Telecom Implementation Engineer
Resume keywords summary: Telecom Implementation Engineer for Nokia,Ericsson,Huawei
Please log in to see the contact information!
Work Experience
Experience level: 2-5 years
Profile/Cover Letter: S.MURUGAN
Mobile: +971*********
Email:abp90i@r.postjobfree.com
To serve and add value to your organization that provides an opportunity to gain further exposure, experience and Career Growth by utilizing my potential to the fullest
Summary
Around 5 years of experience in Telecommunication Field. Strong knowledge of GSM & WCDMA concepts. Hands on Experience with Nokia Flexi BTS, Nokia Flexi WBTS, Ultra BTS, Nokia AXC, Nokia Flexi hopper 19 Equipments. Currently working for Hayat Communication as a Telecom Implementation Engineer from May 2009. Proven track record of overachieving assigned targets, excellent relationship management skills and able to work with Team. Skilled communicator with exceptional interpersonal skills and proven organizational abilities.
Experience Summary
Working as Telecom Implementation Engineer for Hayat Communication, Dubai, UAE
Worked as Telecom Implementation Engineer for TCIL, Saudi Arabia
Worked as FLM Engineer for Kelly service India Pvt Ltd, Chennai, India
Worked as BSS Engineer for AIRCEL Ltd, Salem, India
Employment Graph with Noteworthy Milestones
Hayat Communication, Dubai, UAE
Job Title: Telecom Implementation Engineer
Duration: May 2009 Till date
Vendors: Nokia Siemens Networks (DU Project)
Installation, Commissioning and Integration of Nokia Flexi WBTS 2100 MHz
1+1+1 configuration.
Installation, Commissioning and Integration of Nokia Flexi BTS 900, 1800 MHz
2+2+2 to 6+6+6 configuration.
Installation, Commissioning and Integration of Nokia Ultra BTS 900, 1800 MHz
2+2+2 to 6+6+6 configuration.
Installation and Commissioning of Nokia AXC, Flexi hopper 19
Installation and Commissioning of Nokia Flexi EDGE FIFA, Flexi WCDMA FTFA.
Hob upgradation from Flexi hopper 19,FXC RRI to Flexi AXC
Working Experience of Up gradation of Transmission media.(2*2 to 4*2 to 8*2 to 16*2 mbps)
XLM file loading and editing for Nokia Flexi WBTS.
Doing LOS survey for new sites
Perform antenna and feeder test using Anritsu Site Master.
Performs call testing in all time slots, fault isolation and alarm troubleshooting on newly
Integrated and existing Cell Site BTS.
Analyzing & rectifying the Microwave misalignment problems with correct RX LEVEL
Analyzing of BTS VSWR alarms reported at BTS, which includes identifying and replacing of faulty connectors and feeder line.
BTS Expansion, Various configuration and migration of sites from BSC to BSC
Did new site PAT and handover to vandor
migration of sites from BSC to BSC
1. TCIL, Riyadh, Saudi Arabia
Job Title: Telecom Implementation Engineer
Duration: June 2008 to April 2009
Client: Nokia Siemens Networks (STC Project)
Commissioning, Operation & maintenances activities in Nokia Ultra BTS,
Flexi EDGE BTS & Flexi WCDMA BTS (900, 1800, 2100)
Commissioning, Operation & maintenances activities in Flexi transmission unit FIFA, (Flexi EDGE BTS), FTFA (Flexi WCDMA BTS)
Installation and Commissioning of Nokia Flexi hopper, 7GHz,15GHz,23GHz, 38GHz Microwave
Commissioning, Operation & maintenances activities in NEC STM1 & PDH Level 7GHz,15GHz,23GHz, 38GHz Microwave
O&M activity and E1 Provisioning in Nokia Flexi hopper
AT test conducting for Nokia Flexi BTS, Node B, Flexi hopper and RRI Card Microwave
Implemented Chain, Loop & Cascading E1 s in Nokia Hub.
XLM file loading and editing for Nokia Flexi WCDMA BTS
E1 addition to the existing Nokia Flexi WCDMA BTS sites
Doing LOS survey for new sites
BTS Expansion, Various configuration and migration of sites from BSC to BSC
Commissioning and maintenance of Siemens SRA4 Microwave
Link software upgrade in SRA4 Microwave
Link capacity up gradation of SRA4 Microwave
E1 Provisioning for new Node B and 2G sites and E1 END to END test
Co-Ordination with NOC while breakdown maintenance.
Fault analyzing and Trouble shooting
Site planning for implementation of SDH Multiplexer according to the requirement of E1 dropping capacity in BSC & Site locations
Performs call testing in all time slots, fault isolation and alarm troubleshooting on newly integrated and existing Cell Site BTS.
Analyzing & rectifying the Microwave misalignment problems with correct RX LEVEL
Involved in Tower climbing and replacements of ODU during the time of outage
Analyzing of BTS VSWR alarms reported at BTS, which includes identifying and replacing of faulty connectors and feeder line
1. Kelly service, Chennai, India
Job Title: FLM Engineer
Duration: January 2006 May 2008
Client: Nokia Siemens Networks (Vodafone Eassar South Limited) Chennai
Commissioning and Operation & maintenance activities in Nokia Intra and Ultra (indoor, outdoor) BTS
Commissioning and Operation & maintenance activities in Nokia Flexi BTS
Commissioning and Integration of Metro Hubs implemented loop protection.
Operation & maintenance activity and E1 Provisioning in Nokia Flexi hopper,
Installation and Commissioning Nokia Flexi hopper, 7GHz,15GHz,23GHz, Microwave
Commissioning, Operation & maintenance of Ultra transmission unit RRI card (Ultra EDGE BTS),Flexi transmission unit FIFA(Flexi EDGE BTS)
Implemented Chain, Loop & Cascading E1 s in Nokia Hub
Commissioning, Operation & maintenance activities NEC STM1 Level 7GHz,15GHz,23GHz Microwave
Handling and maintenance of NEC NMS
Handling and maintenance of ECI NMS
Commissioning and maintenance of ECI Optical & Electrical STM 1 Level BG20, BG40, eECI Mux
Software up gradation, decommissioning and hop up gradation of Nokia Flexi hopper, RRI Card and FIFA.
Commissioning and maintenance of Siemens SRA4 Microwave
A interface routing from Trans coder to BSC
Nokia Hardware configuration through hardware configuration tool.
Co-Ordination with NOC while breakdown maintenance.
AT test conducting for Nokia BTS and Microwave
Fault analyzing and Trouble shooting
BTS Expansion, Various configuration and migration of sites from BSC to BSC
Performs call testing in all time slots, fault isolation and alarm troubleshooting on newly integrated and existing Cell Site BTS.
Good Knowledge of signaling concepts
Change out of PDH LINK to SDH LINK
Perform antenna and feeder test using Anritsu Site Master.
Analyzing and troubleshooting of BTS External alarms reported at network operation center (NOC), which includes identifying and Rectify the faulty unit.
Analyzing of BTS VSWR alarms reported at BTS, which includes identifying and replacing of faulty connectors and feeder line
2. AIRCEL Ltd, Salem
Job Title: BSS Engineer (Ericsson Equipment)
Duration: May 2004 June 2006
Role: Ericsson O&M (BTS and Transport)
Commissioning of Ericsson BTS s (RBS2202, 2204, 2206, 2111 & 2954) & IBS (2308) using OMT software(s).
Working Experience of Expansion of BTS. (Type with Sync Cable and without sync Cable)
Working Experience of Up gradation of Transmission media.(2*2 to 4*2 to 8*2 to 16*2 mbps)
Installed and Commissioned Microwave Transmission of Minilink (Ericsson) E, Traffic Node (TN-1 & TN-3) as well as High-Capacity (STM-1 M/W links).
Working Experience of High Cap Transmission System (DXX 6320, 6310).
Working Experience of Traffic Node 20p an Ericsson transmission media mapping solution. And worked for traffic shifting from E-Micro to TN
Indoor/Outdoor Repeater Installation and fault rectification.
Capacity enhancement through TRU and BTS addition through expansion.
Monitoring of cell sites through software like Win foil and citric.
Microwave Transmission (Minilink-E) - Link alignments and maintaining Netman connectivity for remote monitoring through NCC, RAC and EAC connections. Using Minilink Service Manager (6.0, 6.3, 6.4 &6.5) software for installing, maintaining and monitoring.
Integration and testing of BTS external alarms on DG panels, PIU (Acme) as well as SMPS s.
Analyzing and troubleshooting of BTS alarms reported at network operation center (NOC), which includes identifying and replacing of faulty magazine
Performed three major Site Migration (Inter BSC and Inter MSC both ).
Cascading of Dual band (GSM1800 & GSM900) BTS.
Loading of Hardware, OAM and Software Scripts to Ericsson
EDGE implementation in various Ericssion BTS
SDH (Microwave) - FRX & FLX 150/600 in STM 1 Level (FUJITSU OPTEL LIMITED - JAPAN)
Working Experience of E1 transmission via Microwave and Fiber media from BSC to BTS s.
E1 Provisioned for new BTS, Inter MSCs in PDH & SDH
RND survey for new sites
Heading the transmission group for Phase IV, V-A, V-B project and planning execution of activities within a stipulated time frame
Fault analysing, Trouble shooting, Quality Checking & Acceptance test for newly commissioned sites in co ordination with Vendor.
Perform antenna and feeder test using Anritsu Site Master
Rectification of hardware and software problems in coordination with Ericsson..
Equipments Handled
Using Garmin nuvi205 model GBS
E1 Tester-Sunset, Acterna type.
Analyser-Agilent (SDH-STM1-16 level)
VSWR-Site Master (ANRITSU and BIRD).
Power and Source Meter.
Drive Testing Kit (TEMS and Agilent)
Software tools
FLEXER Software for operation and maintenance of Fujitsu radio and Multiplexed Equipments (Microwave)
Nokia BTS Manager, Metro Hub Manager, Flexi EDGE BTS Manager, Nokia node B
Flexi Hopper Software for Operation and maintenance of Nokia Microwave systems
MINI-LINK Craft, MINI-LINK TN-HC, Bullet-ProofFTP Software for operation and maintenance of Ericsson Systems
MSM, MNM Software for operation & maintenance of Ericsson systems.
OMT19_2 up to OMT34_9 Software for operation & maintenance of Ericsson systems.
Local Craft Terminal version 6.5- Software for operation & maintenance of siemens system
Map info 5.5, 6.5 Software
Professional Trainings
Training on Nokia Ultra BTS,Flexi BTS and Flexi Hoper
Training on installation and verification of Ericsson RBS3000-UMTS
Training on Mini-link equipments
Training on Ericsson Traffic node
Training on RBS 2202/2206/2204/2104 equipments
Training on Fujitsu SDH equipments.
Training on STM 16(OFC ECI Equipment)
Training on Minilink high capacity
Educational Credentials
Doing Final year BE in Electronics and Communication Engineering, Vinayaka mission University, Salem.
Diploma in Electronics and communication Engineering, Rama Seethe polytechnic
Kariyapatti.
Personal Profile
Father Name : Shanmugaiah.C
Date of Birth : 16tH Marth 1982
Nationality : Indian
Marital Status : Single
Languages : Tamil and English
Address : 65/ Loyal mill colony,
Kovilpatti 628501,
Tuticorin Dist - 628 907.
TamilNadu.india.
Passport Details
Pass port Number : G7222827
Place of issue : Madurai
Year of Issue : 2008
Year of Expiry : 2018
Declaration: I hereby declare that the information furnished above is true to the best of my knowledge.
Place: Saudi Arabia
Date: (Murugan.Shanmugaiah)
No submited work experiences
Background and Experience
No submited educations
Languages
No submited languages
Job Preferences
Job Category: 3g RF Design WCDMA UMTS Job
Job Type: Any Job Type
Job Status: Flexible
Desired Salary: $0 Unspecified
Desired Location: Not Specified
Willing to Relocate: No