Post Job Free
Sign in

Project Engineer

Location:
Houston, TX
Posted:
October 14, 2012

Contact this candidate

Resume:

Posted/Modified

on: **/**/**** **:** PDT

Title:

CHRIS SPECK 2012

e-mail:

********@*****.***

Phone:

713-***-****

Industry:

PETRO-CHEM/OIL & GAS

Desired

Location:

HOUSTON,TX

Willing

to Relocate:

No

Desired

Salary:

> $105,001/yr

Chris Speck

406 Yorkshire Ct

Deer Park, TX. 77536

Cell 713-***-****

SUMMARY

Field construction professional with 21 years petrochemical industry experience. Pipe fabrication emphasis with responsibilities ranging from foreman, superintendent and supervisory roles handling material controls and receiving, installation, walk downs, construction, turnaround executions and shop surveillance.

H.B. ZACHRY (Texas City) July 2011- Present

Planner / Scheduler

? On site at BP America in Texas City, TX.

? Build and maintain planning/schedules for construction readiness activities for Tank TAR

? Update and maintain a daily schedule and 4 week look heads in SAP and Primavera P6

? Procure materials using an SAP program, while maintaining estimated cost

? Ensure all activities are ready for progression in work order upload (Primavera)

? Facilitate planning meetings for strategic planning of next days activities

? Upload schedules on a daily basis to plant shared site for review

? Coordinate activities with contractors and sub contractor.

JACOBS ENGINEERING / AUSTIN IND (Baytown, TX) September 2009 ? July 2011

Maintenance Coordinator / Planner

? On site at Bayer Corporation in Baytown, TX

? Prioritizes work list and ensure work priorities are aligned with objectives.

? Review work list and scope of work with Engineering and Operations.

? Monitors material, resources and equipment needs.

? Monitor crew craftsmanship on a continuing basis

? Review scope of work with craft supervisors

? Monitors and submit cost changes for approval, and coordinate execution of scope changes

? Planning and Scheduling within SAP and Microsoft Programs

AUSTIN INDUSTRIAL (Houston, TX) November 2008 ? August 2009

Project Leader

? On site at Baker Petrolite in Pasadena, TX

? Oversee and maintain cost controls and RFI program

? Develop weekly meeting reports for the client on the status of project activities.

? Ensure quality and consistency of craftsmanship in all crafts.

? Monitor scope, schedule and work in progress to ensure project plans are implemented effectively.

? Assist in the development and implementation of strategic plans related to project activities.

? Provide input to craft supervision and project scheduling for development of schedules and work plans.

? Planning and Scheduling within SAP and Microsoft Programs

CDI ENGINEERING (Houston, TX) October 2007 ? October 2008

Field Engineer / Procurement Coordinator

? On site with Huntsman in Geismar, LA

? Provide on-site engineering expertise and liaison with home office

? Technical focus is on civil, structural, foundations and pipe fabrication

? Ensure the responses to subcontractor RFI?s are timely

? Maintain the RFI/NCR program

? Design work as delegated by client Project Engineer

? Ensure the material integrity and traceability for any project

Supervise construction to ensure safety, productivity and constructability

? Planning and Scheduling within SAP and Microsoft Programs

KILGORE MECHANICAL (Houston, TX) June 2005 ? October 2007

Field Superintendent

? Organized and coordinated the work of craft employees on construction projects.

? Kept cost records on work performed and materials.

? Responsible for the control of costs in materials and wages.

? Performed exercises control over rate of construction progress in order to complete construction project within time limits.

? Inspected construction work to enforce conformity to specifications

? Supervised craft supervisors, clerical staff, and other personnel employed in construction work.

C-AIR-S MECHANICAL (Houston, TX) June 2003 ? January 2005

Pipefitter Mechanical Supervisor

? Supervised craft personnel, Procured and coordinated deliverables.

? Oversaw installation of all mechanical processes including copper, galvanized pipe, threaded, steam and other systems including ventilation, hydraulics, instrumentation, chemicals and fuels.

IKON SAFETY SERVICES (Pasadena, TX) June 2002-August 2003 Safety Coordinator (Kinder/Morgan Pipeline Company)

? Issued Safety permits

? Safety audits

? Safety inspections

? Inspected and prevent inadvertent and hazardous operations.

? Inspected fire and safety equipment.

? Conducted safety meetings.

? Implemented client safety programs

JOHNSON ENGINEERING (Houston, TX) January 2001 ? August 2002

Fabrication Tech (NASA Johnson Space Center)

? Supported NASA engineering

? Designed and built mock ups from the Space Station for Astronaut training.

? Performed diving for underwater maintenance on mock ups and Astronaut assistance.

EDUCATION

Baytown Lee College

Piping 1, Piping 2, Welding 1

San Jacinto Junior College

Piping Design 1

AutoCAD Release 14

Advanced Piping Design (with Microstation)

Alvin Community College

Associates Degree (General Studies)

SKILLS

Fluent in reading and designing within the following area

Pipe Fitting Fabrication

Erection Hydrostatic Testing

Pre/Hydro Punch Post/Hydro Punch

Field Verification Isometric

Orthographic P&ID

Plan Drawings Field routing small/large Bore Pipe

TRAINING

10 hours of Certified OSHA Training

8 Hours Supervisory Training, Fina Chemical Plant, La Porte, TX

OSHA Supervisory Safety Training, Amoco Chemical, Wando, S.C.

Total Safety Training, Shell Refinery, Deer Park, TX

******@***********.***

Copyright © 2003-2005 Cooper Pugeda Management, Inc. All rigths reser



Contact this candidate