Posted/Modified
Title:
E&I Planning Engineer
e-mail:
**********@**********.***
Phone:
Industry:
oil & gas
Desired
Location:
Middle East
Willing
to Relocate:
Yes
Desired
Salary:
$30,001/yr - $45,000/yr
Resume:
I am a Electrical & instrumentation Project Planning & control Engineer, having overall experience of 8 years in the field of Oil & Gas, chemical plant, Steel Plant, Power plant, Auto auxiliary plant, and IT Building project etc.
Educational Qualification : B.E. (Electrical & Electronics Engineering-2003)
Certified course : Primavera P3 (Cadd Centre Ltd.)
Total work Experience : 8 Years.
Technical Qualification : MS Project, Primavera P3 and P6.
Approval Status : KOC-Kuwait Approved Electrical Engineer
PROFESSIONAL EXPERIENCE:
S.No Company & Project Name Position Duration Client
1 M/S. Control Application Emirates-UAE
1. RRE Project, Packages #D(Utilities & Offsite) E&I Planning Engineer From FEB 2011 M/S. Samsung Engineering Ltd-UAE
2 M/S. United Engineering Services. Co. WLL-Kuwait
1. Permanent shelter for Maintenance Staff-HVAC Project-KNPC.
2. New Effluent Water Transfer Substation- HVAC Project-KOC.
3. New crude oil pipe line from TL-3 To Doha East power station-HVAC Project-KOC.
4. Installation of New compressor GC 7, 8 & 21- HVAC Project-KOC.
5. Soor Petrol station Electro-mechanical project. Electrical Planning
Engineer From Jan 2010 to Jan 2011 KNPC & KOC
3 M/S. Hyundai Engineering Construction Company Ltd.-Qatar.
1. (IWPP) Power Plant and water project. Electrical
Engineer
March 2009 July to 2009 M/s. Ras Girtas power company-Qatar.
4
M/S. RYB Electro Tech -India.
1. L&T Tech Park Cochin. (BUILDING PROJECT).
2. CTS Project Chennai (BUILDING PROJECT). Electrical Planning Engineer
Oct 2007 to Feb 2009 M/S.L&T Ltd India.
5 M/S. Nasser.S Al-Hajri corporation, Saudi Arabia.
1. Hadeed New Wire Rod and Rebar mill
2. Advanced polypropylene company. Electrical Planning Engineer
June 2005 to Sep 2007 1.M/s.Daniely automation ltd-Italy
2. M/s. Samsung Engineering Ltd. KSA.
6 M/S. Sri Kamatchi Electrical & Controls. Chennai India. Electrical Engineer Aug 2003 to April 2005 Maintenance project
Field of Experience:
Prepare the master construction schedule at the bidding time and split to L4 and L5 and follow the same at the time of construction.
Forecast requirement for electrical engineering resources for site activity and allocate those resources to various location at site.
Prepare electrical man hour estimate to perform project tasks with in the schedule.
Project schedule preparation and updating.
Coordination with other discipline planning and field engineers such as Mechanical, civil, and safety to execute the job with out delay and rework.
Monitor the day to day activity in the site and make forecasting.
Prepare Invoice based on work progress in site progress.
Obtain the certification from client for progress measurement of all electrical activity.
Prepare BOQ based on approved construction drawing, project specification and detailed installation procedure.
Prepare the technical documents as per the project specification and company standard.
Installation of Electrical Equipment, Lighting system, Grounding system, and Cathodic protection and BMS system.
Cable tray support fabrication & installation and cable tray installation.
Assist the project management team in decision making with respect to planning and scheduling of tasks, organizing the resources, contract administration while executing the project.
Overall coordination with Engineering Consultants, Clients, Sub Contractors and vendors during various phases of the project from Detailed Engineering, Construction, Pre-commissioning, Commissioning, until Project handover.
Preparation / review of Sub Contractor?s & Vendor?s Packages as per the Project requirement.
Procurement of material as per the technical specifications of the contract.
Work Experience Details:
Duration: FEB 2010 to Till date
Presently working
Company : M/S. Control Application Emirates
Position : E&I Planning Engineer.
Job Responsibility/ Profile:
Project Planning, Scheduling using by PRIMAVERA (P3 & P6) tool & Monitoring & controlling Projects
Progress Measuring & Reporting Systems.
Manpower Planning, Material, Tools & Equipment Mobilization Plan.
Generate S- Curves and histogram for Manpower
Study of Project Contract Agreements, Engineering Drawings, Business Plans & Scope of works
Project Coordination with Our Client & Internal Various Departments includes Engineering, Procurement, Construction, Workshop Fabrication yard, Vendors & Suppliers
Study of Engineering drawings and technical specifications.
Define the WBS Levels & Activity code Levels for having effective control over the Project
Identifying the Areas of concern and Critical path of the project.
Preparation of the Look ahead Schedule that effectively drives and control the Project.
Preparation & Maintain the Progress Calculation, Estimated Bill of Quantity.
Measuring the progress Performed and compare the Baseline Plan Vs Actual Progress to analyze the delay.
Monitoring and Update the day-to-day site activities, manpower, Equipments Utilization and Construction activities.
Preparation the Project Construction Reports (Daily, weekly, Monthly, Look ahead), which includes the Project Schedule & S- curve, Resource Analysis, Material & document Status.
Present the project performances status with our client for Monthly meeting.
Duration: Jan 2010 to Jan 2011
Company : M/S. United Engineering Services Co W.L.L.
Position : Electrical Engineer (Construction/Planning).
Job Responsibility/ Profile:
Vendor / consultant co-ordination.
Selection of Cable, cable tray and conduit for HVAC System.
SLD schematic drawing development for HAVC system.
Preparation of control and power cable schedule.
Review of drawing related with control, protection, interlocking, etc.
Layout drawing preparation / review.
Exposure in techno-commercial aspects of project and report to the project manager.
Prepare the electrical shop Drawing and get approval from the client.
Prepare technical document for materials and get the approval from client.
Prepare ITP and check list of all electrical installation.
Preparation of pre commissioning check list for low voltage electrical system and get the approval from client and follow the same at time of construction.
Quantity surveying and Procure the materials through project manager.
Preparing the construction schedule in Primavera P3 and MS Projects
Duration: Mar 2009 to July 2009
Company : Hyundai Engineering Construction Company Ltd. Qatar.
Project : CI-WPP (Power Plant and Water Project)
Position : Electrical Engineer (Construction)
Client : Ras Girtas Power Company.
Job Responsibility/ Profile:
As Construction Electrical Engineer, job scope involves the following major Electrical Equipments installation/ works;
Provided technical support to sub contractor for site execution.
Maintained effective working relationships with field crews, contractors, vendors, outside agencies and site staff members.
Monitoring the progress for all kind of electrical installation activity in the site.
Quantity surveying in the drawing and compare with bill of quantity and reporting to panning term though electrical manager.
Electrical equipment installation such as 11KV MV switch gear, 310MVA transformer, and LV switch gear.
Preparation of daily progress report and submit to the electrical section manager.
Duration: Oct 2007 to Feb 2009
Company : M/s. RYB Electrotech Chennai. India.
Project : L&T Tech Park. And CTS Project (Building Project)
Position : Electrical Engineer (Planning & Construction)
Client : L&T Ltd . India.
Job Responsibility/ Profile:
Project Scope involves the following major works;
Material requesting and deliver the materials to site for construction.
Client material and internal materials control.
Dealing with client for the technical problems at the time of execution.
Preparation of monthly, weekly and daily progress report for the internal.
Preparation of monthly and weekly schedule for the internal.
Preparation of monthly invoice and backup document to the client.
Manpower and Equipment schedule allegation and schedule preparation for internal.
Duration: June 2005 to March 2006
Company : M/s.Nasser?s Al-Hajri Corporation. Saudi Arabia.
Project : Hadeed wire Rod and Rebar Mill.
Position : Electrical engineer (Construction & Planning)
Client : Daniely automation ltd-Italy
Job Responsibility/ Profile:
Project Scope involves the following major works;
Preparation of JSA and conducting the tools box meeting for the workers based on JSA as per the client requirement.
Obtain the work permit from the client.
Preparation internal daily progress report and reporting to planning dept through electrical superintendent.
Installation of grounding system such that including the activity of excavation, cable installation, back filling, cable termination, earth rod and earth pit installation.
Installation control cable tray such that including the activity of cable tray support fabrication in the workshop, support installation, and cable tray installation.
HT, LT and Control Cables pulling in pipe rack, direct buried, duct bank, cable tray and cable trench.
Erection 34.5KV & 11 KV switchgear Panels, LT Switch Gear Panels, SCADA Panel, E/I Interface Panel, Power and Lighting distribution Panel, UPS Panels, Battery charger, UPS distribution Panel and LCS, Motor control Station .
Installation of building systems, such as Fire alarm, fm 200, PA, Paging, CCTV, Telephone, LAN, and HVAC system.
Installation of electrical systems for laboratory equipments.
Installation of lighting such that including the activity of conduit installation, cable pulling, receptacles installation, lighting pole installation for street light, plant lighting, building lighting.
Cathodic protection system such that including the activity of anode, cathode and transformer rectifier installation.
Loop checking for instrumentation cables and power cable.
Installation pulpit operating disk and there control cables.
Duration: April 2006 to Sep 2007
Company : M/s.Nasser?s Al-Hajri Corporation. Saudi Arabia.
Project : Advanced Polypropylene Company.
Position : Electrical Engineer (Planning and project control)
Client : Samsung Engineering- Saudi Arabia.
Job Profile:
Project Scope involves the following major works;
Preparing the construction schedule in Primavera P3 and MS Projects.
Regularly monitoring critical path and preparing schedule impact reports to the planning manager.
Evaluating project progress on weekly basis and providing the management with comparative analysis.
Responsible for day to day interaction with client / consultants / subcontracts regarding the progress of the works.
Preparation of detailed Schedule from Bill Of Quantities
Preparing installation schedules in coordination with equipment supplier, match with the project completion master plan.
Coordinate with the engineering and procurement department regarding the interfacing of construction activities and Material & Equipment availability.
Construction / shop drawings approvals, material approvals, delay in site inspection, bill of quantities ?variation & addition / deletion? and natural calamities, site instruction register, etc for applying Extension of time.
Keeping close watch on various activities of Project, like delivery of materials, site clearance, duration of activities, etc.
Preparation of monthly invoice to the client.
Preparation of progress measurement document for the invoice as per the client requirement.
Preparation of work brake down structure.
Daily progress quantity approval from the client.
Duration: Aug 2003 to April 2005
Company : Sri Kamatchi Electrical & Controls. Chennai India
Project : TVS Grope Of companys- Maintenance Project.
Position : Engineer (Electrical)
Client : TVS ?India.
Job Responsibility/ Profile:
Project Scope involves the following major works;
Electrical equipment LV switch gear installation.
Visual checking the progress in site.
Lighting system installation.
Power panel control wiring, erection and commissioning.
Maintenance of Air Circuit Breaker, Vacuum Circuit Breaker.
Testing and Pre-Commissioning of Power and Control Panels.
Personal Details:
Name : N.PERIYASAMY,
Father Name : M.NAGARAJAN,
Nationality : INDIAN,
Date of Birth : 10-06-1981,
Permanent Address : 2/247, MAIN ROAD,SAKKARASAMANTHAM,
THANJAVUR, TAMILNADU,
SOUTH INDIA-613002.
Email : **********@**********.*** .
Mobile no : 009**-*********,
Passport Number : E7186075,
Date of Issue : 28.10.2003,
Date of Expiry : 27.10.2013,
Place of Issue : Tiruchirappalli,
Marital Status : Married
DECLARATION:
I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars.
Place: Abudhabi-UAE
Date:
(N.PERIYASAMY)
******@***********.***
Copyright © 2003-2005 Cooper Pugeda Management, Inc. All rigths reser