Post Job Free
Sign in

Technician Experience Power Plant And Oil and Gas,Refinery

Location:
United States
Posted:
February 12, 2013

Contact this candidate

Resume:

Philippe ROTS

Technician Expert

Date of Birth: 26/06/1959

Nationality: French

Marital Status: Married, 1 children

Mobility: WorldWide

Availability: Immediatly

Languages: French,Spanish,English

EDUCATION

• Technical Expert in refinery operation (Total SA ) 2005.

• Superintendent of refinery (Total Sa) 1999

• A Level F3 Electrotechnical in Shool Profesionnal of Industies Dunkirk 1978

SUMMARY

For almost thirty years J have worked in Total SA in different charge as Technical Expert in refinery operations.

J have a expert level operating experience using the following technologies/processes:

Primary Upgrading,Gas Recovery Units,Diluent Recover Units,Vacuum Units,Atmospheric and Vacuum

Distillation. Centrifugal Compressor.Hydrotreating plants,Hydrogen Plants,(steam methane reformer,pressure

swing adsorption unit)Sulphurs plants, Modified Claus Process Sulphur Units,Super Claus Tail Gas Treating

Units,Amine Tail Gas Treatment,Amine units, Sour Water Treatment.

During my professional career,J have proved my capacity to manage a operate team in refinery as commissioning

team for the start up of refinery plants.

Beside my management capacity, J have proved numerous technical abilities and knowledge as:

Health,environment,safety policy,fire fighting,work permit,coordination work permit in Shut-down of

refinery,control room,supervising of team operation in refinery.

PROFESSIONAL EXPERIENCE

08/12 to 10/12

EPC Group Enegy for Iran National Oil Company

Site: Refinery Shazand Iran

Charge: Consultant/Supervisor Start-Up Plants RCD and FCC

07/10 to 07/11

Total SA

Site: Petrocedeno Venezuela PDVSA

Charge: Technical Adviser for the

Hydotreating,Sulphur,Hydrogen,Sour Water,Steam Boilers,Demineralization,Amines plants

Water treatment plants

02/08 to 07/10

Total SA

Site: Refinery Grand-puits

Charge: Shift Superintendent of refinery

Manage the operations of refinery in shift and supervising the application of the rules and safety policy.

PROFESSIONAL EXPERIENCE

10/07 to 01/08

Total SA

Site: Technip Rome Project “Jubaï” ARAMCO/TOTAL

Charge: Technician consultant

Participation has the elaboration of reviews HAZOP for the plants DHC MHC SRU SWS HMU

STEAM BOILERS

06/07 to 09/07

Total SA

Site: Refinery Weppec project DALIAN CHINA

Charge: Management of the local team (chinees) in the step of final commissioning and start-up plant DHC.

Technical assistance

03/07 to 05/07

Total SA

Site: Refinery DONGES

Charge: Oversee and organize the teams technique local of the refinery during the phase of shutdown.

Oversee the application of the health and safety policy during this step.

04/06 to 02/07

Total SA

Site: Refinery Total Gonfreville project D.H.C (France)

Charge: Organize and oversee the operations of Post-commissioning/Commissioning with the teams

technicians local.

Oversee the teams of post Start-up and start up with the TECHNIP teams and Total teams of refinery

operations.

01/06 to 03/06

Total SA

Site: Refinery La MEDE (France)

Charge: Oversee and organize the teams technique local of the refinery during the phase of shutdown.

Oversee the application of the health and safety policy during this step.

06/05 to 12/05

Total SA

Site: FPSO Dalia (Koree) Project Dalia for Sonangol

Charge: Management of the local team (Sonangol) in the step of final commissioning and start-up topside

plants.

Technical assistance.

02/01 to 05/05

Total SA

Site: Sincor (Venezuela)

Charge: Training of technicians of the plants: SULFUR,SWS,TGTU,HMU,HOT OIL,DEA.

Organize and oversee the operations of Post-commissioning/Commissioning

Oversee the teams of post Start-up and start up of plants.

Shift Supervisor of this plants.

PROFESSIONAL EXPERIENCE

01/00 to 01/01

Total SA

Site: Refinery Dunkirk (France)

Charge: Training Coordinator for the future technicians of FCC,CDU,VDU,Gazoline MEROX,GPL MEROX

KEROX,SULFUR,STEAM BOILERS,POWER PLANT,WATER TRATMENT,DGO etc

01/95 to 31/00

Total SA

Site: Refinery Dunkirk (France)

Charge: Technician control room of FCC,VDU,MEROX,Steam Boilers,Water Treatment Plants,

Power Eletricity Product.

01/90 to 31/94

Total SA

Site: Refinery Dunkirk (France)

Charge: Technician control room of plants CDU,DHT,KEROX,DEA,SULFUR,DGO,REFORMING

01/85 to 31/89

Total SA

Site: Refinery Dunkirk (France)

Charge: Technician operation of plants FCC,VDU,MEROX,Steam Boilers,Water Treatment Plants,

Power Plant Electricity.

01/80 to 31/84

Total Sa

Site: Refinery Dunkirk (France)

Charge: Technician of operation and commissioning/start up of FCC plant

01/79 to 31/79

Total Sa

Site: Refinery Dunkirk (France)

Charge: Technician of plants offsite:



Contact this candidate