Charlene D. Almase
702 Franklin Terrace, Roselle, NJ 07203
Phone: 732-***-**** Email: *********@********.***
Transportation Engineer
I am a highly motivated individual with over 6 years experience seeking a full time Civil Engineering position
with a successful engineering firm. I am an excellent communicator that works well with a team to produce
quality work. I am a quick learner that is able to see projects from start to finish, holding a clear and
concise vision to create an exceptional product for the client.
Education
Rutgers University - School of Engineering, New Brunswick, NJ (9/2000 - 5/2005)
Bachelor of Science in Civil Engineering
Work History
Dewberry - Bloomfield, NJ (6/2005 -
4/2012)
Transportation Engineer
* Organize and set daily tasks to meet project deadlines
* Proficient in Microstation CAD v8.XM, InRoads Software v8.XM, AutoTurn 5.0, and Microsoft Office
Applications
* Task leader to newer engineers
* Familiar and experienced with NJDOT Highway Design Manual and GSP/NJTA Standards
* Experienced in horizontal and vertical geometry, superelevation and vertical clearance calculations,
cross sections, grading, and plan preparation.
I-295/I-76/Route 42 Direct Connection
* Designed horizontal geometry for I-76 to reduce drainage and environmental impacts by placing Load
Transfer Mats on cross sections to analyze further Traffic Control Efforts
* Designed proposed I-76 for future traffic control design by analyzing cross sections, horizontal, and
vertical geometry.
* Collaborated with Mt. Laurel office to finalize and complete design in order to meet deadlines
* Designed vertical clearances of side roads, ramps, and mainline to meet design restrictions and NJDOT
Standards
* Calculated superelevations, grading, vertical alignments, and horizontal impacts for Temporary Ramps, I-
295, and I-76 by laying out alignments in CAD, coordinating with the NJDOT Manual, and using InRoads Roadway
Designer
I-80/I-287 Interchange Roadway Improvements
* In charge of quantity takeoffs for Mainline and Ramps
* Delegated quantities to newer engineers to prepare for the Estimate Sheet and Earthwork Summary
* Compiled the necessary information and documents to prepare Construction Plans by coordinating with team,
drafters, and project managers
* Drafted and prepared construction plans for CAD Technicians according to NJDOT Standards
* Utilized Specifications to complete and check quantities and as detailed information corresponding to
project plans
Route 7 Wittpenn Bridge
* In charge of quantity takeoffs for Fish House Rd. and Rt. 7 to complete Estimate and Earthwork Summary
sheet.
* Went on field visits to locate existing utilities, driveways, and pipes to help with horizontal geometry
of a proposed driveway.
* Used AutoTURN 5.0 to design turning movements for a proposed driveway and various side roads to meet
NJDOT Manual Standards
* Compiled the necessary data and documents to prepare Construction Plans by coordinating with team,
drafters, and project managers
* Drafted and prepared construction plans for CAD Technicians according to NJDOT Standards
* Utilized Specifications to complete and check quantities and as detailed information corresponding to
project plans
Route 206 Bypass
* Designed horizontal geometry for Existing Rt. 206 Mainline to meet ROW restrictions using Microstation
and NJDOT Manual
* Used existing horizontal alignments of Rt. 206, Amwell Rd., and Hillsborough Rd. to design proposed
roadway alignments
* Designed Intersection for Hillsborough Rd. and Rt. 206 using NJDOT Manual and AutoTurn
* Calculated vertical clearances and superelevations of side roads, ramps, and mainline to meet design
restrictions and NJDOT Standards
* Learned and Utilized the latest version of InRoads to design cross sections for all roadways
* Prepared and calculated quantities to complete Estimate and Earthwork Summary Sheet
Widening of the Garden State Parkway - Section 2 MP 70-MP 75
* Designed horizontal and vertical geometry to widen a 5 mile stretch of the parkway using GSP/NJTA
Standards
* Prepared quantities and cost estimates
* Designed and calculated superelevation and cross sections with InRoads
Note: Preparing for EIT exam in 2013. Preparing for PE in 2014.