Clint Melvin

*** *** **** *****

Franklin, Tennessee 37064

615-***-****

email….********@*****.***

Tennessee CMC Full Mechanical License – 4-06-2012

Job Description: Management, Sales, Design

Job Responsibilities: Project management, sales, estimating, design, drafting, close out.

Schedules, contracts, billings and working with owners and architects. Purchase orders,

procurement and installations Sales of mechanical systems installations and P.M.

contracts.

-25 years experience in commercial, industrial, institutional (government, schools) and

retail construction

-Worked with owners, architects and other trades for coordination of jobsite changes

and/or RFP’s

-Estimated, planned, scheduled and built complete jobs from time of award until turnover

to owner.

-Tracked billing, jobcost and foreseeable savings from start of job to completion

-Work with subcontractors and their contracts…domestic and overseas.

-Sales/Marketing to building owners/partners

-Constant contact with material vendors

-Worked as site super/MEP coordinator both domestically and overseas

-AutoCAD experience with design background for HVAC, plumbing and piping

-Able to run design loads and calculations for various projects

-Familiar with government work and guidelines, international codes, commissioning of

mechanical systems.

-Worked with fuel oil, waste water treatment plants, ground wells, hydraulics and all

types of hvac and process cooling water and plumbing designs

-Material/Equipment procurment

Work history : Hired as truck driver in 1984 – 1 year – Hardy Corporation

Field work on plumbing service truck – 3 years – Hardy Corporation

Draftsman/Designer for plumbing, HVAC, HVAC piping, AutoCAD

Process piping – 7 years – Hardy Corporation

( During this time, managed the pipe pre-fab shop, producing layouts,

Spooling (pre-fab), take-off and ordering material, jobsite coordination,

jobsite visits, purchase orders, material tracking, start-up,

coordination with owners, architects and other trades)

Project manager – 6 years – Hardy Corporation

Project manager / co-ordinator – 5 years – B.L. Harbert International

Project manager / Sales – 4 years – RJ Mechanical

Broad Range in Job History:

Hanna Steel Tuscaloosa, Alabama - $350,000

(installed 12” square tubing line – hydraulics, cooling water, etc..

U.A.B. Central Plant #3 B’ham, Alabama - $3.8 million

(removal and replacement of 2ea. 2000 ton chillers and 6 ea. cooling

towers and 8 ea. double suction pumps.)

Birmingham City Jail - $320,000

(remodel and replacement of hvac equipment

Honda Alabama Manufacturing Facility - $ 2 million

(Estimate, coordinate paint shop piping package…on site

superintendent for approx. 7 months)

Alabama 4H Center Environmental Building and Lodge - $1.5 Million

(LEED Certified – Platinum) Plumbing and HVAC, Commissioning

PSC - $850,000 Stainless Steel Piping for chemical extractions from paint

Gulfport Navy Base – New Warehouse and Public Works Building

Total project cost - $ 3 million HVAC and plumbing systems

(LEED Certified – standard 26 point)

SMI Steel, B’ham, Al. – Process piping for Continuous

Caster Line, Electric Arc Furnace and Ladle Melting Station….gas,

hydraulic, grease, nitrogen, oxygen, cooling water piping.

Various Hotels HVAC and Plumbing

VA Hospital Murfreesboro TN. $ 412,000 Remodel of after surgery

Design/Coordination: AutoCAD

-layout/design central plant – 25 tons to 2,000 tons chillers, pumps,

Cooling towers

-many other central plant retofits during which the buildings remained

occupied and fully functional.

-many plumbing jobs – site, underground, sleeve layout, full design of

Complete systems.

International projects:

U.S. Embassy Tunis, Tunisia

WWTP St. Thomas U.S. Virgin Islands

Marriott – Aruba Surf Club - time-share condo complex including 4

13 story buildings with lazy river.

U.S. Embassy Rangoon, Burma

U.S. Embassy Sudan, Khartoum

U.S. Embassy Rawanda

U.S. Embassy Nigeria

U.S. Embassy Congo

U.S. Embassy South Africa

All Embassy work consisted of self contained, stand alone mechainical

system. This may have consisted of waste water treatment plant,

mechanical cooling, well water, fuel and fuel oil piping, hydraulic piping

and all plumbing systems.

Miscellaneous Credits:

- Superintendent at Honda Alabama Manufacturing Facility for a crew of

58 workers

- MEP site coordinator/superintendent overseeing a crew of 71 mechanical

workers installing condenser water, plumbing, HVAC, fire protection,

grease piping/ductwork for kitchen/pool bar, domestic water service, site

underground utilities, oversee pool subcontractor and electrical

subcontractor.

- AutoCAD

- MS Excel, Word, Outlook

- Prolog

- Timberline (limited to estimation)

- Buzzsaw

- Adobe

- I sq Ft.

- P3

Education: Graduate of Huffman High School 1983

Certificate of proficiency:

Chemical Treatment – Guardian IPCO

HVAC - Trane

Fuel Oil – Xerxes

Tennessee CMC Full Mechanical License – 4-06-2012



Contact this candidate