Post Job Free
Sign in

Project Construction

Location:
Houston, TX
Posted:
October 17, 2012

Contact this candidate

Resume:

Posted/Modified on: **/**/**** **:** PDT

Resume Title:

Lead Planner/Scheduler

Contact e-mail:

*****.*******@*****.***

832-***-****

Industry:

Primarily Oil & Gas. See resume for other industr

Desired Location:

Houston & surrounding area.

Willing to Relocate:

No

Desired Salary:

> $105,001/yr

Resume:

Richard M. Leonard

15807 Taut Ct.

Crosby, TX. 77532

Home Phone: 281-***-****

Cell Phone: 832-***-****

Position: Planner/Scheduler

Education: Quality Control, San Jacinto College, Pasadena, Texas.

Continuing Education, Wallace College, Dothan, Alabama.

Continuing Education, Troy State University, Dothan, Alabama.

Short Courses:

Finest Hour (Advanced) Training - By Primavera Systems

P3 for Windows (Advanced) Training - By Primavera Systems

Advanced Cost and Schedule Control - By AACE

P3e/c Course #102 (3 days) ? By Commint

P5 Course (3 days) ? By Commint

Affiliations: American Association of Cost Engineering (AACE)

Personal Summary:

I have thirty four years of EPC experience in the petroleum, chemical, pharmaceutical,

steel making, mining and boiler industries. Responsibilities for the last twenty three

years include planning and scheduling new construction projects, revamps, turnarounds and

refinery commissioning. I can provide progress measurement, productivity analysis, cost

reports, manpower forecast's along with shutdown and startup schedules. Prior to working

in project controls I worked as a pipefitter, welder, field supervisor, and welding

inspector on both new construction and maintenance projects.

I'm proficient with the

following software: Primavera (P3 & P6), Open Plan, Microsoft Office (Excel, Word, Access,

Power Point).Representative Projects:

. Lead Planner/Scheduler for the Non Road Diesel - NRD (OSBL) Project at ExxonMobil in

Baytown, TX. Provided level four (detailed) constructio n schedule. Conducted weekly

schedule update meetings. Provided Monthly critical path analysis and progress reports,

along with work around/recovery plan schedule?s when needed.

. Lead Scheduler at the Motiva, Crude Expansion Project (Power Station 4) in Port Arthur,

TX. Worked three months in the home office on the engineering schedule. Moved to the field

and refined the existing schedule and monitored weekly progress. Prepared daily ?Plan Of

the Day? (POD) schedules. I provided work-around/recovery schedules when need (we had late

material problems). Project was shutdown due to the reduction in oil prices.

. Project Controls Lead at the Shell Refinery in Deer Park, TX. Assumed responsibility of

the construction management schedule and cost responsibility of the new administration

building.

.

Lead Planner/Scheduler at the BP Refinery in Texas City, TX. Worked with Production

Planners and Unit Supervisors to prepare and maintain commissioning schedule for startup

of the refinery and chem plant after hurricane Rita. Integrated schedules from turnaround,

maintenance and capitol projects with operations startup activities. Prior to that I

prepared and maintained numerous EPC schedules for small and mid-cap projects in the

refinery and chemical plant. Conducted interactive planning sessions at various stages of

projects. Worked closely with project engineers, discipline leads and construction

coordinators to prepare, update, and monitor progress.

. Planner/Scheduler for Eli Lilly T100 - 5th Unit of Capacity Project in Lafayette, IN.

Worked with Cincinnati office engineer's and lead designer's to develop level 2

construction schedule prior to mobilization. Continued to provide additional detailed

construction schedules as engineering advanced. Project scope was reduced by Eli Lilly

corporate office. Construction program management team was released.

. Turnaround Planner/Scheduler at ExxonMobil Refinery in Baytown, TX. Worked with

ExxonMobil turnaround planners, execution supervisors, operations personnel and in-house

contractors to plan, estimate and prepare detailed resource loaded schedules. Worked with

client and contractors to develop a comprehensive manpower plan. Assisted with logistics

of turnaround (heavy equipment, material and tool's). Input progress daily and published

look-ahead schedules. Monitored progress, productivity, critical and sub-critical paths.

. Planner/Scheduler for Bayer?s Plastics Expansion Projects in Baytown, TX. Worked with

engineering discipline leads to prepare detailed engineering schedules for five expansion

projects. Setup cost reports for all five projects and turned over to cost engineer.

Updated schedules during weekly meetings and published electronic copies for project team

reference. Prepared progress curves and manpower forecasts by discipline for each project.

. Planner/Scheduler for Hovensa?s FCC Unit shutdown in St. Croix, USVI. Reworked detailed

man loaded schedule from previous T/A. Worked with other T/A planners and cost engineers

to update schedule daily in order to provide progress and productivity measurement by

unit. Developed work-around schedules with plant maintenance planners and other specialty

contractors. Assisted area superintendents, plant inspectors, maintenance supervisors and

unit engineers with planning and execution of work.

. Project Controls Leader for Bayer?s ?Makrolon? Shutdown in Baytown, TX. Developed and

monitored EPC schedules for forty three capitol projects which were completed in a

thirteen day shutdown. Continuously monitored contractors progress and critical path

during turnaround. Worked with management team to develop work around schedules. Reported

progress and system turnover status at daily meetings. After completion of T/A, I assisted

the Corporate Engineering Department managers with development of a long range engineering

manpower forecast for seven major upcoming expansion projects at the Baytown facility.

. Planner/Scheduler for construction management of Shell-Norco?s Olefins Debottlenecking

Project in Norco, LA. Compiled all sub-contractors schedules into a master project

schedule. Monitored each contractor?s progress. Held coordination meetings with multiple

lump sum contractors twice weekly in order to manage demo, refurbishment and new

construction of an existing Ethylene unit. Assisted project/field engineer?s with system

turnover and start-up coordination at end of project.

. Project Controls Manager for new construction of Kerr-McGee?s TiO2 Pigment Expansion

Project in Hamilton, MS. Managed various levels of schedule development. Coordinated

integration of cost and schedule. Supervised cost reporting and documentation of changes.

Prepared weekly and monthly cost/schedule analysis reports. Prepared backup for monthly

invoices.

. Planner/Scheduler for ongoing capitol projects at Bethlehem Steel in Baltimore, MD.

Prepared capitol appropriations schedule during conceptual phase of projects. Prepared

detailed construction schedules as the engineering developed. Updated project schedules

weekly for review with Bethlehem?s management team and the capitol work force supervisors.

Worked with Bethlehem scheduler to issue manpower projections on monthly basis for 50+

projects.

. Planner/Scheduler for construction management of Genetics Institute?s Suite ?B? Project

in Andover, MA. Developed fully integrated engineering, procurement, and construction

schedule with the home office scheduler in Cincinnati. Issued proposal schedules for 35

sub-contracts. Monitored all sub-contractors scheduled progress. Held weekly

schedule/coordination meetings. Performed continuous analysis to manage ?Flash Track?

project working days and nights. Started site work when engineering was only 15% complete

. Cost Engineer/Scheduler for construction management of FMC?s agricultural products

plant expansion in Baltimore, MD. Developed construction schedule and client specific

progress reports in order to monitor sub-contractors daily progress. Multiple outages were

required for modularized unit installation with numerous tie-ins to existing piping,

electrical and control systems. Work had to be accelerated by two months in order to meet

client?s seasonal product sales due to a fire and lengthy startup of the modified

facility.

. Planner/Scheduler for construction management of a grass root chemical plant in

Augusta, GA. for International Flavors and Fragrances. Monitored sub-contractors schedules

and measured progress. Updated and issued project schedule for use at weekly

schedule/coordination meetings. Prepared weekly progress report for contractors. Monitored

piping erection and testing progress at the iso and system level on a daily basis at

project completion in order to assist local contractor with meeting expected finish date.

. Planner/Scheduler for fast track construction of a grass roots Ethylene Plant at

Westlake Petrochemicals in Sulphur, LA. Developed construction priorities and field need

dates for all equipment and commodities during the pre-engineering phase of the project.

Developed detailed man-loaded construction schedule. Worked with the home office planner

in Houston to merge the engineering and procurement schedule with the construction

schedule prior to mobilization. Construction started when design was 28% complete.

. Cost Engineer/Scheduler for construction of a phosphate mining facility for CF

Industries, Inc. in Bartow, FL. Maintained existing construction schedule. Developed

client specific cost and quantity tracking databases for all disciplines. Prepared weekly

labor analysis, progress curves and productivity charts. Supervised cost reporting and

forecasting.

. Planner/Scheduler for construction management of an Electrorefinery at Cyprus Miami

Mining Corp. in Globe, AZ. Provided proposal schedules for multiple lump sum bid packages,

evaluated contractors proposal schedules for logic, duration, and proper manloading.

Compiled and integrated all schedules into master project schedule. Assisted with

development of turnover packages and startup of Electrorefinery.

. Planner/Scheduler for construction of a Hydrotreater and Utilities units at Koch

Refinery in Corpus Christi, TX. Developed schedules for specific unit?s, tracked progress,

coordinated construction effort with other area Planners. Worked closely with area

superintendent on manpower planning and progress tracking. Provided turnover and startup

schedule at completion.

. Cost Engineer/Scheduler for construction of a Catalyst Demetallization Unit for Coastal

Refining Company Inc. in Wichita, KS. Tracked schedule progress, collected and reported

cost to the home office, prepared labor analysis and weekly progress report. Prepared

turnover schedule at completion.

. Planner/Scheduler for construction of a recovery boiler for Gulf States Paper Company

in Demopolis, AL. Developed schedule, tracked progress, prepared labor and cost

performance reports. Assisted programmers with development of new progress measurement

database.

. Planner/Scheduler for rebuild of a recovery boiler for Stone Container Corporation in

Florence, SC. Developed and tracked hourly schedule for replacement of superheater,

economizer, piping and electrical modifications to existing boiler. Performed three months

of pre-outage work, and successfully accomplished 30 day outage working around the clock.

. Planner/Scheduler for replacement of two recovery boilers for Georgia-Pacific in Cedar

Springs, GA. Developed totally integrated project schedule with other contractors.

Included engineering, procurement, demolition, erection and startup of each boiler.

Assisted prime contractor and engineering company with integration of all sub-contractors

work plans into the master schedule.

. Turnaround Planner for annual shutdown of the 536 Crude Still at Lyondell Petrochemical

in Houston, TX. Prepared shutdown schedule and monitored progress of piping, electrical,

equipment cleaning and process modifications. Worked for short period as tank farm planner

and estimator.

. Planner/Scheduler for routine maintenance of Dow Chemicals facilities in La Porte, TX.

Ordered materials and scheduled appropriate maintenance personnel and or specialty

contractors on a daily basis in order to maintain on going plant operations.

Employment History:

Jacobs Engineering Group, Inc. 2001 - CurrentPlanner/Scheduler

CDI Engineering, Inc. 2001 - 2001Project Controls Specialist

Jacobs Engineering Group, Inc. 2000 - 2001

Turnaround Planner/Scheduler (3 Month T/A)

CDI Engineering, Inc. 1999 - 2000

Project Controls Leader (6 Month T/A)

Jacobs Engineering Group, Inc. 1996 - 1999

Planner/Scheduler, Cost EngineerABB Lummus Global, Inc. 1995 - 1996

Construction Planner/Scheduler (6 Months)

Jacobs Engineering Group, Inc. 1991 - 1995

Planner/Scheduler, Cost EngineerSunland Construction Company. 1989 - 1991

Planner/SchedulerMundy Construction Company. 1981 - 1989

Pipefitter/Welder and Maintenance PlannerBrown & Root Construction Company. 1975 - 1981

Pipefitter and Material Controls