Senior engineering and maintenance manager with extensive experience in
diverse industry sectors, including manufacturing, printing and equipment
design and installation. Expertise in managing multi-million dollar capital
projects ensuring completion on time and with budget. Proven success
directing large scale operations using LEAN methodologies. Demonstrated
ability in designing and implementing process improvements that increased
production efficiencies of up to 150%. Successfully implemented CMMS
program used to track and schedule preventive maintenance and spare parts
usage resulting in increased equipment reliability and cost saving. Strong
record of leading high performance teams of over 80 technical personnel.
Focused on metrics and mentoring and coaching.
Experience
Kellogg's, Lancaster, PA
2011 - 2013
Senior Maintenance Manager
. Managed twelve direct reports, which include, seven Maintenance
Leaders, four Maintenance Planners and one Stores Supervisor.
. Responsible for 84 maintenance craftsmen. Identifying craftsmen
training needs and providing the training to fill to skills needed.
. Managed $15MM annual maintenance budget with in budget.
. Provided source of loss detail including maintenance plan around loss,
what was the root cause and what counter measure will be put in place
to prevent loss from reoccurring.
. Collaborated with operational department managers to ensure and
increase equipment reliability.
. Member of the Senior Leadership Team for the Lancaster Cereal Plant
providing direction for the maintenance department.
. Promoted safety through all levels of the organization lowering
incidents 50% per year for two consecutive years.
. Familiar with SAP.
. Maintenance representative on the HACCP team.
OpSec Security, Inc., Lancaster, PA
2001 - 2011
Senior Engineering and Maintenance Manager
. Increased production efficiency by 150%. Resolved a production issue
by integrating new web handling equipment with existing to streamline
the process for a proprietary web coating.
. Reduced equipment down time by 45% by implementing a Preventive
Maintenance program for production and facility equipment. Implemented
CMMS program for equipment reliability, work order tracking, and spare
parts management.
. Managed relocation of OpSec's production facility from 15,000 SF to
57,000 SF. Responsibilities included complete design and build out of
new production facility; equipment layout and process flow; and
coordinated with all contractors. Project met scheduled time line and
was under budget. Production continued to produce at record volumes
during the relocation process with all products being manufactured and
delivered on time.
. Managed $14MM of capital projects to keep pace with sales growth from
$6MM - $40MM: ten color custom flexographic printing press, $3MM;
identification card production equipment, $2.5MM; custom coating line,
$2MM; wet web embosser, $1.75MM; high speed die cutting equipment,
$1.5MM; high speed serialization equipment, $1.25MM; 100% defect
detection equipment, $500K; and miscellaneous support equipment: Imaje
and Domino ink jet printers; and material handling equipment, $500K.
All projects delivered under budget and on time.
. Initiated and managed cost reduction projects: high-speed
serialization equipment, 100% defect detection equipment, and security
waste disposal.
. Responsible for all Electrical and Mechanical Engineering for
production operations, including collaborating with colleagues on
projects with OpSec's sister production site in the UK.
. Provided engineering and maintenance support to resolve production
issues, including all new assets and current assets totaling over
$17MM.
. Increased make ready efficiency by 25% as part of a 5S and Lean
Manufacturing implementation team.
. Managed the Maintenance Team by prioritizing work orders, scheduling
Preventive Maintenance, and assigning special projects. The team
included one Maintenance Supervisor, five Maintenance Technicians, and
two Building Custodians. Developed team goals. Identified training
needs of the maintenance team and made the necessary recommendations
to develop team members.
. Implemented safety awareness program; strategically placed safety
posters though out the production facility, published monthly safety
newsletter, and organized safety milestone awards.
. Procured all maintenance supplies and spare parts for the production
equipment. Negotiated pricing with the suppliers.
. Managed $500K maintenance budget.
. Maintained DEP operating permit.
. Coordinated with all supply and maintenance contractors to ensure
safety, security and project scope was satisfied. All projects were
completed on time and within budget. Negotiated annual agreements with
subcontractors for required services.
. Security Officer Duties: designed, implemented, and managed CCTV and
access control systems; wrote and maintained Security Manual; worked
closely with American Express and Canadian Bank Note to improve
security protocol requirements for processing security products and
managed the "annual security audit" with the clients.
. Member of the First Response Team. Certified in First Aid and CPR.
Industrial Services, Inc., Lancaster, PA
1997 -2001
Electrical Designer
. Designed electrical control systems using Allen Bradley PLC control
and Wonderware interface technology for custom automation equipment.
Managed mechanical design team to ensure customer specifications were
met while equipment reliability and optimum production efficiency was
achieved. Ensured equipment met all OSHA safety requirements.
. Updated machine control systems to improve machine performance and
reliability.
. Overhauled and relocated customer production equipment, mechanical and
electrical on a project basis.
. Managed field crews of up to 10 people.
Other Relevant Experience
Advantage Technology, Inc. (Currently OpSec Security, Inc.), Lancaster, PA
Lead Maintenance Technician / Production Supervisor
. Responsible for all electrical and mechanical maintenance.
. Responsible for all electrical engineering.
. Assist with product development.
. Designed and built several pieces of production equipment; ranging
from $15,000 to $100,000.
. Supervised 15 production employees.
RR Donnelly and Sons, Lancaster, PA
Electrician / Electrical Coordinator
. Completed Electrical Apprenticeship Program, 8/85.
. Assisted Engineering on major projects.
. Certified Facilitator in Analytical Troubleshooting.
. Responsible for four electricians, work assignments, coordinate
between production and Engineering.
. Implemented preventive maintenance programs for new equipment.
Professional development and certifications
Penn State University - Various coursework including Digital electronic,
psychology, etc.
Various technical coursed including PLC programming
Journeyman Electrician
Awards
. Eagle Scout - April 1976
. BSA District Award of Merit - April 2001