Construction Manager
Specialty/Skills: Excell, Word, Power Point
Geographic Location Preference: Any Location
Salary Range Desired:
Work Status: Authorized
Willing to relocate: Yes
Term of Employment: FullTime
Work Experience: SeniorLevel
Education: HighSchool
Eric Dellinger
Address: 10 Shady Hollow Ln.
City: Greer, SC
State: AL
ZIP Code: 29651
Country: US
Phone (home): 843-***-****
Phone (work): 843-***-****
Fax:
: ***************@*****.***
:
Eric L. Dellinger
10 Shady Hollow Ln.
Greer, South Carolina 29615
843-***-**** (cell)
***************@*****.***
Experience Summary:
Construction Management and Supervision, Project Controls, Field
Engineering, Trainer and Training Coordinator, MEP Coordination,
Safety Manager, QC/QA
Education: Eastside High School, Greenville, S.C. Graduated 1978
Greenville Technical College- Drafting and Blue Print reading
Graduated 1980
Quick Pen Auto Bid Mechanical Estimating Training 2004
Employment History:
3/12 to 7/12: Fluor Corp., Greenville, SC Commissioning Team Trainer
and Training Coordinator.
Mining
Project: Oyu Tolgoi Copper Mine, South Gobi Desert, Mongolia
Job Scope: Trainer and Coordination of on-site training for the
Commissioning Team, Maintenance and Operations Groups, Contractors and
Vendors. Duties also included but not limited to creating and updating
training tracking matrixes. Pre-Commissioning Training and working
with our Project Team Mongolian Translators with the difficulties and
differences encountered with the English to Mongolian translation.
Actively participated in Mechanical and QSI (Quality and Safety
Interaction) walk downs.
8/11 to 3/12: Utt Construction Company, Raleigh, NC- Construction Manager
Pharmaceutical
Project: Merck Pharmaceutical - Varicella Bulk Expansion, Durham, NC
Value: 2 Million
Job Scope: GC over wall, floor and ceiling installation subcontractors
Duties: Coordination Manager between UTT Co. Subcontractors and Jacobs
Engineering Subcontractors, Quality Control, RFI Manager and Safety
3/11 to 8/11: Utt Construction Company, Raleigh, NC- Construction Manager
Project: Banner Pharmacaps PCA Expansion Suite High Point, NC
Value: 2 Million
Job Scope: Managing all site construction activities.
Duties: Demolition coordination, steel erection, installation of
utilities, walls and ceilings, equipment, QC/QA and Safety.
9/10 to 3/11: Global Performance, Greenville, SC- Mechanical Coordinator
Manufacturing
Project: Boeing Interiors Facility (IRC) Ladson, SC
Value: $ 75 Million
Job Scope: Managing and coordinating all HVAC and Piping Systems
including equipment.
Duties: Engineering Review, Value Engineering, Site utility
coordination with local utilities, Interaction with local Fire
District Officials, QC/QA and Safety
9/09 to 9/10: Utt Construction Company, Raleigh, NC- Construction Manager
Pharmaceutical
Project: GlaxoSmithKline-Office Renovation and Small Capital Projects,
Aiken, SC
Value: $10 million
Job Scope: Responsible for all on site construction activities.
Duties: Construction Management, Cost Control, Estimating & Value
Engineering
Additional duties: To research and start the process of packaging
capital projects and taking them through the client review and
approval process
1/09 to 9/09: Topps Mechanical Inc., Tecumseh, NE- Engineering Manager
Power
Whelan Energy Center, Hastings, NE
Project: New Unit #2 Coal Fired Power Plant Installation
Value: 32 Million
Job Scope: Piping and Instrumentation installation for new Power
Station Addition and Support Buildings.
Duties: Responsible for all Construction Coordination between TMI and
Black &Veatch, build piping installation packages and track progress,
Manage walk down and turn over packages, RFI System Manager, Quality
Control Manager, Project Controls, Cost Engineering and Estimating.
Note: Due to the economic slowdown Global Performance did not have a
project for me to go to once the Koch Nitrogen Project was completed.
Upon completing my project with Global Performance I accepted a
temporary offer from Topps Mechanical for a short Project in Hastings, NE
9/07 to 1/09: Global Performance, Greenville, SC- Construction Manager
Chemical
Koch Nitrogen, Enid, Oklahoma
Project: Urea Synthesis Area Upgrade and Turnaround
Value: 70 Million
Job Scope: Piping and Equipment Installation Coordination.
Duties: Responsible for all construction activities, Pre-bid
coordination activities,
Coordinate the building of construction work packages and manhour
estimates.
Mining
Chemical Lime, Clifton, Texas
Project: Solid Fuel Firing System Kiln #3
Value: 8 Million
Job Scope: Responsible for all construction activities and coordination.
Duties: Change order and RFI review and approval, MEP Coordinator,
Quality Control, Pre-commissioning and Site Safety Enforcement.
12/06 to 9/07: Utt Construction Company, Raleigh, NC- Construction Manager
Food
ConAgra Snack Foods, Garner, NC
Project: Phase Two Slim Jim Pack Hall Equipment Upgrade Installation
Value: 15 Million
Project: Penrose Pickled Sausage Jar and Tiromat Line Equipment
Installation
Value: 3 Million
Project: Direct Blend & Co-Ex Automation Upgrade for Slim Jim
Manufacturing
Value: 40 Million
Job Scope: Responsible for all construction activities and coordination.
Duties: Demolition Coordinator, Equipment installation and
verification, Punch List Manager, Equipment Commissioning, Quality
Control and Safety Representative.
11/05 to 12/06: Yonkers Industries, Cary, NC- Project General
Superintendent
Commercial
Project: Bald Head Island Club House Renovation, Bald Head Island, NC
Value: 5.8 million
Job Scope: Responsible for all on site demolition and construction
coordination.
Duties: Pre-construction, including schedule and constructability
review, bid package scope writing, bid review, demolition
coordination, layout, control of site material deliveries due to
limited space and changing barge schedule due to weather conditions.
Additional note: This project is exceptionally difficult due to
ongoing activities around the clubhouse.
10/05 to 11/05: Fluor Government Group, Baton Rouge, La.
Government
Site Project Manager
Project: Hurricane Katrina FEMA Disaster Relief
Job Scope: Responsible for all on site coordination in remote FEMA
Relocation projects in and around the state of Louisiana.
Duties: Site utility set-up, contractor coordination, shipping
logistics, quality control, FEMA Site Representative, Safety Manager.
Note: During this time I was on L.O.A. from my current employer
Yonkers Industries.
8/04 to 9/05: Yonkers Industries, Cary, NC- Project Superintendent
Pharmaceutical
Value: $40 million
Project: GlaxoSmithKline-Gemini Project, Aiken, SC
Job Scope: Responsible for all on site construction activities.
Duties: Pre-construction and start-up coordination, bid package
process and review, submittal review, scope writing, MEP coordination
between subcontractors and engineering.
Additional duties: Weekly subcontractor coordination meetings, pay
application process, invoice approval review and Safety Manager.
8/03 to 7/04: Suitt Construction Co., Greenville, SC- Hygienic Piping
Superintendent
Pharmaceutical
Value: $726 million
Project: Eli Lilly Corp., Manassas Va.-Bulk Insulin Turbo Pen
Packaging Facility
Job Scope: Responsible for all activities involving Hygienic Piping
and Equipment.
Duties: Bid process, including pre-bid thru bid analysis and award,
Constructability
Review, Equipment delivery schedule, Contractor progress reviews,
Contractor coordination, QC-QA and Safety Coordination.
Project was put on hold after one year due to client funding and
market demand.
7/02 to 8/03: Fluor/ADP Marshall, Rumford RI- Hygienic Piping
Superintendent
Pharmaceutical
Value: $380 million
Project: Amgen Bio Manufacturing Corp., W. Greenwich RI.- Enbrel
Expansion Project.
Job Scope: Responsible for all activities involving Hygienic Piping
and Equipment.
Responsibilities: Contractor coordination-insuring contractors stay
within issued for construction specifications, engineering guidelines,
upholds (GMP) Good Manufacturing Practices and Build Clean Protocol.
6/02 to 7/02: Fluor, Greenville, SC-MEP Coordinator
Pharmaceutical
Project: Wyeth Pharmaceutical Corp., Marietta Pa.- Pneumococcal/
Meningococcal Vaccines Project Upgrade.
Job Scope: Construction activities coordination between client and
contractors.
Responsibilities also include reviewing engineering packages for
constructability and safety coordination.
Due to client funding this project did not develop.
12/00 to 6/02: Fluor, Greenville, SC-Construction Support Engineer II
Pharmaceutical
Project: Eli Lilly Corp., Indianapolis IN.- Bldg.130 Insulin
production increase retrofit.
Job Scope: Field Engineer responsible for piping systems.
Responsibilities also include
Design, trouble shooting, field supervision.
8/98 to 12/00: Bayer Corp., Charleston, S.C.- Senior Piping Designer.
5/98 to 8/98: Wink Engineering, Inc., New Orleans, LA.- Senior Piping
Designer.
10/97 to 5/98: Fluor Daniel, Greenville, SC-Field Engineer
8/97 to 10/97: Day & Zimmerman, Charlotte, NC-Lead Piping Designer.
6/96 to 8/97: Fluor Daniel, Greenville, SC-Senior Piping Designer.
4/90 to 6/96: Bayer, Charleston, SC -- Senior Piping Designer.
4/87 - 4/90: Fluor Daniel, Greenville, SC - Lead Piping Designer.
9/78 4/87: CRS Sirrine, Greenville, S.C. Piping Designer and Model
Technician