Post Job Free
Sign in

Project Construction

Location:
San Jose, CA
Posted:
October 02, 2012

Contact this candidate

Resume:

Posted/Modified on:

**/**/****

**:**PDT

Resume Title:

Master Scheduler/Claims Analyst/Trainer

for Christi Banks (Consultant) - ***UDBE / WBE /

SBE***

Contact e-mail:

*******.*****@*************************.***

Contact Phone:

408-***-****

Industry:

Construction/Nuclear/Power/Claims/All Others

Desired Location:

CA, WA, WY, MT, OR, CO / All U.S.

Willing to Relocate:

Yes

Desired Salary:

$91/hr - $105/hr

Resume:

CHRISTI BANKS

1177 Branham Lane #278

San Jose, CA 95118

408-***-****

Business Cell

***100% Woman Owned Business with UDBE/WBE/SBE Certifications***

PROFESSIONAL ACCOMPLISHMENTS:

Master Scheduler/Project Management Creative Planning Solutions, San Jose and

Roseville, CA - Business Owner

Olympic Associates, Seattle, WA Ongoing scheduling services for various construction

management public works projects in the Seattle, WA area and Billings, MT area.

TBI Construction & Construction Management, San Jose, CA Ongoing company training and

scheduling services for various general contracting and construction management building

projects in the San Francisco Bay Area.

DR McNatty & Associates, Mission Viejo, CA Ongoing scheduling services for various

construction related projects throughout California.

South Bay Construction, Campbell, CA Company training and scheduling services to

various mid-size commercial building projects in the San Francisco Bay Area.

Universal Building Systems, Palo Alto, CA Provided project scheduling and project

engineering services for various tenant improvement projects throughout the Bay Area.

Scheduling includes proposal schedules, development, updating and plotting.

Ryan Associates, San Francisco, CA Provided project scheduling services for various

high-end residential projects in the

Bay Area. Scheduling includes schedule development, updating and plotting.

Mortenson Construction, Livermore, CA Provided project scheduling services for the

Terascale Simulation Facility at the

Lawrence Livermore Lab. Scheduling induded schedule development and monthly updates.

Philips Semiconductor, San Jose, CA - Provided contract master scheduling services for

the consolidation and renovation of 9 buildings on the Philips Campus. Coordination

included design, construction and moves for the entire project. Responsibilities included

development of a Site Consolidation Master Schedule for the client, weekly schedule

updates and revisions, coordination between the client and the bid package contractors,

document control system set-up and project-wide engineering/management.

Lorman Educational Service, San Jose, CA Provided master scheduling and construction

delay analysis training to

Owners, Architects, Contractors and Subcontractors.

Expert Claims Consultant

Watt, Tieder, Hoffar & Fitzgerald, LLP, Irvine, CA

Provided ongoing scheduling and engineering consulting services for surety claims and

ongoing multi-million dollar construction projects. Responsibilities include providing

support to firm attorneys, as well as construction clients during the project

construction, close-out and the claims processes. Areas of specialization include claims

prevention and analysis, project management, schedule development and maintenance, field

staff training and document control analysis.

Master Scheduler Valley Transportation Authority, Santa Clara, CA

Provided project controls support specifically in the area of master scheduling for the

BART Extension from Fremont to San Jose. Master scheduling includes the integration of

people and work involved in the Environmental Assessment Process, Right-of-Way Acquisition

Process, Utility Relocations through actual construction of the entire heavy rail program.

Scheduler II Hathaway Dinwiddie Construction Company, Santa Clara, CA

Provided scheduling services which included master scheduling, schedule

monitoring/analysis, project updating and development of proposal schedules.

Responsibilities included the ability to adapt to various types of projects, locations and

people, from project owners to project managers and superintendents. This required the

flexibility and skill of utilizing different types of scheduling software, and the ability

to train others. Notable projects included:

BIO-X/Clark Center. $90M Stanford University. Four story, word class biotech research

facility that includes classroom, auditorium and cafeteria.

Stanford Main Quad Buildings 160/170. $22M Stanford University. Historic seismic

renovation of last remaining unreinforced building on the main quad (Built in 1898).

Genentech Building 7. $

21M

South San Francisco, CA. Three story lab extension.

Brittannia Technology Center. $170M South San Francisco, CA. 550,000sf of mid-rise

office buildings and parking structure.

ABC7 Studios. $39M Los Angeles, CA. 150, 000sf broadcast news facility and technical

suites.

Project Controls Engineer II

OBrien-Kreitzberg, Inc., San Jose, CA

Provided master scheduling and project management services to the Santa Clara Valley

Transportation Authority for the Tasman, Capitol and Vasona Rail Lines totalling more than

$600M in anticipated costs. Master scheduling included the integration of people and work

involved in the Environmental Assessment Process, Right-of-Way Acquisition Process,

Utility Relocations through actual construction of the entire rail program. Prior to

master scheduling, my responsibilities included being integrally involved in the start-up,

construction and closeout of various light rail transportation projects. As the scheduler

for the Tasman East Projects, it was my responsibility to monitor the Contractors work in

the field, analyze the Baseline Schedules and monthly updates, and mitigate delay and

claim issues. Reviewed and analyzed requests for extensions of time. Specialized in

training field personnel in Basics of Effective Schedule Management. Project scheduling

was provided on the following projects:

C713 Baypointe, Track and OCS. $8.2 M.

S770 Baypointe LRT Signals. $1.4 M.

C440 Gualalupe Platform Retrofit. $2 M.

C510 Civil, Track & Landscaping. $7.3 M.

S510 OCS & LRT Signal System. $2.3 M.

Project Controls Engineer

Analytical Planning Services, Inc

., Irvine, CA.

Provided scheduling services for both the Owner and the Contractor. Integrally involved

in development and analysis of the baseline schedules and monthly updates for logic,

duration changes, constructability and flow of work laid out by the schedule. If the

schedule was cost and resource loaded, the cost and manpower allocations by trade were

examined by using the Miller Curve distribution. In addition, cost and manpower ratios

were verified. Float trend analyses were prepared on a monthly basis for each project. If

working for the Owner, an analysis of the Contractors recovery schedules was done

whenever progress was delayed and mitigation measures were necessary. Project scheduling

was provided for the construction of the following projects:

Humanities/Fine Arts Music Building for the University of California Irvine. $5.3 M. A

design-build project for the construction of a three-story building which included house

faculty offices, studios, and rehearsal rooms for the School of the Arts. Performed the

schedule analysis for the cost and resource loaded schedule. Provided an independent

review of the Baseline Schedule and the Monthly Updates. Reviewed and analyzed Requests

for Extension of Time.

Student Recreation Center for the University of California Irvine. $11 M. This project

included workout rooms (aerobic and weight), office space and an Olympic pool. Performed

the schedule analysis for the cost and resource loaded schedule. Provided an independent

review of the Baseline Schedule and the Monthly Updates. Reviewed and analyzed Requests

for Extension of Time.

Crawford Hall Pool Replacement for the University of California Irvine. $2.7 M. This

project consisted of the demolition and re-construction of an existing pool and associated

recreational buildings. Performed the schedule analysis for the cost and resource loaded

schedule. Provided an independent review of the Baseline Schedule and the Monthly Updates.

Reviewed and analyzed Requests for Extension of Time.

Clovis High School 2nd Educational Center. $30 M. A multi-complex facility for the new

high school in Clovis, CA. Developed a 2,800 activity schedule, with the Contractor, which

was fully cost loaded and resource loaded. Processed monthly updates and payment

applications. Prepared fragnet analyses for Extensions of Time.

Construction Engineer II

Fluor Daniel, Inc., Irvine, CA

Stafford Creek Corrections Center for the Washington Department of Corrections in

Aberdeen, WA - $128M Integrally involved in preparing the master schedule and request

for proposals for twenty-two bid packages proposed on the project. Worked on design

review, constructibility review, and value engineering. Involved in the development of the

project start-up procedures that involved setting up project guidelines for contractors,

paperwork flow and pre-bid activities.

California Substance Abuse and Treatment Facility and State Prison at Corcoran for the

California Department of Corrections $300M - Developed project startup procedures for

Bid Packages 4, 11, and 13. Processed, maintained, and tracked all submittals for each

general contractor; reviewed all as-built drawing updates for addendum, bulletin, PCO, and

RFI items; reviewed monthly Progress Billing Updates for each of the contractors.

Processed change orders for all bid packages. Updated progress photos and reviewed daily

inspection reports. Coordinated all field issues with site inspectors and the contractors.

Compiled all data for claims and disputes issues for all bid packages. Attended weekly

coordination meetings with all contractors. Developed a site-wide job closeout procedure

which included reviewing operation and maintenance manuals, guarantees and warranties,

owner training, and other client deliverables.

Scheduler/Project Engineer

- Soltek of San Diego, San Diego, CA

California State Women's Facility, Chowchilla, California - $8M - Processed, maintained,

and tracked all submittals for each subcontractor on bid package 8; processed all as-built

drawing updates for addendum, bulletin, PCO, and RFI items; developed and produced monthly

Progress Billing Updates which included gathering all submittal, review and approve,

fabrication and delivery, and construction tracking activities from project staff.

Billings involved updating and revising the project baseline schedule for distribution and

approval from the California Department of Corrections. Weekly partnering meetings were

conducted with Fluor Daniel and the Department to the State Architect to discuss submittal

tracking and short interval barcharts in Primavera. Job closeout procedures included

processing, maintaining and tracking all operation and maintenance manuals, warranties,

and guarantees.

EDUCATION:

B.S. Degree

in Construction Management from California State University Fresno in May

1993

.

Non-Degree Masters Study in Pastoral Ministries from Santa Clara University

.

M.A. Degree

(Anticipated) in Theology and Christian Ministry from the Franciscan

University of Steubenville

PROFESSIONAL ORGANIZATIONS/VOLUNTEER WORK:

Engineers Without Borders, USA (2007-Present)

COLFS Culture of Life Family Services (2005-Present) Volunteer Construction

Assistance for Various Pregnancy Clinics, San Diego, CA.

National Association of Women in Construction - (1994 - Present). Active Member of

Chapter #108 of Fresno, CA.

Villa Montalvo Center for the Arts Volunteer (1999-2005) Saratoga, CA.

COMPUTER KNOWLEDGE:

Extensive work with the following software: Primavera (P3 3.1 to P6 8.2), Suretrak,

Microsoft Project (All versions), Claim Digger, Schedule Analyzer Pro, Expedition, MAXIMO,

BIDDS, Agtek Digital Estimating, Hard Dollar, Microsoft Office (Word, Excel, Mail,

Publisher, Powerpoint).

**REFERENCES AVAILABLE UPON REQUEST



Contact this candidate