Post Job Free
Sign in

Manager Project

Location:
Houston, TX
Posted:
October 14, 2012

Contact this candidate

Resume:

Posted/Modified

on: **/**/**** **:** PDT

Title:

Scheduler

e-mail:

***********@*****.***

Phone:

832-***-****

Industry:

Industrial

Desired

Location:

Any

Willing

to Relocate:

No

Desired

Salary:

> $105,001/yr

Brent L. Dowers

5015 Arrowhead Drive Baytown, TX 77521

***********@*****.***

832-***-****

SUMMARY

I have 22 years experience in the piping industry, with 14 years in Management and 7 years in Systems Turnover. My background includes Supervision, Inspection, Modular, Refineries, Chemical, Petroleum, Maintenance, Projects, and new construction.

EXPERIENCE

2012 ? Present S&B Engineering (Capitol Projects) Houston, TX

Lead Scheduler (Lyondell Basell Channel View, TX)

? Interface the construction schedule with the engineering schedule

? Review and oversight of contractor?s schedules for assigned work scope

? Establish schedule structure per project WBS, defines activity codes, layouts and reports to be produced

? Load the schedule with resources to generate time phased, leveled resource plans

? Analyzes progress and resource usage against project baseline. Produces reports as directed by the Project Controls Manager

? Provide reports of key performance indicators for the project planning and scheduling functions

2012 ? 2012 Shaw Group (Maintenance) Houston, TX

Construction Manager Coordinator (Marathon Texas City, TX.)

? Oversee the construction project to start to finish

? Performed a key role in project planning, budgeting, and identification of resources needed

? Ensured that construction activities move according to predetermined schedule

? Periodic inspection of construction sites

? Ensured project documents are complete

2011 ? 2012 SNC-Lavalin (Aromatics and BOP Project) Baytown, TX

Planner / Jr. Scheduler System Turnover Coordinator (ExxonMobil Baytown, TX)

? Prepared and managed all Hydro, Civil, Structural, Equipment and System packages

? Identified pre- and post turnaround work

? Analyzed work order structures

? Reviewed schedules from contractors to ensure dates are met

? Provided weekly progress reports

? Maintained turnover dossiers and transfer care custody and control documentation

? Supported system walk-downs, punch-list closure, and turnover acceptance efforts

2011-2011 Becht Engineering (Algae Project) Baytown, TX

Planner / Jr. Scheduler System Turnover Manager (ExxonMobil Baytown, TX)

? Prepared and managed all Hydro, Civil, Structural, Equipment and System packages

? Identified pre- and post turnaround work

? Analyzed work order structures

? Reviewed schedules from contractors to ensure dates were met

? Provided weekly progress reports

? Maintained turnover dossiers and transfer care custody and control documentation

? Supported system walk-downs, punch-list closure, and turnover acceptance efforts

2010-2011 LWL, Inc.(MEK Project and NRD) Baytown, TX

Field Planner (ExxonMobil Baytown, TX)

? Planned work flow for each operation and scheduled Turnarounds

? Prepared production schedules

? Analyzed specifications and performed mathematical calculations that determined production process, tools and human resource requirements

? Walk-down packages

? Lead detailed preparation of Construction work packs

? Provided site staff with necessary field schedules (look-ahead plans, schedule updates, what-if analysis, etc.)

? Determined if materials need to be purchased and submit request to Material Coordinator

2008-2010 Jacobs Engineering (Eclipse Project, NSR Project) Baytown, TX

Systems Turnover Coordinator/Field Engineer (ExxonMobil Baytown, TX.)

? Managed all hydro and system packages using IMS and Prolog database

? Attended all system turnover meetings with the client

? Worked with numerous subcontractors and maintained their documents for client to turnover

2007-2008 Bay Ltd. Shreveport, LA

QC Manager/Planner

? Prepared and managed all Hydro, Civil, Structural, Equipment and System packages

? Managed and documented all NDE, weld reports, and hydro?s

? Managed Document Control

? Coordinated quality assurance and quality control activities on the project site

? Oversee all walk down?s, inspection and sell off of completed packages

? Final review of all packages insuring all documentation is correct

2005-2007 Performance Baton Rouge, LA

System Turnover Manager/ Planner

? Prepared and managed all Hydro, Civil, Structural, Equipment and System packages

? Managed RFI?s, document control and subcontract coordination

? Attended all System Turnover meetings with the client

? Provided weekly progress reports

2003-2005 LWL, Inc. Baytown, TX

Maintenance Supervisor (ExxonMobil Baytown, TX)

? Managed all Pipe Crews

? Verified projects were completed

? Verified timesheets

EMPLOYMENT HISTORY

? JE Merit Pipe Supervisor 2001-2003

? Foster Wheeler Pipe Supervisor 2000-2001

? S&B Engineering Pipe Supervisor 1998-2000

? MECI Pipefitter 1995-1998

? Jacobs Instrument Fitter 1994-1995

? US Army Platoon Sergeant 88M/77F 1991-1994

Shipping and Receiving Manager

EDUCATION

Short Courses

P7 Primavera, NCCR, 88M and 77F

REFERENCES

? Joe Carey, ExxonMobil Project Manager 832-***-****

? Kevin Nalley, ExxonMobil Supervisor 713-***-****/281-***-****

? Jasondre Hudson, ExxonMobil First Line Supervisor 281-834-022

? Steve Barnett, Jacobs Construction Site Manager 281-***-****

******@***********.***

Copyright © 2003-2005 Cooper Pugeda Management, Inc. All rigths reser



Contact this candidate