View My VisualCV Online: http://www.visualcv.com/huebner
Volker H bner Recognitions
Technical Specialist
KOSTAL of AMERICA
*** ********** ***. *: +1-248-***-****
Troy, MI 48083 h: +1-248-***-****
United States m: +1-248-***-****
***@*******.**
XING: https://www.xing.com/profile/Volker_Huebner2
Target Oriented - Efficient - Leadership - Multilingual Letter of reference Kostal
Mexico 2009
A german engineer with 12+ years of experience in Mexico, working in the international automotive
business, used to working in an international and multicultural environment, coming from an
automotive design oriented career and developed to an recognized expert for the assembly of
Letter of reference Kostal
mechatronic and electronic products, eagerly focused on process and cost optimizations.
Germany 2000
Searching for an opportunity to apply and to expand the professional skills in a company in the
automotive or similar industry with an international foot print. Interested in making new cultural
experiences in North, Central or South America, Western Europe or Asia.
Work History References
Kostal of America (Superior)
Arnd Becker
Troy, MI, United States Jan 2012 - Present Plant Engineering Manager
Kostal Mexicana S.A. de C.V.
Techinical Specialist for Manufacturing +52-442-*******
**.******@******.***
Kostal Mexicana S.A. de C.V.
Humberto Quintanar
Quer taro, Mexico Apr 2000 - Dec 2011
(Other)
Process Development Manager Operations Manager
Diehl Controls Mexico, S.A. de C.V.
In this position I was responsible for the integration of new projects, the planning of the electronic +52-442-***-****
assembly processes (SMD assembly and subsequent processes) and for the continuous ********.*********@********.***
improvement of the manufacturing processes in the plant. I was in charge of 10 engineers and 1
Former Operations Manager of Kostal
technician.
Mexicana S.A. de C.V.
My main responsibilities were:
(Other)
Holger Lettman
Integration of new production lines, fulfilling the timing and budgeted targets.
Integration of new manufacturing technologies.
Vice President Engineering
Planning of the production capacities for the following years.
Kostal North America
Quotation of new potential projects (manufacturing cost and investments).
Annual budget planning for new projects. *.********@******.***
Periodic verification of the budget plan against the strategic business plan.
Interchange of know-how about new manufacturing and development standards between
Kostal Mexico and the rest of the Kostal group.
In 2008 I initiated and drove a project to reduce the cycle time of the end of line testers in the series
production areas. My goal was a cycle time reduction of 10% and I accomplished an average
reduction of 15%.
I developed several macro based Excel tools to reduce the work load of the planning engineers.
Most of them reduced the administrative time for frequently repeated tasks by more than 90%. For
instance I reduced the time for the capacity planning of standard production equipment, against the
sales forecast, from 3 engineer days to 1 hour.
Page 1 of 4
View My VisualCV Online: http://www.visualcv.com/huebner
By optimizing the processes during the planning and set up phase for new production lines, I
reduced the average duration for this phase from 1 - 1.5 years to 6 - 8 month without increasing the Certificates
headcount.
Diploma Certificate
Due to my technical and leadership skills as well as my target-oriented work style, I was nominated
several times over the last years as the overall project coordinator for strategically all-important
projects. In this function I am responsible for the coordination of all activities in all involved areas
such as production, product design, sales, quality assurance, purchasing and logistics.
Quer taro, Mexico Dec 1997 - Mar 2000
Project and Process Engineer
As a project and process engineer I was responsible for the planning and integration of new projects
as well as for the optimization of the assembly lines in series production regarding productivity,
quality and ergonomics.
My core activities in this position have been:
Elaboration and maintenance of all project and process related documentation such as
project timing plans, process flow charts, lay outs, P-FMEA, work instructions, visual aids
etc.
Certificate "Leadership"
Cost-benefit calculations.
Production cost calculations.
Manufacturing feasibility analysis of new design concepts.
Planning and realization of assembly line transfers from Germany and Spain to Mexico.
Integration of assembly and test equipment.
Initial statistic process control studies for assembly equipment.
Capacity calculations for production equipment.
Process time studies and assembly line balancing
Training of production personnel.
Support in multidisciplinary teams for 8 D, statistic process control (SPC), analysis of
defective products and different teams of continuous improvement.
Certificate "Efective
Leadership"
Education
FH Osnabr ck
Osnabr ck, Germany Mar 1993 - Oct 1997
Engineer (Dipl. Ing.), Mechanical Engineering
From 03/1997 to 10/1997 I worked in Volkswagen Mexico as a trainee. During this time I prepared
my diploma thesis about process improvements in the aluminum die casting area.
Certificate "Hoshin Kanri"
Languages
German: Native-language
Spanish: Business fluent
English: Business fluent
Additional Skills
Leadership and effective leadership.
Design of experiments
5S
Page 2 of 4
View My VisualCV Online: http://www.visualcv.com/huebner
Global 8 D
REFA & MTM
Lean manufacturing
Certificate "Global 8 D"
Kanban
Hoshin Kanri
SAP (basic)
MS Office (advanced)
Planning and control of production
ISO 9001 & ISO/TS-16949
ISO-14001
Organizational culture
Implementation of competencies
Certificate "Formel Q"
Certificate "Cost Benefit"
Certificate "Kanban"
Page 3 of 4
View My VisualCV Online: http://www.visualcv.com/huebner
Certificate "REFA"
Certificate "Production
Planning"
Certificate
"Competencies and
strategic planning"
Certificate "Selection by
competencies"
This next-generation resume was created using VisualCV
Page 4 of 4