Mark's InformationLocation: Beaver Falls, PAExperience: 3-6 yearsWork Types:
Willing to Relocate: NoWilling to Travel: Do not mind travellingCareer Level: Entry LevelWork Status: U.S. CitizenMember Since: 2010-02-05 Helpful Links
-->
1
MARK D. SALANSKY
816 13th Street
Beaver falls,
# 1-
Cell phone# 1-
abozzd@r.postjobfree.com
Objective To obtain a technical position with opportunity for growth into advanced positions
WEXFORD HOUSE
April 2009 to June 2009
9850 Old Perry Highway, Wexford, Pennsylvania
Course of study was Nursing Assistant
Received 120 hours of class time
Obtained Certificate of Completion
ITT TECHNICAL INSTITUTE
June 2004 to June 2006
Parkway Center Mall, Green tree, Pennsylvania
Course of study was Software Applications, and Programming
Languages of study were Visual Basic, C++, HTML, and SQL
Software Applications of study were Word, Excel, Power Point, Access, and GUI
Obtained Credits
Education
Washington Institute of Technology
March 1986 to October 1987
82 South Main Street, Washington, Pennsylvania 15301
Course of study was Electronics and Computer Technology
Languages of study were Basic, Cobol, Fortran, Dos and Machine language
Obtained an Associate Degree in Specialized Technology
Burgettstown Jr. Sr. High School
September 1979 to June 1985
Burgettstown Pennsylvania
Course of study was General
Diploma received
School activities included ski club and B.A.A.
Work Experience
WEXFORD HOUSE
APRIL 2009 to AUGUST 2009
Performed Temperature, Pulse, and Respirations on residents
Took blood pressures
Assisted with resident ADL's
Changed and turned residents
Performed Catheter care
Measured input/output and monitored equipment
HAEMONETICS CORP.
JANUARY 2007 to FEBUARY 2009.
Ran all assembly machines in Automation and manual Dept
Worked in Clean stream putting cores into bowls
Ran seal ring machine and assembled them by hand
Helped Molders inspect bowls coming off molding machine
Worked in Packing putting finished product in boxes
Retested rejected bowls from machine
CHICK WORKHOLDING SOLUTIONS
SEPTEMBER 2005 to OCTOBER 2006
Inventory of all product in shipping area
Made and packed boxes according to orders
Assembled all work holding packages
Write up paperwork for international orders
Sweep and mop floors
Run, and load CNC Machines
Cut raw ferrous materials on band saw
MSA CORPORATION
OCTOBER 2004 to JUNE 2005
Soldered wires to battery terminals in transmitters and receivers
Pressure tested transducers and transmitters
Function tested receivers for proper LED sequence
Glued battery terminal wires on transmitters and receivers to make a water tight seal
THERMO SHANDON
SEPTEMBER 1997 to APRIL 2000
Bagging and packaging of cytofunnels
Moved completed skids of cytofunnels into shipping dept. using forklift
Stocked shelves and assembled boxes for cytofunnels
Running spot welding machine to place filters on bottom of cytofunnels
Worked in shipping dept. pulled orders, and identified boxes with proper labeling