A.Amir Ali
Email: *********@********.***
Address: ***** ***** *****
City: Granada Hills
State: CA
Zip: 91344
Country: USA
Phone: 818-***-****
Skill Level: Management
Salary Range: 110
Primary Skills/Experience:
See Resume
Educational Background:
See Resume
Job History / Details:
A. Amir Ali,
aaiaaiaaiaaiaaiaaiaaiaaiaaiaaiaaiaai
Summary of Relevant Qualification
A Senior Architect, Project/Construction Manager with wide-ranging and progressively responsible experience in hospitality, healthcare, aviation, educational, energy and institutional projects. Possesses ability to: communicate (well) verbally and in writing, assemble, co-ordinate and direct all administrative, technical and professional teams. Has set up constructability review criteria for numerous types of projects and has managed multiple staff and disciplines during performance of Value Engineering. Has helped save clients costs with detailed and effective pre-construction management, value engineering and delivering projects that would come within budget and schedule. Has set performance objectives for all team members from conception, planning, design, construction and closeout through renovation, operations and maintenance of facilities. Managed contractual and technical issues with consultants and contractors during planning, design, maintenance and operation of buildings. Experienced in getting approvals from public agencies such as DSA and OSHPD. Prepared RFQ packages for procurement of consultants for design services. Worked several years with the Army Core of Engineers on their multi-million dollar government contracts.
Work Experience
2008 aaiaii 2010 Senior Architect - Fluor Corporation
Embedded with ElectroProjekt RDI (Russian Design Institute) starting November 20th aaiEi08 in Kazan, Russia.
aai Review and supervise the progress of the RDI and contractor,
aai Liaise between Fluor, Houston, the RDI and the contractor,
aai Have on-going meetings with RDI to discuss the schedule and any issues that arose,
aai Coordinate Office Centeraaiais documents with the RDI drawings,
aai Review in detail and comment on the RDIaaiais construction documents,
aai Review the RDIaaiais final drawings, sign them and have them send the drawings to be entered into POL.
aai Check the Technical Passport that the RDI produces.
aai Represent RDI on construction site to ensure that work occurred in compliance with Approved Design and Specifications.
The following was the scope of my daily responsibility:
aai Provided RDI with In-put data (e.g. Coordinates, Orientation and Elevations, Layout of building with room names, room requirements, fire and explosion requirements, safety categories, etc.).
aai Reviewed schedule prepared by RDI and updated it periodically.
a) Progress
aai Daily reviewed RDI drawings development (for each building).
aai Prepared weekly Progress Reports.
aai Reviewed progress against schedule.
aai Warned potential slips in Schedule and work out a solution.
aai Monitored and proposed solutions.
b) Reviews
aai Reviewed drawings and documents submitted by the RDI
aai Made comments, corrections and returned to RDI
aai If necessary, provided data supporting comments and corrections
aai Reviewed incorporation of comments and corrections
aai Monitored correct information in drawing title Block ( Rev 0, Rev A, Rev1 )
aai Review and approve to PROCEED with the work (IFA, IFC)
aai Review POL to ensure the drawings issued are included in the Database
aai Reviewed Vendor data (when available) against info in drawings
c) Reports
aai Prepared and Reviewed Weekly Report.
aai Responded to RFI (Request for Information) from client, construction, etc.
aai Responded to inquires from RDI, Clients, etc
d) Meetings
aai Attended Client meetings (when required)
aai Attended Liaison meetings with RDI
2004 - 2008 Architect / Construction Administrator and Manager - URS Corporation
aai Assigned to work in an advisory capacity on Sohar Fertilizer Plant in Sohar, Oman. The plant was constructed but not in operation and awaiting corrections to be made to the reinforced concrete members that showed signs of stress. My responsibility involved review, approval and management of administration/construction of design changes to mitigate cracks in concrete columns due to structural stress. Attended project meetings to review schedule, quality and safety issues, and any remedial measures required and that work occurred in accordance with the project Deed, Approved Design and Specifications.
aai Construction Manager for a 390 bed Veterans Administration Hospital. The hospital comprised of 3 four storey and 2 four storey type 1 buildings in West Los Angeles. Performed Construction Management functions of coordinating information between the architectural, structural, civil, mechanical, plumbing and other consultantsaaiai construction documents to help prevent delays and enable the project to come with in budget and schedule. This also included reviewing Shop Drawings and responding to the Contractoraaiais Requests for Information and Change Orders. Alerted contractor about safety issues.
aai Assigned to Hurricane Katrina Recovery & Response Team in New Orleans. Lead a team of 19 architects & engineers assessing condition survey and repair solutions to over 300 City of New Orleansaaiai medical clinics, city owned school facilities damaged by the hurricane.
aai Estimated damage in excess of $300,000,000. Worked with applicants in association with Historical and Environmental professional teams. Coordinated scope and design work with the Mayoraaiais office. Performed Constructability Reviews and Bid Reviews on key projects
aai Managed construction projects for Los Angeles Unified School District Schools and Facilities. Project Manager for existing facilities. Did Construction Management for 9 existing schools that needed fire alarm system upgrade, safety and technology, HVAC, CCTV and Lunch Shelters Performed constructability reviews for numerous projects in Regions 4 and 5.
aai Helped develop and revise existing San Bernardino School Construction Specifications.
aai Senior Team Member for Program Management for Sky Harbor Airport in Phoenix, Arizona
2002 aaiaii 2004 Consulting Architect
Designed medical practitionersaaiai offices, commercial and residential projects.
1997 aaiaii 2001 Supervising Architect aaiaii Parsons
aai Lead member for performing a Condition Survey for Long Beach School District for Bond Funding. Visited over 100 district schools to document architectural, mechanical, HVAC and structural components that needed replacement, upgrade or compliance with prevailing Codes and Standards.
aai Assigned as a consultant to the LA County for their seismic upgrade for the NPC2 program of all six county hospitals. Reviewed Structural Consultantsaaiai construction documents.
aai Worked as a manager with the Parsons/Fleming Program Management team in New Orleans, Louisiana for Orleans Parish School Board Capital Improvement Project. Coordinated the work of 9 Construction managers. CIP involved improvements to 98 facilities.
aai Assigned to the Moscow office and worked for a year on development of scheduling, planning, designing and renovation and upgrade of seven kindergarten through high school facilities for the Russian government.
aai Participated in a QA/QC programs for: a) Russian Demilitarization project. Was responsible for the architectural component of the Construction Documents b) Water Project for the Govt. of Peru. c) Several LAUSD Schools.
aai Worked on a construction document package of Oil and Infrastructure facilities for Aramco, Saudi Arabia. Did design development of buildings that included administration, operation center, technical center, workshop, training center, fire station, substations and canteen.
1995 aaiaii 1997 Senior Supervising Architect - Parsons/Brinkerhoff,
Worked on a FEMA project to assess earthquake damage and determine eligibility and funding issues at California State University, Northridge, Cal-Arts School of Design and several LA Archdiocese K-12 Schools.
1993 - 1994 Campus Architect, California State University, Northridge,
Responsible for Design, Planning and Construction Management on a number of new and existing campus facilities which were damaged by the earthquake. Provided procurement assistance for construction and supervision of construction schedules and budgets. Liaison between the University and Federal Emergency Management Agency for buildings damaged by the Northridge Earthquake.
1992 - 1993 Project Manager, CSU Office of Physical Planning & Development.
Design, planning and construction management and administration services for a $22 million Theater Arts Complex, Museum and several other university projects.
1990 - 1992 Project/Const. Manager / Architect, Bobrow/Thomas Architects
Responsible for a $40 million VA Out-Patient facility in downtown LA, Bakersfield Memorial Hospital and Mission Viejo Regional Medical Center. Obtained OSHPD approvals and provided assistance for procurement services of general contractors. Responsible for contractual and technical issues with consultants.
1984 - 1990 Architect / Project Coordinator, Ellerbe/Becket, Architects
Responsible for the Renovation of Biological Sciences building at UC Irvine. The scope included upgrades of lecture halls, cafeteria, administration areas, laboratories and research facilities. Also responsible for the CD packages for the 1st Interstate Tower (73 stories), Library addition to the USC library, Sheraton Hotel in Cerritos, California and Universal Studio theme buildings in Orlando, Florida.
Education
aaii School of Fine Arts & Architecture aaiaii India 1961 - 1966
Diploma in Architecture
aaii Cornell University 1969 - 1972
Master of Planning and Architecture
aaii UCLA 1996
Construction Management Course
aaii Parson/Brinkerhoff - 1996
Project Manager Certification Course
Registration / Affiliations
aaii Registered Architect in California
aaii American Institute of Architects
Foreign Languages
aaii Russian aaiaii Able to read and speak
aaii Hindi aaiaii Able to read, write and speak
aaii Arabic aaiaii Able to read.
Experience in Airports and Airline Terminal Facilities
LAX International Terminal: PDSW - Pereira, Dworsky, Sinclair & Williams
A Job Captain responsible for:
aaii Construction Documents package for the LAX International Terminal.
aaii Design and drawing package of the Baggage Handling System
aaii Passenger loading bridges and terminal entry locations
aaii 400 hertz Power Supply System to the airplanes
aaii Fuel hydrant locations at the plane docking area
aaii Airplane Guiding Lighting system
During the Construction
Phase served as an on-site
Construction Administrator
aaii Managed the Construction Administration team
Bob Hope Airport, Los Angeles: Daniel, Mann, Johnson and Mendenhall
aaii A Senior Team Member for the Vehicular Traffic System design.
Sky Harbor Airport: URS Corp.
Phoenix, Arizona
aaii Senior Team Member for Program Management.
Experience in Construction Management
aaii The 6 LA County hospitals for seismic upgrades
aaii Veteran Administration Out-Patient building, Los Angeles
aaii New 6 building VA hospital complex, West Los Angeles
aaii Crown Plaza Hospital, Mission Viejo
aaii Bakersfield Memorial Hospital, Bakersfield
aaii Charles Luckman Performing Center,
California State University, LA
aaii Oviatt Library & 16 University Park Apartment buildings
at California State University, Northridge
aaii The 6 LA County hospitals for seismic upgrades
aaii 9 LA Unified School buildings
aaii Led a team of 9 Construction Managers New Orleans Parish School Districtaaiais Capital Improvement Project.
aaii Fertilizer Plant in Sohar, Oman