Post Job Free
Sign in

Program/Project Manager (Manufacturing)

Location:
San Antonio, TX
Posted:
February 28, 2013

Contact this candidate

Resume:

Edgar Montemayor **************@*******.***

210-***-****

San Antonio, Tx

Organizational Project

Manager

• Project Leadership •

Cost Reduction • Lean

Manufacturing •

Workforce Planning •

Bi-lingual

Strong leadership in high

cost projects and

operations of latest

technology in low pressure

and gravity processes for

aluminum sand and

permanent mold castings

in the automotive industry.

New projects coordinator

for all model year and

engineering changes with

vehicles airbags high-tech

and new automated

assembly lines or

equipment upgrades

including fully automated

robots to meet

customer/production

requirements. Meet and

exceed budget goals in a

safely timely manner and

Quality, and comply with

customer start up on site

(USA-MEXICO-

EUROPE-ASIA).

• QA / QC

Continuous Process

Improvement •

Production Management

• TPM (Total Productive

Maintenance)

Operations Improvement

Project Management

Restored obsolete Equipment to full productive capacity. Results: Reduced installation time of new

equipment by 50%, saved $1M in costs.

PROFESSIONAL

EXPERIENCE

Relocated Equipment from other plants to a centralized plant to accommodate new business, saving at

least 1/2 of total line cost.

Process Improvement

Implemented a new process to reduce cycle time through machine movements and speed. Results:

Increased production by 40%, improved quality, saved $1.5M eliminating need to buy a new machine.

Manpower Management

Performed weekly meetings to address and solve personnel problems. Results: Reduced Turnover 3.5%

to 1%, improved morale and productivity.

High Volume Production

Added a second floor plan to stack up process carts, use same floor space area, as production was

doubled, only a small modification to carts were made . Results: Avoided building construction by

expending $100K instead of $1M.

Product Development

Controlled all new parts coming for a new product by developing a chart where you can see easily each

part of the products, and then having the opportunity to grab an existing part from an old product. Results:

Reduced the part set up, inventory and design of new molds, involving costs of $500K.

Cost Reduction

Resolved issues of associates working under pressure conditions and without adequate tools or good

environment conditions. Results: Scrap automatically went down every month from being 10% to 1%.

Lean Manufacturing

Implemented frequent machine supports change every 15 days instead of replacing them when

maintenance sees the equipment started to fail and scraped the product after process it. Results: Saved

200K scrap reduction vs replacements costs of only $60K annually.

Customer Relationship Mgt

Instituted a scrap ramp up plan on every new product introduction to have 1st month with 100% shade

trainer, 2nd month with 50% of back up and the other 50% being re-inspected and finally the 3rd month

by itself. Results: Reduced PPM or ranking by 50% each customer provide to their suppliers.

Nemak Aluminio S.A de C.V.

Manufacturing and New Projects Head – New Projects Management (09/2010 – 06/2012)

Planned, organized, developed and integrated the team (Engineering/ Purchasing/ Human Resources/ Process,

Production, Industrial, etc.) creating timelines to follow up from start to end. Established specific objectives

and key dates of the project to administrate customer events and assigned budgets to achieve expenses

targets with good quality and meeting due dates. Led projects and meetings with customers and suppliers to

review status of program and close of open items that may affect the project developed and provided fast

resolutions. Evaluated and developed new products and equipment in order to comply with customer

specifications and Goverment’s regulations.

Takata de Mexico S.A de C.V.

Program Manager – New Programs Management (10/2005 – 09/2010)

Conducted cross-functional teams meetings to follow up critical due dates on Customer programs.

Managed issuance of projects “CAR’s”, Capital Acquisition Request for expenditures to control budget of

project as well as the administration of all areas to have the project being succeed.

Prepared new products ramp-up plan for the plant, conducting meetings with all departments involved

before start of production to assure no issues with customer.

Teksid Aluminio de Mexico, S.A. de C.V.

Training / Education

Production Superintendent – Operations Management (04/2001 – 10/2005)

Supervised Production lines meeting targets in quality and quantity.

Reduced maintenance and scrap cost.

Updated Quality System ISO/TS-16949.

Served as Internal Auditor for ISO/TS-16949:2002

Managed 150 including 9 supervisors.

Quality and Process Engineer – Quality Assurance Dept. (09/1999 – 04/2001)

Directed Plant Process Control. Managed the Analysis and interpretation of the current level of scrap, to fulfill the

requirements of the quality system ISO/TS-16949:2002. Reduced problems inside the plant or at the customer’s

site (Chrysler assy plant).

Investigated main defects through a detail analysis (7 Step, 6 Sigma, etc.) of the problem, using statistical,

dimensional, chemical, physical data, try outs.

Used Computer simulation to analyze the casting process of the aluminum pouring using mathematical models.

Conducted presentations at customer's plant for trial results and main actions items for scrap reduction.

Compiled monthly reports given to FIAT Corporative (Italy), to customer (Chrysler) and to the financial department

(Teksid) besides conducting weekly meetings with the upper management.

Delivered continuous follow-up of testing performed at customer’s site.

• BS in Electronics and Communications Engineering

• Mechanical Electrical Technician

• SAP Software Basic Knowledge

• Project Management Orange Belt training PMI (Takata Monclova, Mex.)

• Internal Auditor for ISO 14001 (Teksid)

• Internal Auditor for new Q. S. ISO/TS-16949:2002 (Tec. of Monterrey)

• 6 Sigma (Black Belt) ITA Institute

• The New Supervisor's Role (Tec. of Monterrey)

• TPM (Total Production Maintenance, Teksid)

• MS Office: MS Project, Outlook, Word, Excell, Power Point, Basic Autocad.

• Effective Combustion and its Control Seminar (NUTEC, Monterrey)

• Statistical and Costs Control (Teksid)

• Simulation of Aluminum Feeding Systems (MAGMA Software, USA)



Contact this candidate