SUMMARY OF EXPERIENCE

As an Environmental Engineer/Cost Estimator, provided engineering support

to project and program managers on several environmental, soil &

groundwater remediation and design-build construction projects. Performed

technical evaluation of scope of work and prepared technical documents that

comply with ECC standards and applicable regulatory (EPA) requirements.

Provided on-site quality control/ health & safety support for environmental

remediation-groundwater & soil cleanup projects. Performed research and

technical assistance in preparation of cost estimates and proposals.

Reviewed project documents, prepared daily quality control reports, updated

O&M manuals, O&M reports, and annual & semi-annual air & monitoring wells

sampling summary reports. Prepared and reviewed submittal documents, as-

built drawings. Performed research on groundwater treatment systems,

preliminary design and cost estimate of ion exchange system for perchlorate

treatment. Trained and certified in QA/QC, health & safety, and value

engineering applications. Used Army Corps of Engineer's QCS software for

preparation of submittals and QC reports.

. Apply working knowledge of scientific, mathematical and engineering

principles.

. Technical writing, preparation of work plans, reports, submittals &

updating O&M manuals.

. Working knowledge of federal environmental regulations, DoD

guidelines, OSHA standards, and USACE QC protocol.

. Provide QC/H&S support as required.

. Provide technical support for various remediation/construction

proposals.

. Prepare cost estimates, perform evaluation of scope of work, quantity

take off calculations, generate RFPs for subcontractors based on

specifications, evaluation of subcontractor bids, and lead cost

estimate review for remediation/construction projects.

PROFESSIONAL EXPERIENCE (Jan 2005 - Present)

USACE Kansas City, LTRA Support at Stanton Cleaners, Great Neck, New York

(2007-Present). Prepared environmental reports for a $1.4 million LTM/O&M

project with a 75 gpm and GWETS, operated in conjunction with a SVE system.

Prepared monthly, semi-annual and annual reports for Indoor Air Quality

and Groundwater Monitoring Summary reports in compliance with applicable

regulatory requirements. Prepared cost estimates for modification of

existing contract.

USACE Kansas City PRAC, Environmental Engineer, LTO/LTM, Containment System

Remedial Action, Operable Unit No. 2, Former Nebraska Ordnance Plant, Mead,

Nebraska (2005-2010). Provided environmental support for a $17 million

remedial action TO at a superfund site with groundwater contamination at

elevated concentrations. Support project team with preparation of

technical documents that comply with applicable regulatory requirements,

including environmental protection plan, stormwater pollution prevention

plan, health and safety plan, extraction well installation plan, testing,

startup and performance demonstration plan (for Advanced Oxidation Process

System). Prepared project submittal documents. Provided on-site QC and

H&S support for extraction well maintenance and rehabilitation activities.

USACE Kansas City PRAC, Replace Wyckoff Groundwater Treatment Plant,

Wyckoff/ Eagle Harbor Superfund Site, Bainbridge Island, Washington (2007-

2009). This $8.4 task order involved removal of an existing water

treatment plant and construct a replacement plant with an influent

operating capacity of 70 gpm with future capabilities of an additional 25

gpm. Prepared work plans, prepared & reviewed project submittal documents,

and reviewed as-built drawings.

USACE Kansas City PRAC, Remedial Action Cosden Chemical Coatings

Corporation Superfund Site, Construction of Final Remedial Design, Beverly,

New Jersey (2006-2007). Provided support for a $3.2-million construction of

groundwater and soil vapor extraction treatment systems designed to treat

100 gpm of BTEX/TCE-contaminated water and subsurface vapors. Prepared

environmental and technical documents that comply with applicable

regulatory requirements.

USACE Kansas City PRAC, Main Gate House Adaptive Rehabilitation and Area

Soils Remediation. Roebling Steel Superfund Site, Roebling, New Jersey.

(2006-2009). Provided environmental support for a $6.8 million TO

involving building stabilization, select demolition, reconstruction, and

structural and architectural tasks to preserve and protect an historical

structure. Supported project team with preparation of technical documents

in compliance with applicable regulatory requirements.

NAVFAC Pacific, Various Sites (Closure of an Unrecorded Underground Storage

Tanks, Barbers Point, Oahu, Hawaii; Remove Concrete Underground Storage

Tanks, Waiawa Drumming Facility, Ewa Junction, Hawaii; Non-Time Critical

Removal Action at Former Underground Storage Tanks 50/51, Hawaii; Pearl

City Fuel Annex, Pearl Harbor, Hawaii; Non-Time-Critical Removal Action

Building 21 Former Waikele Branch, Hawaii (2005-2006). Assisted project

manager with the technical evaluation of the scope of work and preparation

of technical documents (Work plans, Quality Control Plans, Environmental

Protection Plans, and Health & Safety Plans) that comply with ECC standards

and applicable regulatory requirements.

COST ESTIMATING AND PROPOSAL SUPPORT:

. Prepared cost estimate ($581K) for the Site Investigation at New

Embassy Compound, Beirut, Lebanon. Project involves Ordnance

Characterization, Intrusive Investigation, Scrap Disposal, and

Environmental Characterization, USACE Huntsville District (2012).

. Prepared cost estimate ($1.3MM) for Time Critical Removal Action (TCRA)

project which involved surface and subsurface removal, sampling and

analysis of surface & sub-surface soil, water & sediment; installation

of monitoring wells; and MPPEH disposal for the Fort Rucker - Golf

Course, Dale County, Alabama, USACE Huntsville District (2012).

. Prepared cost estimate ($5.1MM) for Robotics Military Munitions

Response Program (MMRP) and and Other Explosives Related Services

(OERS) including range maintenance and support activities utilizing

robotic technology and/or conventional manned technologies, Eglin AFB,

FL (2012).

. Team member in preparation of cost estimate for Data Gaps

Investigation, EE/CA, Former Naval Weapons Station Seal Beach

Detachment, Concord, CA (2012).

. Team member in preparation of cost estimate for IR Site 27 Remedial

Action (RA) at the Former Naval Station Treasure Island (NAVSTA TI),

San Francisco, California (2012).

. Team member in preparation of cost estimate ($198MM) for Soil

Remediation of Contaminated Features in SEK Oil Fields, Kuwait (2011).

. Team member in preparation of cost estimate ($25MM) for Environmental

Remediation (Excavation and Construction), Da Nang Airport, Vietnam

(2011-2012).

. Prepared cost estimate ($29.94MM) for Design & Construction of Engineer

Branch School, Mazar-E-Sharif, Balkh Province, Afghanistan (USACE).

. Prepared cost estimate ($742K) for Great Lakes Restoration Initiative

(GLRI) Site Characterization, USACE Detroit District (2011-2012).

. Prepared cost estimate ($1.3MM) for Demolition/Refurbishment of Water

Towers, Former Chanute AFB, Rantoul, IL (2011).

. Team member in preparation of cost estimate for Fort Jackson Modified

Record Fire Range Removal Action/Construction Support Fort Jackson, SC

proposal.

. Team member in preparation of cost estimate for Installation Management

(ACSIM) IDIQ Task Order for Environmental Remediation Services at Fort

Lewis, WA proposal (2009).

. Research and technical assistance in the preparation for Remediation

Design at NAS Moffett Air Field proposal (2005).

. Study and Preliminary Cost Estimate for Ion Exchange System for

Perchlorate Removal Treatment. Researched and compared different

perchlorate removal treatments, estimated power requirement, resin, and

O&M costs from given water quality data and flow rate (2005).

. Technical assistance in the preparation of the Rocky Mountain Arsenal

(RMA) Basin F Wastepile Remediation proposal (2005).

EDUCATION AND TRAINING

. M.S., Environmental Engineering, Lamar University, 2004

. B.Tech., Chemical Engineering, Amravati University, India, 2001

. 40-hour OSHA HAZWOPER Training, 2005; Refresher, 2012

. 40-hour Value Engineering Module-I Training, 2008

. 40-hour Health and Safety/ Quality Control Workshop, 2009

. 10-hour OSHA Construction Safety Training, 2006

. USACE's Construction Quality Management (CQM) for Contractors

training, 2006 & 2011

. Managing Government Contracts Training, 2005

. First Aid/CPR Training, 2011

PROFESSIONAL REGISTRATIONS AND CERTIFICATIONS

. Registered Professional Engineer (Environmental) (P.E.), Arizona

(License No. 52118), 2011 - Applied for comity licensure in

additional states

. Environmental Professional Intern (EPI) Certification, Institute of

Professional Environmental Practice, 2008

. Associate Value Specialist (AVS) Certification, SAVE International,

2008

EMPLOYMENT HISTORY

. 08/2012 - Present: Environmental Chemical Corporation (ECC),

Lakewood, CO.

. 01/2011 - 07/2012: Environmental Chemical Corporation (ECC), Edison,

NJ.

. 04/2006 - 12/2010: Environmental Chemical Corporation (ECC),

Lakewood, CO.

. 01/2005 - 04/2006: Environmental Chemical Corporation (ECC),

Burlingame, CA.