Post Job Free
Sign in

Engineer Project

Location:
Roselle, NJ
Posted:
December 18, 2012

Contact this candidate

Resume:

Charlene Almase

Email: *********@********.***

Address: *** ******** *******

City: Roselle

State: NJ

Zip: 07203

Country: USA

Phone: 732-***-****

Skill Level: Experienced

Salary Range: $77,000

Willing to Relocate

Primary Skills/Experience:

See Resume

Educational Background:

See Resume

Job History / Details:

Charlene D. Almase

702 Franklin Terrace, Roselle, NJ 07203

Phone: 732-***-**** Email: *********@********.***

Transportation Engineer

I am a highly motivated individual with over 6 years experience seeking a full time Civil Engineering position

with a successful engineering firm. I am an excellent communicator that works well with a team to produce

quality work. I am a quick learner that is able to see projects from start to finish, holding a clear and

concise vision to create an exceptional product for the client.

Education

Rutgers University - School of Engineering, New Brunswick, NJ (9/2000 - 5/2005)

Bachelor of Science in Civil Engineering

Work History

Dewberry - Bloomfield, NJ (6/2005 -

4/2012)

Transportation Engineer

* Organize and set daily tasks to meet project deadlines

* Proficient in Microstation CAD v8.XM, InRoads Software v8.XM, AutoTurn 5.0, and Microsoft Office

Applications

* Task leader to newer engineers

* Familiar and experienced with NJDOT Highway Design Manual and GSP/NJTA Standards

* Experienced in horizontal and vertical geometry, superelevation and vertical clearance calculations,

cross sections, grading, and plan preparation.

I-295/I-76/Route 42 Direct Connection

* Designed horizontal geometry for I-76 to reduce drainage and environmental impacts by placing Load

Transfer Mats on cross sections to analyze further Traffic Control Efforts

* Designed proposed I-76 for future traffic control design by analyzing cross sections, horizontal, and

vertical geometry.

* Collaborated with Mt. Laurel office to finalize and complete design in order to meet deadlines

* Designed vertical clearances of side roads, ramps, and mainline to meet design restrictions and NJDOT

Standards

* Calculated superelevations, grading, vertical alignments, and horizontal impacts for Temporary Ramps, I-

295, and I-76 by laying out alignments in CAD, coordinating with the NJDOT Manual, and using InRoads Roadway

Designer

I-80/I-287 Interchange Roadway Improvements

* In charge of quantity takeoffs for Mainline and Ramps

* Delegated quantities to newer engineers to prepare for the Estimate Sheet and Earthwork Summary

* Compiled the necessary information and documents to prepare Construction Plans by coordinating with team,

drafters, and project managers

* Drafted and prepared construction plans for CAD Technicians according to NJDOT Standards

* Utilized Specifications to complete and check quantities and as detailed information corresponding to

project plans

Route 7 Wittpenn Bridge

* In charge of quantity takeoffs for Fish House Rd. and Rt. 7 to complete Estimate and Earthwork Summary

sheet.

* Went on field visits to locate existing utilities, driveways, and pipes to help with horizontal geometry

of a proposed driveway.

* Used AutoTURN 5.0 to design turning movements for a proposed driveway and various side roads to meet

NJDOT Manual Standards

* Compiled the necessary data and documents to prepare Construction Plans by coordinating with team,

drafters, and project managers

* Drafted and prepared construction plans for CAD Technicians according to NJDOT Standards

* Utilized Specifications to complete and check quantities and as detailed information corresponding to

project plans

Route 206 Bypass

* Designed horizontal geometry for Existing Rt. 206 Mainline to meet ROW restrictions using Microstation

and NJDOT Manual

* Used existing horizontal alignments of Rt. 206, Amwell Rd., and Hillsborough Rd. to design proposed

roadway alignments

* Designed Intersection for Hillsborough Rd. and Rt. 206 using NJDOT Manual and AutoTurn

* Calculated vertical clearances and superelevations of side roads, ramps, and mainline to meet design

restrictions and NJDOT Standards

* Learned and Utilized the latest version of InRoads to design cross sections for all roadways

* Prepared and calculated quantities to complete Estimate and Earthwork Summary Sheet

Widening of the Garden State Parkway - Section 2 MP 70-MP 75

* Designed horizontal and vertical geometry to widen a 5 mile stretch of the parkway using GSP/NJTA

Standards

* Prepared quantities and cost estimates

* Designed and calculated superelevation and cross sections with InRoads