Post Job Free
Sign in

Project Manager Management

Location:
Crown Point, IN, 46307
Posted:
March 09, 2010

Contact this candidate

Resume:

_______________________________________________________

Naser M. Hussein

**** ******** ***** ***** *****, Indiana 46307

Home 219-***-**** Cell 407-***-****

E-mail: ********@*********.***

Engineering/IT Project Manager

Engineering/IT Project Manager with a record of successful leadership at recognized

companies including Donaldson, UPS, Food Lion, and AA Electromechanical. Extensive

experience in Engineering, Distribution, Logistics, Transportation, Inventory Management, and

Supply chain systems. Bachelor of Science in Electrical Engineering with a minor in

Industrial Engineering. Demonstrated Expertise in Project Management, Slotting

Optimization, WMS Manhattan Open Systems, Exceed WMS/DMS, MS Operating Systems,

implementing effective process control and improvement strategies, establishing labor and

quality standards, budget and expense control management, leading and managing team to

meet goals and objectives.

Cost Analysis/Planning Budget Management Production Planning

Strategy Deployment Customer Relations Change Management

Supply Chain Systems Inventory Management MS Operating Sys.

Project Management Strategy Deployment Parcel/LTL/TL

Facility Layout and Design Manhattan WMS Exceed WMS/DMS

Transportation Management Pick Strategies Labor Management

Material Handling Methods Continuous Improvement Order Fulfillment

Lean Slotting Optimization OSHA

W ork Measurement Network Technology

PROFESSIONAL EXPERIENCE

_______________________________________________________

DONALDSON CO., INC. RENSSELAER, IN

Leading global provider of filtration solutions and replacement parts with annual revenues of two

Billion dollars.

Engineering/IT Project Manager 2008-Present

Established and Maintained Implementation Procedures for Manhattan WMS.

Managed and Mentored the Implementation Team including consulting firm and Donaldson

internal team for Manhattan WMS implementation.

Designed and implemented Manhattan WMS slotting and picking methods projects which

result on increasing productivity by 47% and cut the annual labor cost by $3,000,000.

Reduced Package and shipping material cost by20%.

Managed and configured zones, items and locations in Manhattan WMS.

Maintained Data and zones, items and locations integrity in Manhattan WMS.

Built Database tools for daily reports and tracking packing and shipping status.

Improved building and locations utilization by 20%.

Developed new and improved operation processes by analyzing and improving the

distribution center layout.

Managed the IT support team and reduced operation down time.

Conducted project communication meetings, presentations and documentation.

Project management of project plan, scope, costs, schedule and quality of deliverables.

Defined and ensured projects resources requirements are staffed to appropriate levels.

Managed project resource participation and effective contribution.

Managed and documented project issues and risk mitigation through resolution.

Naser M. Hussein -Resume Page Two

_______________________________________________________

LOWE’S, INC., REGIONAL DISTRIBUTION CENTER, KISSIMMEE, FL

Lowe’s is the second largest Home Improvement Company in the world, FORTUNE 50 industry

leader with more than 1,500 stores and 30 distribution centers.

Regional Planning Manager, Project Manager 2007-2008

Responsible for all administrative processes at the RDC, including budget and expense

administration, performance reporting, inventory control, receiving office, Exceed WMS,

quality assurance and logistics.

Produced daily production plans that met or exceeded customer service level expectations

while achieving maximum operating efficiency.

Developed short and long-range staffing plans based on productivity objectives and

forecasted volume requirements.

Managed and configured zones, items and locations in Exceed WMS Application.

Maintained zones, items and locations integrity in Exceed WMS Application.

Developed new and improved operation processes by analyzing and improving the

distribution center layout.

Managed relationships and communications with external constituencies such as corporate

logistics, store operations, merchandise vendors, and distribution network management.

Implemented and maintained effective daily operational and administrative processes to

ensure accurate inventory accounting to meet annual inventory shrink objectives.

Developed, and retained effective RDC planning and administration team.

Developed and analyzed strategic and tactical operational and systemic improvements to

meet current and future service, throughput, and cost objectives.

Achieved 99.89% Inventory accuracy for the Central Florida DC.

Increased building utilization by 25% and increased operation throughput per hour by 37%.

Met the cost plan and ranked as the number one DC in achieving results for three quarters

in the row.

Introduced and implemented the Balance Score Card to Lowe’s.

UPS CORPORATION, ORLANDO, FL

UPS is the world's largest package delivery company and a leading global provider of

specialized transportation and logistics services with over 450,000 employees.

Industrial Engineering, Project Engineer 1998-2007

Responsible for Volume forecasting, work measurements and staffing plans for Central

Florida District.

Prepared the district quarterly cost plans to meet the corporate goal.

Facilities and Operations designs and implementations to increase cost effectiveness,

buildings capacity and productivity.

Balanced UPS fleet between the centers for best vehicle utilization and cost effectiveness.

Prepared the new package vehicles yearly order for Central Florida District.

Performed IE audits on various operation functions.

Prepared the monthly Balance Score Card for the District.

Worked with the corporate office to setup the semiannually QPR elements.

Increased vehicles utilization by 27% and route utilization by 29%.

Senior Network Administrator, Information Technology/Project Manager

Implemented and customized various UPS shipping applications for UPS Logistic customers.

Led the technical support team for Window 95, NT, 2k, XP, and Novell, OS/2 Operating systems,

IBM mainframe applications and UPS proprietary applications.

Installed operating systems, applications software, hardware devices and drivers.

Disaster planning and recovery, disk fault tolerance (RAID implementations).

SQL server administration, backup, configuration, installing, updating, security administration.

Installed, configured, managed, monitored network protocols, WINS, DNS and Active Directory.

Managed security by configuring and implementing system, group, password, account lockout and

an audit policy.

Installed and configured IBM and CISCO switches and routers.

Naser M. Hussein -Resume Page Three

_______________________________________________________

FOOD LION, CORP., ORLANDO, FLORIDA

Food Lion, LLC, as part of the Delhaize Group, with more than 1,200 retail stores in 11 states.

Store Manager 1992-1998

Supervised and managed store departments mangers and employees.

Achieved budgeted financial and operating results.

Maximized store sales and profitability by ensuring the execution of promotional and

merchandising programs in accordance with Customer Support Center (CSC) plans.

Created an environment for continual learning and encouraged an open dialogue among

associates.

Analyzed financial and operating results to determine where the store stands relative to

budgeted sales, expenses, and payroll, Worked with store associates to identify the root

causes of issues and inefficiencies.

Monitored shrink and ensured that moneys are accounted for properly. Ensured that order

and security controls are in place, consistent with standard practices.

Promoted effective vender relations.

Earned twenty eight Manager of the Month Award within my six years at Food Lion.

A.A. ELECTROMECHANICAL, UNITED ARAB EMIRATES

Engineering company specialized in building water treatment plants.

Field Project Manager/Electrical Engineer 1987-1992

Designed and implemented plans for new water treatment plants.

Managed up to 60 Engineers and technicians in different projects sites.

Installed and preformed reliability testing for electrical & electronics instruments, including

control systems including power distributions and high voltage generators.

Programmed telemetry systems for water treatment plants.

Installed, calibrated zone generator system.

Involved in designing of the power distribution and control panels for sewage pumping

plant projects.

Reviewed projects for compatibility with the plant's long-term maintenance strategy

utilizing best available technology with consideration for minimized equipment life cycle

Costs.

EDUCATION

_______________________________________________________________

Bachelor of Science in Electrical Engineering with a minor of Industrial Engineering.

University of Central Florida, Orlando, Florida.

Diploma in Network Technology. Dean’s List for Outstanding Academic Achievement

(GPA: 4.0).

Herzing College, Orlando, Florida.

PROFESSIONAL DEVELOPMENT/CERTIFICATIONS

_______________________________________________________________

Microsoft System Engineer (MCSE) Microsoft Professional (MCP)

Microsoft Project. Distribution Management System (Exceed)

Project Management Manhattan WMS

MS SQL Administrator W ork Measurements

Principles of Leadership Time Management

Organizational Skills Khalix (Finance Application)

Interviewing Skills W orkflow System

Lean Essentials Kaizen Event Basics

Change Management Six Sigma

Microsoft Visio DOT/IATA Dangerous Goods

PROFESSIONAL AFFILIATION

_______________________________________________________________

Member of the Jordanian Engineering Association, since 1986

Member of University of Florida Engineering Alumni, since 1986

Naser M. Hussein -Resume Page Four

REFRENCES

_______________________________________________________________

Mark Scott, Human Resource Manager, Donaldson Co, Inc.

Phone: 219-***-****

Debbie Hanley, Inventory Planning Manager, Donaldson, Co, Inc.

Phone: 219-***-****

Kathleen Flagg, Plant Controller, Avery Dennison Graphics Division

Phone: 219-***-****



Contact this candidate