Post Job Free
Sign in

Project Manager Engineer

Location:
Atlanta, GA, 30338
Posted:
March 09, 2010

Contact this candidate

Resume:

PRASANTH MALISETTY, E.I.T

**** ******* ******** **, *** 11115, Atlanta, GA 30338

Mobile: 404-***-****; e-mail: **********@*******.***

SUMMARY

Versatile experience in Traffic Engineering and Transportation Planning

Worked on a variety of projects involving Traffic Engineering Studies, Signal Timing and

Coordination, Traffic Impact Studies and Corridor Studies

Proven ability to work as a team player, mentor team members and work under pressure for

short deadline projects

Experience in writing project proposals, scheduling and maintaining clients

Proficient in Traffic Engineering software such as HCS+, Synchro, aaSIDRA, SimTraffic,

CORSIM. Skilled in Travel Demand Modeling software such as Cube and TransCAD

AREAS OF EXPERTISE

Traffic Engineering Studies Traffic Impact Studies

Signal Timing and Coordination Traffic Forecasting

Corridor Studies Air Quality and Noise Analysis

PROFESSIONAL EXPERIENCE

Sep 2005 – May 2009

Traffic Engineer, URS Corporation, Atlanta, GA

Responsibilities included Traffic Engineering Studies, traffic forecasting and impact studies for

existing and future conditions on corridors and proposed developments. Developed signal timing

and coordination plans and responsible for implementing the timing plans along the corridor. Was

involved in writing proposals, scheduling, execution of projects and client maintenance. Mentored

team members with transportation planning and traffic engineering principles and usage of software

programs including Synchro, HCS, Cube and CARE.

Key Projects

GDOT Metro Signal Timing, Atlanta, GA: Responsible for developing and implementing signal

timing and coordination plans along Candler Road (19 intersections) and Keith Bridge Road (5

intersections) corridors. Performed database conversions, controller upgrades and maintenance

State Route (SR) 92 Corridor Study, Cobb and Paulding Counties, GA: Responsible for traffic

forecasting, accident/safety analysis, capacity analysis, and operations analysis along the corridor.

Also performed air quality and noise analyses

15th Street HOV Freeway Interchange, Atlanta, GA: Responsible for surface street and freeway

capacity analysis, traffic forecasting, and traffic impact analysis report for the proposed HOV

Freeway Interchange. Also analyzed air quality and noise levels along the study area

May Creek (City of Kingsland), Magnolia Holdings (Brantley County) Studies, GA: Responsible for

traffic impact analysis for a mixed-use development including one millions sq ft of retail space

and 2500 residential units in City of Kingsland and a three phased mixed-use development

including 3620 residential units, 320 acres of retail space and golf course in Brantley County

14th Street Bridge Detour Travel Time Study, Atlanta, GA: Responsible for forecasting the detoured

traffic volumes and developing a simulation model network for 73 intersections and determined

the travel time before and after detour using SimTraffic

GDOT Statewide Traffic Engineering Studies: Responsible for performing traffic engineering studies

for intersections on state routes at various locations in Georgia. Performed intersection safety

analysis, signal warrant analysis and capacity analysis

GDOT District One Access Management Engineer: Responsible for reviewing the driveway permit

applications in District and helped the District supervisor in processing applications

PRASANTH MALISETTY Page 2

May 2004 - Aug 2004

Engineer Intern, Day Wilburn Associates, Inc., Atlanta, GA

Responsibilities included traffic impact studies for small developments, signal timing, updating travel

demand model and assisting project manager in regional impact studies.

Key Projects

Mt. Pleasant Study, SC: Responsible for updating the QRS model developed for the City of Mt.

Pleasant and identifying the affected routes and intersections

Forte & Hunter Traffic Studies, GA: Responsible for performing a regional impact study for new

developments and proposing mitigation for existing and future conditions

South Myrtle Beach Study, SC: Responsible for performing a regional impact study for a new retail

center development south of Myrtle Beach

Peachtree Corridor Study, Atlanta, GA: Responsible for performing a corridor study, analyzing the

intersections and developing signal timings

Aug 2003 - Dec 2004

Graduate Research Assistant, Clemson University, Clemson, SC

Responsibilities included providing analytical solutions and researching the effects of parking lot

allocations during special events. Extensively utilized GIS applications in developing a travel demand

model.

Key Projects

Football Traffic Study: Responsible for researching reallocation of parking lot assignment during

Clemson University football games based on the spatial allocation of attendees. Identified

optimum routes using TransCAD and analyzed impacts on traffic circulation

Highway Capacity and Work Zones: Duties involved data collection and analysis of data on an

interstate work zone lane closure. Determined the capacities of the lane, passenger car

equivalents and generating the speed-flow curves from the data

PROFESSIONAL REGISTRATIONS

Engineer-In-Training (E.I.T), Michigan, October 2004

EDUCATION

MS, Civil Engineering, Clemson University, Clemson, SC Aug 2003 - Dec 2004

BE, Civil Engineering, Osmania University, Hyderabad, India Aug 1999 - May 2003

COMPUTER SKILLS

Software Synchro, HCS, aaSIDRA, Traffix, Tru-Traffic TS/PP, SimTrafffic,

CORSIM, Cube, TransCAD, QRS, ArcGIS, TNM2.5, CAL3QHC,

Mobile 6.2, AutoCAD, Microstation, PC-Travel

Languages C, C++, SQL, PL/SQL, PERL

Packages MS Office, TP+, SAS

Operating Systems Windows 95/98/2000/2003/XP, UNIX and MS-DOS

Databases ACTRA, MS Access, Oracle, MS – SQL Server

PUBLICATIONS

Optimal Parking Reallocation for Special Events: Geographic Information System Analysis, Transportation

Research Board 85th Annual Meeting Compendiums of Papers CD-ROM



Contact this candidate