I am a self starting professional instrumentation technician with over 18 years of experience in supervision of pipefitter and instrumentation techs. I have 13 years of working with smart instruments and I have commissioned 8 power plants into new construction. My job titles have been everything from foreman tech to superintendent and I have worked in power plants from Iowa to Illinois, Indiana, to Missouri.

Educational Background:

High School Dipolma from Local 562 Pipefitters, Lake St Louis MO 1/2001 to 8/1993 (Pipefitter)

Job History / Details:

Executive Summary

I am a self starting professional instrumentation technician with over 18 years of experience in supervision of pipefitter and instrumentation techs. I have 13 years of working with smart instruments and I have commissioned 8 power plants into new construction. My job titles have been everything from foreman tech to superintendent and I have worked in power plants from Iowa to Illinois, Indiana, to Missouri.

Core Qualifications

ISA level 1

EPRI level 1,2 and administrator

Teacher local 562 instrumentation

Ovation experience

Yokogawa trained

Rosemont trained

Have experience running loop checks

Have been in charge of commissioning 5 power plants

Technical problems-solving guidance

Work well in diverse team environment

Written and verbal communication skills

Complex problem solving

Professional Experience

March 2012 to July 2012

Sachs Fenton, MO

I/C Tech Foreman

Commissioned Merom power plant in Merom Indiana for Hoosier Energy that included a new back half for 1unit and new ball mill as well.

November 2011 to March 2012

J Givoo Consultants NJ

I/C Tech

Performed work which involves conventional engineering practices, but includes a variety of complex features, such as conflicting design requirements, non-standard materials and difficult coordination requirements.

August 2010 to October 2011

Sachs ST. Louis, MO

Superintendent

I was responsible for the installation,location,and calibration of all the instrument s at the Edwardsport Duke plant.

April 2010 to August 2010

Bechtel Marissa, IL

Tech

I was the lead tech for Bechtel at the Lively Grove power plant 2 800 megawatt units. I was in charge of all calibration of all instruments for both units.

October 2008 to August 2010

Sachs ST. Louis, MO

Lead Tech

I was in charge of calibration and commissioning of all the instruments for Ameren Power plants in Canton IL and Coffeen IL. Both of these units have added on the latest scrubbers and I was involved in all aspects of the instrumentation.

August 2007 to October 2008

ANW Refrigeration Cape Girardeau, MO

Refrigeration Tech

I was in charge of installing new equipment in stores in Missouri, Illinois, and Tennessee. We would tear out the old equipment at night and have new equipment installed by morning.

April 2007 to August 2007

Murphy ST. Louis, MO

Foreman

Remodeled Chrysler in Fenton missouri I was in charge or 20 pipefitters.

January 2007 to April 2007

Haberberger ST. Louis, MO

Design pipefitter

I was in charge of designing the new lube oil lines for the main steam lines in the New Madrid power plant.

Education

1993 Local 562 Pipefitters ST. Louis, MO

Journeyman pipefitter Pipefitter

Affiliations

Member of ISA since 1999

Member local 562 since 1988

EPRI administrator since 2001

Plumbing license

Welding certs

Medical gas license

References

Brent Lee

Sachs Automation

Superintendent

314-***-****

Dan Rohrs

Ameren Illinois

I/C Supervisor

618-***-****

William Schreckengost

Sega Inc.

Field Control specialist

814-***-****

John Vonwoy

Hiatachi

Engineer

908-***-****