General Laborer / Construction / Auto Mechanic (Midlothian - Dallas - Fort Worth)
Date: 2012-11-07, 12:10PM CST
see below
Art Quintero
**********@*****.************:
My goal is to obtain a full-time position with a well-reputed company where I will be able to apply my experience and skills to help with the company's advancement and growth. I am a Laborer with over 6 years' experience in many physical tasks including building, construction, and demolition sites. I am expedient in manual and analytical skills. Along with being in excellent physical shape and having good stamina, I am also unafraid of heights. I work well in a team-environment as well as being mentally disciplined to work alone. Safety is a priority at all times. Experience and Skills:
AC, Brakes, Transmission CertifiedProfessional Experience:
Fowler Transportation Glen Rose, TX
March 29, 2012 -- PresentAlign level and anchor machinery and hook up cables for the crane operators to move large and heavy oil rigs. Assist in the set up for processing and repairing of rigs as well as helping with scaffolding, platforms, tripods and derrick moving. Work with cables and ropes that are used mainly for hoisting heavy objects. Flagging and directing trucks for loading.
Ross Orthodontics Midlothian, TX
January 2010 -- March 2012Ensuring orders and prober measurement to build cabinets for orthodontist offices. Used a table saws and miter saw to cut and build cabinets. Installed air and water instruments into the cabinets. Cleaning and inspecting the cabinets for proper use and safety; preparing them to be shipped out and installed into the orthodontic offices. Helped with deliveries and installation of cabinets at the site in various environments at the sites Installing, securing, and inspecting cabinets according to safety measures.
Ash Grove Cement Midlothian, TX
May 2006-May2009Cleaning and preparing sites and excavations, digging trenches, erecting scaffolding, removing rubble and debris, and other duties as assigned on the yard crew. Performed physical labor for heavy equipment operation including shovelingand dump truck driving. Performed all duties to ensure the proper flow of the kilns. Experience on Bobcat's to pick up the heavy debris along with a hammer bit for cleanup process. Welding for the maintenance crew for repairs of the kilns. Used concrete cutter for cutting out bad patches of concrete that needed to be replaced. Education:
Midlothian High SchoolDiploma, 1999 Lincoln Tech InstituteCertified Auto Mechanic, 2006
Construction laborers, general laborer, construction, crane, oil rigs, derrick, platforms, Laborer, Construction Laborer, Cement Finisher, Construction Worker, Helper, Post Framer, Curb and Gutter Laborer, Drain Layer, Drop Crew Laborer, Punch Out Crew Member, Concrete Laborers Construction Assistant Construction Coordinator Construction Engineer Construction Foreman Construction Manager Construction Superintendent Construction Supervisor Construction Worker Contract Administrator Contract Manager Crane Operator Dry Wall Finisher Dry wall Installer Estimator Electrician Equipment Operator Field Engineer Framing Carpenter General Laborer Inspector Iron Worker