Posted/Modified
Title:
Scheduler
e-mail:
***********@*****.***
Phone:
Industry:
Industrial
Desired
Location:
Any
Willing
to Relocate:
No
Desired
Salary:
> $105,001/yr
Brent L. Dowers
5015 Arrowhead Drive Baytown, TX 77521
***********@*****.***
SUMMARY
I have 22 years experience in the piping industry, with 14 years in Management and 7 years in Systems Turnover. My background includes Supervision, Inspection, Modular, Refineries, Chemical, Petroleum, Maintenance, Projects, and new construction.
EXPERIENCE
2012 ? Present S&B Engineering (Capitol Projects) Houston, TX
Lead Scheduler (Lyondell Basell Channel View, TX)
? Interface the construction schedule with the engineering schedule
? Review and oversight of contractor?s schedules for assigned work scope
? Establish schedule structure per project WBS, defines activity codes, layouts and reports to be produced
? Load the schedule with resources to generate time phased, leveled resource plans
? Analyzes progress and resource usage against project baseline. Produces reports as directed by the Project Controls Manager
? Provide reports of key performance indicators for the project planning and scheduling functions
2012 ? 2012 Shaw Group (Maintenance) Houston, TX
Construction Manager Coordinator (Marathon Texas City, TX.)
? Oversee the construction project to start to finish
? Performed a key role in project planning, budgeting, and identification of resources needed
? Ensured that construction activities move according to predetermined schedule
? Periodic inspection of construction sites
? Ensured project documents are complete
2011 ? 2012 SNC-Lavalin (Aromatics and BOP Project) Baytown, TX
Planner / Jr. Scheduler System Turnover Coordinator (ExxonMobil Baytown, TX)
? Prepared and managed all Hydro, Civil, Structural, Equipment and System packages
? Identified pre- and post turnaround work
? Analyzed work order structures
? Reviewed schedules from contractors to ensure dates are met
? Provided weekly progress reports
? Maintained turnover dossiers and transfer care custody and control documentation
? Supported system walk-downs, punch-list closure, and turnover acceptance efforts
2011-2011 Becht Engineering (Algae Project) Baytown, TX
Planner / Jr. Scheduler System Turnover Manager (ExxonMobil Baytown, TX)
? Prepared and managed all Hydro, Civil, Structural, Equipment and System packages
? Identified pre- and post turnaround work
? Analyzed work order structures
? Reviewed schedules from contractors to ensure dates were met
? Provided weekly progress reports
? Maintained turnover dossiers and transfer care custody and control documentation
? Supported system walk-downs, punch-list closure, and turnover acceptance efforts
2010-2011 LWL, Inc.(MEK Project and NRD) Baytown, TX
Field Planner (ExxonMobil Baytown, TX)
? Planned work flow for each operation and scheduled Turnarounds
? Prepared production schedules
? Analyzed specifications and performed mathematical calculations that determined production process, tools and human resource requirements
? Walk-down packages
? Lead detailed preparation of Construction work packs
? Provided site staff with necessary field schedules (look-ahead plans, schedule updates, what-if analysis, etc.)
? Determined if materials need to be purchased and submit request to Material Coordinator
2008-2010 Jacobs Engineering (Eclipse Project, NSR Project) Baytown, TX
Systems Turnover Coordinator/Field Engineer (ExxonMobil Baytown, TX.)
? Managed all hydro and system packages using IMS and Prolog database
? Attended all system turnover meetings with the client
? Worked with numerous subcontractors and maintained their documents for client to turnover
2007-2008 Bay Ltd. Shreveport, LA
QC Manager/Planner
? Prepared and managed all Hydro, Civil, Structural, Equipment and System packages
? Managed and documented all NDE, weld reports, and hydro?s
? Managed Document Control
? Coordinated quality assurance and quality control activities on the project site
? Oversee all walk down?s, inspection and sell off of completed packages
? Final review of all packages insuring all documentation is correct
2005-2007 Performance Baton Rouge, LA
System Turnover Manager/ Planner
? Prepared and managed all Hydro, Civil, Structural, Equipment and System packages
? Managed RFI?s, document control and subcontract coordination
? Attended all System Turnover meetings with the client
? Provided weekly progress reports
2003-2005 LWL, Inc. Baytown, TX
Maintenance Supervisor (ExxonMobil Baytown, TX)
? Managed all Pipe Crews
? Verified projects were completed
? Verified timesheets
EMPLOYMENT HISTORY
? JE Merit Pipe Supervisor 2001-2003
? Foster Wheeler Pipe Supervisor 2000-2001
? S&B Engineering Pipe Supervisor 1998-2000
? MECI Pipefitter 1995-1998
? Jacobs Instrument Fitter 1994-1995
? US Army Platoon Sergeant 88M/77F 1991-1994
Shipping and Receiving Manager
EDUCATION
Short Courses
P7 Primavera, NCCR, 88M and 77F
REFERENCES
? Joe Carey, ExxonMobil Project Manager 832-***-****
? Kevin Nalley, ExxonMobil Supervisor 713-***-****/281-***-****
? Jasondre Hudson, ExxonMobil First Line Supervisor 281-834-022
? Steve Barnett, Jacobs Construction Site Manager 281-***-****
******@***********.***
Copyright © 2003-2005 Cooper Pugeda Management, Inc. All rigths reser