David Dryer
Email: *********@********.***
Address: ***** ****** *****
City: Silverton
State: OR
Zip: 97381
Country: USA
Phone: 503-***-****
Skill Level: Management
Salary Range: 80
Willing to Relocate
Primary Skills/Experience:
See Resume
Educational Background:
See Resume
Job History / Details:
David Wayne Dryer
19052 Coyote Ridge, Silverton Oregon 97381
Telephone: H 503-***-**** C 503-***-****
Email: *********@********.***
Qualifications:
* 30+ Years Electrical/Instrumentation Construction Installation, Supervision, Quality Control, and Management roles.
* Practices the ZERO accident philosophy.
* Thrives on tight schedule and fast paced work environments.
* Strives to meet client expectations.
* Experience in DOE, DOD, EPMC, EPM, Lump Sum, Cost Plus Projects.
* Experience in Waste water, Water pumping stations, Chemical Plant, Oil and Gas, Mining and Metals, Large Hospital facilities, Industrial, Commercial.
* Multi-Discipline inspection and coordination experience.
* High-level training Six-Sigma methodology.
* Proficient in Microsoft Outlook, Excel and Word.
* Experience in use of proprietary electrical installation database systems.
* Smart Plant 3D Plant Modeling Software.
* Accubid Estimating Software.
* Limited Auto-Cad Experience.
* Strong background in Motor Controls, PLC`s, controls design and troubleshooting.
* Ability to read all construction drawings, P&ID`s, electrical schematics, electrical one-line drawings, piping ISO`s Weld Map`s.
* Knowledgeable in NFPA 70E, NEC, API 552, API 551, NEMA Standards, OHSA 1910, ANSI, IEEE, UL electrical equipment standards, USACE, MIL Standards.
Experience: I&E Construction Manager 7/12- 9/12, Eichleay Engineering, Gallo Livingston, California Project: Gallo Livingstone winery east side expansion. Implemented construction turnover and punch lists to establish completion dates in line with the client construction management team for reporting and determining plant operations will be ready for the grape harvest for the production of wine.
Walked down remaining work to be completed, performed a full quantities and manpower estimate for a projected completion date and estimated budget.
Held daily progress meetings with subcontract management team to review work completed, address scheduling, manpower, materials and engineering issues.
Directed on-site engineering priorities to meet immediate field installation issues the construction schedule.
Worked with system -owners- individually to address specific construction or engineering issues to meet system turnover completion dates.
Experience: Electrical Field Engineer III 5/12-7/12 Bechtel Australia PTY, Moranbah, QLD, Australia
Project: Caval Ridge green field coal mine. Review design documents for conformance to codes and standards, review of specifications and design criteria meeting codes and standards. Reviewed construction drawings of vendor submittals.
Reviewed Engineering Proposals to verify vendor equipment met the project requirements.
Monitored the electrical installation of coal handling machines, give technical direction to subcontractors. Perform Visual Inspections and witness of construction activities including electrical hi-potential testing, insulation resistance (megger) testing, and torque of electrical connections. Review work practices are in accordance to the standard work process procedures. Experience: Electrical/Instrumentation Quality Control Field Engineer III, 1/10-3/12, Bechtel BSII, Project: Pueblo Chemical Agent-Destruction Pilot Plant, Pueblo, Colorado Perform Visual Inspections and witnessed electrical, instrumentation, civil, structural and architectural construction activities.
Submitted daily reports for activities and observations
Monitored electrical hi-potential testing, insulation resistance (megger) testing, torqueing of electrical connections, grout preparations for installation, epoxy anchor pull testing, mechanical anchor installation torque, piping cleanliness checks instrument installations. Review fieldwork installation practices are in accordance to the standard work process procedures.
Identified all electrical equipment that did not meet NRTL requirements.
Review design documents for conformance to codes and standards, review of specifications and design criteria meeting codes and standards. Review construction work packages for electrical, instrumentation and mechanical installations, verify applicable SWPP`s, Drawings, test records and testing criteria if required are covered by the work package.
Verify relevance to Field Engineering and Quality Control hold and witness points for the activities being performed in the work package. Review subcontractor inspection and test plans. Audit issued work packages that work being performed to the latest revision of drawings, issued FCN, FCR or DCN. Generated Deficiency Reports (NCR`s) for installation or design, not meeting codes, standards (NEC, API, IEEE, ASME/ANSI) or project specifications. Drafted Corrective Action Request for procedural violations or for multiple DR`s of same subject. Perform organizational self-assessments (Audits) on standard work practice procedures. . Perform quality control surveillances on self-performed activities (BSII) as well as subcontractor activities, Review M&TE usage logs, monitor M&TE equipment calibration date due requirements. Wrote on site Verification procedures for project M&TE tools. Review inspection and test records before submission to info works. Perform surveillances of stored in place equipment. Verify data sheets against field-installed equipment. Experience:
Electrical Subject Matter Expert, 12/09 Washington Closure Group, Hanford, Washington.
Environmental Restoration Disposal Facility
Reviewed electrical shutdown requests.
Monitored electrical work in progress.
Addressed electrical questions or concerns, in regards to electrical shutdown.
Reviewed construction drawings for constructability issues.
Experience:
Electrical/Instrumentation Quality Control Inspector, 9/09-11/09, Willbros/EIU Corp. Steele City, Nebraska Project: Short-term contract for TransCanada Pipeline Project, Steele City Pump Station. Reviewed installation documentation issued by Contractor met project requirements. Performed visual inspections of electrical and instrumentation installations. Verified NEC and API codes and standards, inspection and test plans were met. Experience:
Electrical/Instrumentation Quality Control Manager, 7/08-5/09, Contra Costa/Dynalectric Moses Lake, Washington, REC Poly-silicon Fluid Bed Reactors, Silane and Hydrogen production plants.
Managed a staff of QC inspectors.
Monitored daily fieldwork activities.
Assigned inspection activities to inspectors based on discipline and turnover schedule.
Coordinated with contractor to track job progress in inspections and punch list items to facilitate the turnover to the owner for commissioning.
Assigned punch list items to applicable disciplines for completion.
Maintained logs for tool calibrations certified welding certificates for structural and pipe welding, vendor skid preservation requirements and frequency of inspection.
Developed job specific requirements in electrical and mechanical inspection and sign off procedures. Developed project requirements for torque requirements of bolt up flanged instruments.
Wrote the Construction Quality Plan for 4.0 phase of the Silane/Hydrogen production plant.
Experience:
Electrical Field Engineer/ Electrical/Instrumentation Quality Control Inspector 3/08-7/08, Contra Costa/Dynalectric, Moses Lake, Washington REC Poly-silicon Fluid Bed Reactors.
Reviewed electrical construction documents for conflicts in construction. Reviewed electrical control drawings, Vendor electrical drawings for conflicts in construction Alternate lock out tag out (LOTO) coordinator Created work packages for electrical control terminations encompassing 120V hard wire controls and DCS systems in motor control centers and DCS control cabinets Procured material for special modifications required by vendor and contract drawings. Aided field, project engineer, and superintendents with questions arising from drawing interpretations, constructability issues, vendor skid issues and code questions in electrical installations in classified and non classified areas. Field inspected electrical conduit, cable tray, cable tray wiring, lighting, instrument installation, instrument piping, control wiring to valves and transmitters, checked valve and instrument locations against P&ID`s, verified scope contractual installation requirements against field installed devices Electrical Distribution Systems from 13.2KW, 4161 and 480 for motor feeders, control systems, DCS, Siemens Profibus, Yokagowa Field Bus, and analog systems.
Walked down piping systems, electrical systems for turnover status.
Experience:
Project Manager, 10/07-3/08, Dynalectric, Portland, Oregon
Managed construction of electrical capital improvements and facility maintenance projects in a large university Hospital.
Prepared and reviewed contracts for work scope, specifications and project specific requirements
Estimated and prepared change orders for contract work.
Managed project budgets.
Managed manpower and tool resources
Provided direction to field supervision when warranted
Estimated projects valued up a $1,500,000. Prepared budgets on awarded contracts. Procurement and tracking of project deliverables. Prepared monthly work in progress reports for corporate management team. Monitored job site work in progress, critical path, and milestones to meet scheduled completion dates.
Monitored field supervision manpower requirements to meet project completion dates and budgeted manpower according to estimates project scope, goals and deliverables
Experience:
Supervisor General Foreman, 4/97-9/07, Grasle/Dynalectric Portland, OR
Supervised electrical installations in large Hospital/Research facility installations including 12.5 KW electrical distribution systems, 480V distribution systems, motor control systems, lighting, DDC control, nurse call systems, patient monitoring systems and networks, fire alarm systems and networks, emergency generator systems, paralleling and transfer gear. Conducted weekly safety meetings
Promoted a ZERO accident philosophy
Procured Materials needed for project based on scope and specification.
Worked in areas of high logistical issues for tool/material deliveries and storage. Developed hazardous work plans for hot electrical work.
Performed work in occupied patient care areas to meet infection control standards.
Reviewed construction documents and specifications to clarify work and contract scope.
Notified project management team if any, time and scheduling issues that would affect the overall completion of the project Assigned crew sizes to projects based on estimates and contract work completion dates. Made routine field inspections of work in progress verified work installed was in scope will all construction documents maintained a ZERO punch list work ethic. Participated in pre-construction and weekly progress/scheduling meetings.
Developed weekly and three week look-ahead manpower schedules. Developed installation standards, specifications that were implemented as facilities standards. Identified unlisted electrical equipment facilitated the inspection and certification of noncompliant equipment.
Education Electrical Journeyman Wireman Apprenticeship
Joint Apprenticeship Training Committee, Portland Oregon
Graduated with attendance Honors
Electronic Engineering Technologies
ITT Technical Institute, Portland Oregon
Licenses:
Washington State Electrician Journeyman (Inactive)
Oregon State Electrician Journeyman (Inactive)
Certifications_ Australian Queensland Mining Safety and Health act Standard 11, 1012 Australian OSHA Supervisor S1, S2, S3 Surface Extraction Operations, 2012 NQA-1 Lead Auditor Training Course (10CFR50Appendix B, ANSI N45.2, ASME NQA-1, 10CFR21), 2009 Proving Pricing & Defending Inefficiency Claims 2007 Accubid Estimating Software Lab 2007 Time management and Office Productivity 2007 Dale Carnegie Training 2003