Mark Pazolli

Summary

Experience Electrical power engineer

Five years experience

Reliability Engineer

Seeking new projects to

**** ** **** / ******* ***** broaden my experience as an

engineer

Eighteen months working as a reliability engineer

identifying the cause of faults, proposing solutions and

sponsoring projects to improve the reliability Field experience

performance of the network. Ten months as a construction

manager

Construction Manager plus

2010 / Western Power Seven months assisting a

protection commissioning

Ten months working as a construction manager technician as a graduate

arranging outages, organizing work crews for projects, engineer

arranging procurement and transport of materials to

site, preparing work documentation and resolving

Design experience

site/design issues with engineers.

Six months in distribution design

Graduate Engineer plus

2009 to 2007 / Western Power Six months in

telecommunication design

3-year graduate programme with five rotations in

plus

estimating, system simulation, distribution design,

protection commissioning and telecommunications. Six months of preliminary HV

engineering design in estimating

Programmer

Memberships

2006 / W.A. Telecommunications Research Institute

12-week vacation work programme providing Engineers Australia

programming support to a commercial research and Full member since 2010

development project.

Asset Management

Fundamentals

Education Completed November 2011

Construction Safety and

Bachelor of Engineering / Bachelor of Science Awareness

University of Western Australia (CWA: 76.3%) Issued September 2007

Bachelor of Engineering with Honours (Electrical Eng) Microstation V8 Training

Units in power engineering, digital communications and control Completed August 2008

theory.

Australian Driver s

Bachelor of Science (Computer Sci and Applied Maths)

Licence

Units in probability and statistics, quality control and software

Since July 2002

engineering.

Mark Pazolli - ********@*****.*** - 042*-***-***

Mark Pazolli

Highlights Preferences

Work in Western Australia

(happy with FIFO)

Reliability Engineer

International and inter-state

Re-prioritised the 2012/13 Wood Pole Reinforcement

work considered

programme to incorporate pole wear and nearby pole

failures as key factors in the rankings (previously the

programme had only considered fire risk and proximity to

Software

population).

Microsoft Office, Sucess

Developed a Network Reliability Register to track major

Estimator, ArcGIS, SQL,

reliability issues in the network and set-up a process to Apache, VBA, C/C++, Java,

address and manage reliability issues. PHP and .NET

Oversaw management of several reliability projects and

conducted site visits to confirm the projects were

References

completed in accordance with the scope and drawings.

This is a public copy of my

resume as such my references

Construction Manager details are not available.

Established a team of two electricians and an apprentice

I am however happy to provide

to finish off the ARIC replacement project (these were a reference for any of my roles

malfunctioning transformer temperature monitors). This upon request.

included organizing equipment and materials for the

team, conducting initial site surveys at several sites

including Newmont s Boddington Gold Mine and Contact

organizing outages.

********@*****.***

Co-ordinated substation work crews to complete over

Mob: 042*-***-***

twenty asset replacement or minor work projects including

installing 66kV voltage transformers at O Connor and H: 08 9364 5342

Shenton Park; replacing distance relays at Arkana and

W: 08 9326 4619

Scarborough; and installing current transformers at Collier

Park and Durlacher.

LinkedIn

Managed construction of a new buszone scheme at

Busselton substation. This was a major project requiring linkedin.com/in/pazollim

over 1,500 man-hours of site labour and involving the

installation of several new pieces of 66 kV switchgear in

combination with substantial panel work. The project

Website

required work on infrastructure that could only be taken

www.pazolli.org

offline in light-load conditions, so I arranged a set of three

night-time outages to systematically offload plant for work

and then restore it to service.

Graduate Engineer

Developed a 55-page design report that detailed how to

connect a new substation in Willetton to Western Power s

optic fibre network. This allowed for the operation of a

digital differential protection scheme.

Simulated, designed and developed drawings to resolve

12 separate power quality issues in the distribution system

over six months. This included one major project installing

a new transformer and rebalancing load in the suburb of

Joondanna.