Post Job Free
Sign in

Engineer Project

Location:
jubail, SH, Saudi Arabia
Salary:
3500.00 sr
Posted:
January 17, 2013

Contact this candidate

Resume:

QAISAR HUSSAIN

Applied Position: Instrument Foreman / Instrument Lead man

Mobile No.: +91-093********(IND.)

+966-0550827246(KSA)

Email Add: ****************@*****.***

Current Location: Saudi Arabia

Availability: I can start for work as soon as possible.

PERSONAL DATA

Age:

36

Date of Birth:

April 04, 1976

Gender:

Male

Civil Status:

Married

Height:

170 cm

Weight:

70 kg

Nationality:

India

Religion:

Muslim

Permanent Address:

Village - Chitkohra,Post -Anisabad, PS- Gardanibag, District-Patna

State - Bihar 800002

WORK EXPERIENCE

I have been working for 12 years total.

With the following instruments and in Calibration shop

Electronic Transmitter AP/GP/DP (SMART Rosemount,Yokogawa)

Temperature transmitter (SMART Rosemount, Yokogawa, Honeywell)

DP type Orifice flow meter (SMART Rosemount)

Calibration of Level Displacer transmitter/ Level Troll ( Fisher )

Calibration of LT, PT/PDT, FT, TT with foundation Fieldbus.

Setting and Repairing of Pressure, level, flow and temperature Switches.

Calibration and Repairing of Pressure Gauges (Diaphragm & Bourdon tube

type)

Calibration and maintenance of all types LINEAR Instruments.

Calibration of Control Valves, Intelligent Positioner (FOXBORO) with FF.

Loop checking of field Instruments up to YOKOGAWA Centum CS 3000 System.

Ability to read and work as per P&ID, ILD, Inst. Location Plan.

Preparation and Verification of Loop Folders.

Panel wiring (PLC, DCS & Relly logics Base Control System)

Honeywell Smart Field Communicator, SFC -160-12n-xc

Pressure Calibrator, DPI 602/610 (Druck)

Dead Weight Pressure Tester, 480DA (Budenberg)

Thermocouple Calibrator, 714 & RTD Calibrator, 712 (Fluke)

Source Simulator Druck TRX- II (GE)

Metrology Well / Temperature Bath (Fluke, GE)

Slip Gauge and Test Bars (Mitutuyo)

Fluke Multifunction Calibrator,model-5720A (Fluke)

SUMMARY OF EMPLOYMENT / DUTIES AND RESPONSIBILITIES

1

Position:

Standard Calibration Technician / Senior Instrument Technician

Duration:

March 31, 2008 - October 31, 2012

Company:

Olayan Descon Ind. Co. Ltd

Company Industry:

Oil / Gas / Petroleum/ Fertilizer

Location

Jubail, KSA

SABIC TERMINAL CENTER

(Aug. 26, 2011 - till On Progress")

Emergency Power Supply Up gradation Project

Proper coordination with the main Client in accordance with SABIC

standards

Close monitoring for all areas that all remove and installation of UPS

system

TASNEE PETROCHEMICAL-KO DRUM PROJECT.

(July 18, 2011 - Aug. 20, 2011)

Proper coordination with the main Client in accordance with their

Calibration standards.

Beach Calibration of all Field instruments before installing in site

TI, TT, PT, LT, DPT and FT.

Installation and calibration of tuning fork type level switches

Loop testing and commissioning of all loops with TASNEE operation

IBN- SINA

(May 27, 2011 - June 12, 2011)

Shutdown Site survey / construction works IBN- SINA /MB-201 and MB-102

MTBE Boiler control upgradation project.

Replace old panel and installing a new one with loop and termination of

DCS - Yokugawa.

SADAF - SABIC PETROCHMECAL COMPANY (Extension of Ethane 30''

Pipe Line Project)

(February 09, 2011 - May 23, 2011)

Installation of field instruments like TT, PT, FT, LT, and control

valves.

Termination and loop checking

AL- HAMMAM COMPANY ; FOR SASREF PROJECT

( May 12, 2011 - September 15, 2011)

Proper coordination for witnessing with 1st party Client JGC & in

accordance with ARAMCO standard for bench calibration of Instrument

Review all calibration certificates as per specification and Standards

and make sure all data are in passing accuracy.

Main scope - Calibration of PT, DPT, FT, LT, TT (Honeywell) and Pressure

and Temperature Gauges using SFC- Honeywell.

SAFCO ; FOR NITROGEN METERING SKID

( January 15, 2011 - February 09, 2011)

Proper coordination for witnessing with 1st party Client NIGC (GAS) & in

accordance with SABIC standard for bench calibration of Instrument with

3rd party Arabian fall Co.

Review all calibration certificates as per specification and Standards

and make sure all data are in passing accuracy.

Main scope - Calibration & Installation of PT, DPT, TT, MVS, Flow boss

(Rosemount) and Pressure and Temperature Gauges using Hart communicator

375.

AL- BAYRONI ; FOR PROJECT RECOVERY OF PROCESS CONDENSATE FOR AMMONIA

UNIT

( October 29, 2010 - January 03, 2011)

Review all calibration certificates as per specification and Standards

and make sure all data are in passing accuracy.

Main scope - Calibration of PT, DPT, FT, LT, TT (Rosemount) and

Pressure and Temperature Gauges using SFC- Honeywell.

2

Position:

Instrument Technician

Duration:

Feb. 11, 2009 - Dec. 27, 2010

Company:

Usha Martin Industries Limited.

Company Address:

Aditypur, Jharkhand

Project Location:

India

Department:

E & I Maintenance

Loop checking and function test of field Instrument

Worked as a console operator for DCS.

Calibration of Flow, Level, Temp. Pressure, Level, Differential Pressure

Transmitters, Indicator and Switches.

Working as an assistant Document Controller for loop folder preparation

with MC department.

3

Position:

Instrument Technician

Duration:

Sept. 2, 2007 - November 22, 2008

Company:

Hardilia Petro Chemical and Oil Refinery

Company Address:

Bokaro, Jharkhand

Department:

E & I

Calibration of Flow, Level, Temp. Pressure, Level, Differential Pressure

Transmitters, Indicator and Switches.

Calibration of Field Instruments.

4

Position:

Instrument Technician

Duration:

December 17, 2004 - July 12, 2007

Company:

BOC Gases, Barma Mines

Project Location:

Jamshedpur, Jharkhand

Department:

E & I

Panel & JB wiring with close loop and open loop.

Loop checking of field instruments UP to PLC and DCS.

Calibration of various types of Transmitters, Safety valves and Pressure

Switches.

EDUCATION DETAILS

S.S.C. passed in Jharkhand Board, in 1997

Passed Intermediate Jharkhand Board in 2001

Diploma in Instrumentation Technology in 2001 - 2004

LANGUAGES SPOKEN

Language

Proficiency Level

(5=Excellent; 1=Poor)

1.

HINDI

5

2.

ENGLISH

3

3.

ARABIC

3

REFERENCES

Sherwin Elnasin

Calibration Engineer

Olayan Descon Ind.Co.Ltd.

Tel.No.: 3-3410671 mobile # 054*******

********@************.***

Relationship: Co-worker

Jarold Magpayo

Proposal Engineer

Olayan Descon Ind.Co.Ltd.

Tel.No.: 3-3410671 ext 252

Email: *********@************.***

Relationship: Co- Worker

Jhun Inserto

Planning Engineer

Olayan Descon Ind.Co.Ltd.

Tel.No.: 3-3410671

Email: ***********@************.***

Relationship: Co-worker

EXPECTED SALARY

3,500 SR (Negotiable)

Flowserve Control Valves

> Proper coordination for wiring for all new

Instruments

> Replacement of all Instruments, Valves, Analyzer

and Switches with new Instruments during shutdown.

> Loop testing and Commissioning of all control

system

A. YANPET ; FOR PP RECOVERY METERING SKID

(May 05, 2010 - July 31, 2010)

> Main scope - Calibration of PT, DPT, FT, LT, TT

(Honeywell) and Pressure and Temperature Gauges

using SFC- Honeywell.

B. SAMREF ; FOR T/A- 2010

(February 08, 2010 - April 29, 2010)

> Site survey with SMREF's technician for planning

of shutdown scope of works

> Removal and Installation of all Instruments after

calibration.

> Cleaning of impulse line and leak testing.

> Calibration of all valves in field.

> Replacement of damaged Instruments

C. IBN-ZAHR ; FOR ESD UP GRADATION PROJECT

(January 18, 2010 - February 06, 2010)

> Shutdown Site survey / construction works IBN-

ZIHR /MTBE 1 and 2 reactor sequence control

project.

> Replace old panel and installing a new one with

loop and termination of DCS - Yokogawa.(Interface

between TRICONYX and YOKUGAWA system)

D. SASREF ; FOR ESD INSTRUMENTATION MASTER PLAN(IMP-II)

PROJECT

(April 02, 2008 - November 01, 2009)

> Construction works for replacing of all

instruments by YOKOGAWA transmitters, valve

positioners, and analyzers.

> Replace of all cables of instrument by new cable

of CS3000 control system of YOKOGAWA.

> Replacement of all DCS system by new Field bus

Instrument system.

> Pre commissioning of all loops with logic check.

> All replacement work done without any shutdown.

2 Position Instrument Technician

:

Duration June 2004 - April 2007

:

Company: Miraj Instrumentation Services.

Company Mathura, Uttarpradesh

Address:

Project India

Location

:

Departme E & I Maintenance

nt:

Loop checking and function test of field Instrument

Calibration of Flow, Level, Temp. Pressure, Level,

Differential Pressure Transmitters, Indicator and Switches.

Working as an assistant Document Controller for loop folder

preparation with MC department.

3 Position Instrument Technician

:

Duration December 2002 - April 2004

:

Company: Technic Construction Company.

Company Jamshedpur, Jharkhand

Address:

Project India

Location

:

Departme T & I

nt:

Calibration of Flow, Level, Temp. Pressure, Level,

Differential Pressure Transmitters, Indicator and Switches.

Calibration of Field Instruments.

PM of all Instrument such as SOV, PT, TT, FT, LT, and

Controllers

4 Position Instrument Technician

:

Duration February 1998 - July 2001

:

Company: BKPL (Barauni-Kanpur Pipe Line)

Company

Address: Patna

Department: E&I

> Calibration of Flow, Level, Temp. Pressure, Level,

Differential Pressure Transmitters, Indicator and Switches.

> Calibration of Field Instruments.

> PM of all Instrument such as SOV, PT, TT, FT, LT, and Controllers

EDUCATION DETAILS

S.S.C. passed in Bihar Board, in 1994

Passed Intermediate in B.I.E. Council in 1998

Diploma in Instrumentation Technology(ITI) in 1995 - 1997

B.Sc. in Industrial Electronics from VMU in 2012

PASSPORT DETAILS

1. Passport No. : F8856073

2. Date of issue : 18-08-2006

3. Date of expiry : 17-08-2016

4. Place of issue : Patna

LANGUAGES SPOKEN

Language Proficienc

y Level

(5=Excelle

nt;

1=Poor)

1 HINDI 5

.

2 ENGLISH 3

.

3 ARABIC 3

.

REFERENCES

M. Fariduddin Calibration Engineer

Olayan Descon Ind.Co.Ltd.

Tel.No.: 3-3410671 mobile # 053*******

*****@************.***

Relationship: Co-worker

Mohsin Munir Project Engineer

Olayan Descon Ind.Co.Ltd.

Tel.No.: 3-3410671 mobile # 056*******

Email: ******@************.***

Relationship: Co- Worker

Jhun Inserto Planning Engineer

Olayan Descon Ind.Co.Ltd.

Tel.No.: 3-3410671

Email: ***********@************.***

Relationship: Co-worker

END OF DOCUMENT



Contact this candidate