci and Applied Maths)
Licence
Units in probability and statistics, quality control and software
Since July 2002
engineering.
Mark Pazolli - ********@*****.*** - 042*-***-***
Mark Pazolli
Highlights Preferences
Work in Western Australia
(happy with FIFO)
Reliability Engineer
International and inter-state
Re-prioritised the 2012/13 Wood Pole Reinforcement
work considered
programme to incorporate pole wear and nearby pole
failures as key factors in the rankings (previously the
programme had only considered fire risk and proximity to
Software
population).
Microsoft Office, Sucess
Developed a Network Reliability Register to track major
Estimator, ArcGIS, SQL,
reliability issues in the network and set-up a process to Apache, VBA, C/C++, Java,
address and manage reliability issues. PHP and .NET
Oversaw management of several reliability projects and
conducted site visits to confirm the projects were
References
completed in accordance with the scope and drawings.
This is a public copy of my
resume as such my references
Construction Manager details are not available.
Established a team of two electricians and an apprentice
I am however happy to provide
to finish off the ARIC replacement project (these were a reference for any of my roles
malfunctioning transformer temperature monitors). This upon request.
included organizing equipment and materials for the
team, conducting initial site surveys at several sites
including Newmont s Boddington Gold Mine and Contact
organizing outages.
********@*****.***
Co-ordinated substation work crews to complete over
Mob: 042*-***-***
twenty asset replacement or minor work projects including
installing 66kV voltage transformers at O Connor and H: 08 9364 5342
Shenton Park; replacing distance relays at Arkana and
W: 08 9326 4619
Scarborough; and installing current transformers at Collier
Park and Durlacher.
Managed construction of a new buszone scheme at
Busselton substation. This was a major project requiring linkedin.com/in/pazollim
over 1,500 man-hours of site labour and involving the
installation of several new pieces of 66 kV switchgear in
combination with substantial panel work. The project
Website
required work on infrastructure that could only be taken
www.pazolli.org
offline in light-load conditions, so I arranged a set of three
night-time outages to systematically offload plant for work
and then restore it to service.
Graduate Engineer
Developed a 55-page design report that detailed how to
connect a new substation in Willetton to Western Power s
optic fibre network. This allowed for the operation of a
digital differential protection scheme.
Simulated, designed and developed drawings to resolve
12 separate power quality issues in the distribution system
over six months. This included one major project installing
a new transformer and rebalancing load in the suburb of
Joondanna.
Mark Pazolli - ********@*****.*** - 042*-***-***